Jindalee Lithium Limited (Jindalee, or the Company; ASX: JLL, OTCQX: JNDAF) is pleased to advise that the
Company has initiated a value optimisation program focused on unlocking significant magnesium (Mg) value
from its 100% owned McDermitt Lithium Project (McDermitt, Project), one of the largest lithium deposits
in the United States (US) and of global significance1.
Magnesium – a US Critical Mineral
Magnesium’s strength, light weight and durability make it critical for defence, aerospace and automotive
industries. Specifically, Magnesium has had a long-standing role in defence manufacturing, where it is used
extensively in aerospace alloys, military vehicles and countermeasure flares2. With China controlling ~90%
of global supply, the US faces significant vulnerability3.
Magnesium metal is ranked in the highest risk category of the 84 mineral commodities assessed in the US
Geological Survey’s 2025 draft list of Critical Minerals4 and is included on the Critical Materials List published
by the US Department of Energy5 (Figure 1).
US Magnesium LLC6, previously the only domestic producer of primary magnesium, ceased operations in
20227 and filed for Chapter 11 bankruptcy protection in September 20258, leaving the US supply chain
vulnerable to disruption.
The US government is investing heavily in domestic critical minerals supply to reduce reliance on foreign
suppliers and strengthen US economic and national security, with PL 119-21 (“One Big Beautiful Bill Act”)
signed in July 2025 directing approximately US$11.8B towards critical minerals and defence industrial base
needs9.
JNDAF
22 October 2025
Jindalee to explore high value
magnesium by-product at McDermitt
• Jindalee to initiate a value optimisation program evaluating magnesium production
pathways ahead of commencement of Feasibility Study
• Magnesium, previously treated as waste in the PFS, offers a significant value creation
opportunity at McDermitt
• McDermitt has the potential to be repositioned as a dual-product project, supplying both
lithium and magnesium in line with US critical mineral priorities
Evaluation of Magnesium Potential at McDermitt – October 2025
Figure 1 – US Department of Energy Medium-term (2025-2035) Criticality Matrix4
Magnesium: From Waste to Strategic Opportunity
The McDermitt Pre-Feasibility Study (PFS) released in November 2024 confirmed a 63 year life with the
Project producing 1.8Mt Lithium Carbonate at C1 costs of US$8,670/t for the first 40 years, with a 5 year
payback1. While the PFS identified scope to enhance project economics through process optimisation and
potential Mg by-product recovery, it treated magnesium as waste, removing it as magnesium sulphate
(MgSO₄) with no revenue credit applied.
With magnesium officially designated a high-risk critical mineral by the US Government3—alongside
lithium—Jindalee is initiating a value optimisation program ahead of commencement of the McDermitt
Feasibility Study. This work will assess how best to recover and monetise magnesium streams previously
discarded, positioning McDermitt as a potential dual-product project aligned with US critical minerals
priorities.
Prior McDermitt Metallurgical Testwork – Magnesium
Metallurgical testwork completed for the PFS confirmed that both lithium and magnesium can be efficiently
extracted using sulphuric acid leaching. Table 1 highlights high magnesium head grades in the leach solution,
supporting the potential for scalable recovery.
Evaluation of Magnesium Potential at McDermitt – October 2025
Unit
Head Grade (assay %)
Lithium Calcium Magnesium
4 0.20 5.3 4.9
6 0.20 5.1 5.3
8 0.15 4.8 4.3
10 0.16 4.7 3.6
Table 1 – Sample Head Grade for lithium and magnesium in leach solution1
Samples from key mineralised units1 were beneficiated to a 250-micron (µm) cut size and leached directly
under standard conditions. As shown in Table 2, this material returned magnesium recoveries of up to 97%,
with lithium extraction also exceeding 87%. These results demonstrate the possibility for dual-product
recovery and support further evaluation of magnesium as a strategic revenue stream.
Unit
Leach Feed
(100% passing µm)
Li Extraction
(500 kg/t)
Mg Extraction
(500 kg/t)
4 250 96.8% 97.2%
6 250 91.9% 95.3%
8 250 91.5% 87.7%
10 250 89.2% 92.6%
Table 2 – Lithium and Magnesium Extraction Recovery within 1.5-4 hours
Review Objectives
While fertiliser-grade magnesium sulphate (MgSO₄ or Epsom salt) was identified as a potential by-product
in the PFS, its relatively low market value limits strategic appeal. As part of the upcoming review, Jindalee
will assess downstream processing opportunities to produce alternative higher-value magnesium products.
This includes evaluating alternate flowsheet configurations that could enable the production of magnesium
compounds suitable as precursors for primary magnesium metal. If viable, these pathways would position
McDermitt to contribute meaningfully to US domestic magnesium supply—alongside battery-grade lithium
carbonate—at a time when both minerals are classified as critical by the US Government3,4.
Jindalee’s Managing Director and CEO Ian Rodger commented: “Although the McDermitt PFS focused on
maximising lithium extraction, we have always been aware of the significant magnesium endowment at
McDermitt and the potential for magnesium by-products to enhance Project economics. Our review is designed
to investigate whether these streams considered as waste in the PFS can be converted into value-add magnesium
products, including precursors to primary magnesium metal. Magnesium is essential for US economic and
national security, and if successful, this work could position McDermitt to play a strategic role in strengthening
domestic supply.”
Next Steps
• Value optimisation program underway to assess magnesium recovery pathways and product options.
• Engage with specialist partners and US Government stakeholders.
Outcomes from this work will inform the forward work plan and any future updates to the market.
1 Lithium enriched units (Units 4, 6, 8 and 10) collected from diamond core located within a preliminary pit shell defined at the
commencement of the PFS, representing the early years of mine life. A total sample mass of 630kg was shipped to Hazen Research
Inc. (Hazen) in July 2023, comprising approximately 70% from core and 30% from assay rejects
Evaluation of Magnesium Potential at McDermitt – October 2025
Authorised for release by the Jindalee Board of Directors. For further information please contact:
IAN RODGER LINDSAY DUDFIELD
Managing Director & Chief Executive Officer Executive Director
T: + 61 8 9321 7550 T: + 61 8 9321 7550
E: enquiry@jindaleelithium.com E: enquiry@jindaleelithium.com
References
1. Jindalee Lithium ASX announcement 19/11/2024: “McDermitt Lithium Project Pre-Feasibility Study”
2. Source: https://www.youtube.com/watch?v=WNdTMQt33qk (IMA Webinar: Magnesium in Aerospace & Defense
Applications)
3. Source: https://www.semafor.com/article/11/17/2024/china-expands-export-controls-on-critical-minerals
4. Source: https://pubs.usgs.gov/of/2025/1047/ofr20251047.pdf
5. Source: https://www.energy.gov/cmm/what-are-critical-materials-and-critical-minerals
6. Source: https://usmagnesium.com/
7. Source: https://projectblue.com/blue/news-analysis/1078/us-magnesium-to-idle-operations
8. Source: https://www.fox13now.com/news/local-news/northern-utah/us-magnesium-files-for-chapter-11-bankruptcy-
as-utah-seeks-to-shutter-operations
9. Source: https://www.congress.gov/bill/119th-congress/house-bill/1/text
About Jindalee
Jindalee Lithium is an Australian company focused on developing the McDermitt Lithium Project, one of the largest lithium
resources in the U.S. With 100% ownership and unencumbered offtake rights, Jindalee is strategically positioned to support
America’s energy security and domestic supply of critical minerals. The Company recently completed a Pre-Feasibility Study
(PFS) confirming McDermitt’s scale, long-life, and low-cost production potential, with strong engagement from U.S.
government agencies, including the Department of Energy and Department of Defense. As a deeply undervalued lithium
developer, Jindalee presents a compelling investment opportunity ahead of the next lithium market upcycle.
Competent Persons Statement
he information in this report that relates to Exploration Results is based on information compiled by Mr Lindsay Dudfield. Mr
Dudfield is a director and shareholder of, and consultant to, the Company and a Member of the Australasian Institute of Mining
and Metallurgy and the Australian Institute of Geoscientists. Mr Dudfield has sufficient experience relevant to the styles of
mineralisation and types of deposits under consideration, and to the activity being undertaken, to qualify as a Competent
Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Minerals Resources and
Ore Reserves.’ Mr Dudfield consents to the inclusion in this report of the matters based on this information in the form and
context in which it appears.
The Company confirms that it is not aware of any further new information or data that materially affects the information
included in the original market announcements by Jindalee Lithium Limited referenced in this report and in the case of
estimates of Mineral Resources, production targets and Ore Reserves, that all material assumptions and technical parameters
underpinning the estimates in the relevant market announcements continue to apply and have not materially changed. To the
extent disclosed above, the Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the original market announcements.
Forward-Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include but are not limited to
statements concerning Jindalee Lithium Limited’s (Jindalee’s) current expectations, estimates and projections about the
industry in which Jindalee operates, and beliefs and assumptions regarding Jindalee’s future performance. When used in this
document, the words such as “anticipate”, “could”, “plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”, “should”,
and similar expressions are forward-looking statements. Although Jindalee believes that its expectations reflected in these
forward-looking statements are reasonable, such statements are subject to known and unknown risks, uncertainties and other
factors, some of which are beyond the control of Jindalee and no assurance can be given that actual results will be consistent
with these forward-looking statements.
Annexure A: JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the minerals
under investigation, such as down hole gamma sondes, or handheld XRF
instruments, etc). These examples should not be taken as limiting the broad
meaning of sampling.
• Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
• Aspects of the determination of mineralisation that are Material to the Public
Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules) may warrant
disclosure of detailed information.
• Diamond drilling was used to collect HQ triple tube (HQ3 63.5mm) diameter
core.
• Core was cut and quarter core sampled on 1.5m intervals or lithological and/or
alteration boundaries.
• Colluvium/overburden was not sampled.
• All samples were placed into individually labelled, consecutively numbered
sample bags.
• Metallurgical test work samples were a composite sample of quarter core or
coarse rejects from the previously conducted geochemical assaying and are
believed to be representative of the interval under investigation.
• The samples (approximately 700kg total) came from holes MDD004, MDD006,
MDD012, MDD018, MDD023 and MDD026 with samples taken from Units 4, 6,
8 and 10 within the Indicated portion of conceptual Pit Shell 5 (nominal 0-20
years).
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
• Diamond drilling was used to collect HQ3 (63.5mm) diameter core.
• Core holes were drilled vertically, and core was not oriented.
Drill sample
recovery
• Method of recording and assessing core and chip sample recoveries and
results assessed.
• Measures taken to maximise sample recovery and ensure representative
nature of the samples.
• Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.
• Core blocks inserted by the drilling company indicated the length of a run and
the amount of recovered core in feet. The site geologist converted this to
metres and core recovery was recorded on the sampling sheet. Core recovery
was the primary focus for the drill contractor and was typically >90% in the
zones of interest.
• Core recovery was recorded by the site geologist, and 1m downhole depths
marked prior to geological logging and sampling.
• No relationship between recovery and grade was observed, no core loss was
observed over the interval under investigation.
Logging • Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
• Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.
• Qualitative lithological descriptions were recorded by the field geologist once
core had been presented and depths marked. Correlation of this information to
the field mapping and stratigraphic sections described in the immediate area is
ongoing to build a comprehensive picture of the geology over the project area.
• Photos (wet and dry) were taken of all core trays for later review.
Criteria JORC Code explanation Commentary
• The total length and percentage of the relevant intersections logged.
Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half or all core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
• Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling is representative of the in-situ
material collected, including for instance results for field duplicate/second-half
sampling.
• Whether sample sizes are appropriate to the grain size of the material being
sampled.
• Core was cut, and quarter core sampled over 2m intervals.
• The samples were individually crushed to 70% passing less than 2mm, and
500g sub samples were riffle split off by ALS Laboratories in Reno, Nevada
with the remaining samples (coarse residues) averaging approximately 1.7kg
each.
• Quarter core and the coarse residue samples from ALS Laboratories were
forwarded to Hazen Research Inc. in Golden, Colorado (Hazen) where they
were crushed to 100% passing 1.7mm before compositing to be used for the
metallurgical testwork documented in this announcement.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make and
model, reading times, calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy (ie lack of bias) and precision have been established.
• Samples were originally assayed by ALS Laboratories in Reno, Nevada via a 4-
acid digest of a 0.25g sample split with a 48 element ICP-MS finish as
previously reported.
• Hazen analysed the head sample for Li and a range of other elements using 4-
acid digest and peroxide fusion digest with the digested solution analysed by
ICP-OES.
• Laboratory QAQC involves the use of internal lab standards, splits and
replicates as part of in-house procedures. Hazen participates in numerous
external umpire assessments to maintain high levels of QAQC in relation to
their peers.
Verification of
sampling and
assaying
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data verification, data
storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Assay results were verified by more than one Jindalee geologist.
• Data from Hazen is received and stored electronically. To date no .pdf
certificates have been received for the assays completed by Hazen.
Location of
data points
• Accuracy and quality of surveys used to locate drill holes (collar and down-
hole surveys), trenches, mine workings and other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Drill hole locations were surveyed using a handheld Garmin GPS with an
accuracy of +/- 3m horizontally, and +/- 5m vertically; hole positions were also
checked against a Digital Elevation Model (DEM).
• Locations are reported in metres NAD83 Zone11.
• Downhole surveys were undertaken at approximately 30m intervals downhole
and at the end of hole. The maximum variation from vertical observed was 1.7°,
typically <0.5°, with a survey accuracy of +/- 0.1°.
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the degree
of geological and grade continuity appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and classifications applied.
• Spacing of drilling and associated sampling is adequate for assessment of the
areas and geological horizon(s) of interest.
• An Indicated and Inferred Mineral Resource has been estimated for the
McDermitt Project (refer Jindalee’s ASX announcement dated 27/02/2023 for
Criteria JORC Code explanation Commentary
• Whether sample compositing has been applied. further details).
• Sample compositing was undertaken for metallurgical test work as described
above.
Orientation of
data in
relation to
geological
structure
• Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit type.
• If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias, this
should be assessed and reported if material.
• Vertical drill holes were appropriate for assessing the flat lying units of interest.
Downhole lengths reported are therefore the same as true widths.
Sample
security
• The measures taken to ensure sample security. • Samples were collected by qualified geological consultants engaged by
Jindalee and stored on site in locked sample storage bins provided by ALS
Laboratories, who then collected the bins and transported them to their facilities
in either Reno or Elko, USA.
• Metallurgical samples were sent from ALS Laboratories in Reno, Nevada to
Hazen Research Inc. in Golden, Colorado, USA.
• All samples were received as expected by the laboratories with no missing or
mis-labelled samples.
Audits or
reviews
• The results of any audits or reviews of sampling techniques and data. • The testwork undertaken by Hazen was supervised by metallurgists employed
by Hazen and reviewed by senior metallurgists and chemical engineers from
Fluor Corporation.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and ownership including agreements
or material issues with third parties such as joint ventures, partnerships,
overriding royalties, native title interests, historical sites, wilderness or
national park and environmental settings.
• The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
• Samples reported are all from land managed by the US Bureau of Land
Management, with the mineral rights held under placer and lode claims
owned 100% by HiTech Minerals Inc., a wholly owned US based subsidiary
of Jindalee Lithium Limited.
• No joint ventures or royalty interests are applicable.
Criteria JORC Code explanation Commentary
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by other parties. • At McDermitt, historic uranium exploration by Chevron first identified the
presence of lithium. No data from historic work undertaken within the
McDermitt Project area has been obtained.
Geology • Deposit type, geological setting and style of mineralisation. • Lithium is hosted in flat-lying, lacustrine sediments deposited within the
Tertiary aged McDermitt caldera.
Drill hole
Information
• A summary of all information material to the understanding of the exploration
results including a tabulation of the following information for all Material drill
holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in metres) of
the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the information
is not Material and this exclusion does not detract from the understanding of
the report, the Competent Person should clearly explain why this is the case.
• Please see table and figures in main body of text, including in previous
releases referenced above.
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (eg cutting of high grades) and cut-off
grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of high grade results
and longer lengths of low grade results, the procedure used for such
aggregation should be stated and some typical examples of such
aggregations should be shown in detail.
• The assumptions used for any reporting of metal equivalent values should be
clearly stated.
• Significant intercepts are presented as a weighted average above a 1000ppm
Li cut-off, with a maximum of 10 feet (3.05m) internal ‘waste’ (where ‘waste’ is
defined as intervals with less than 1000ppm Li) and a minimum downhole
width of 20 feet (6.1m).
• Conversion from Li ppm to Li2O is achieved by multiplying by 2.153 and
converting to %.
• Lithium carbonate equivalent (LCE) is calculated by taking the Li value and
multiplying by 5.323 to determine the molar equivalent in standard industry
fashion.
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly important in the reporting of Exploration
Results.
• If the geometry of the mineralisation with respect to the drill hole angle is
known, its nature should be reported.
• If it is not known and only the down hole lengths are reported, there should
be a clear statement to this effect (eg ‘down hole length, true width not
known’).
• Vertical drill holes were appropriate for assessing the flat lying units of
interest. Downhole lengths reported are therefore the same as true widths.
Diagrams • Appropriate maps and sections (with scales) and tabulations of intercepts
should be included for any significant discovery being reported These should
include, but not be limited to a plan view of drill hole collar locations and
appropriate sectional views.
• See main body of announcement.
Criteria JORC Code explanation Commentary
Balanced
reporting
• Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration Results.
• Only selected metallurgical test results relevant to this release have been
reported.
Other
substantive
exploration
data
• Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical survey
results; geochemical survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density, groundwater, geotechnical
and rock characteristics; potential deleterious or contaminating substances.
• Field mapping across the project area, aerial photography and description of
stratigraphic sections exposed in several escarpments allows for correlation
of the geology between drill holes.
• Metallurgical test work is reported herein. Other data published is from
previous releases and references to these have been provided.
Further work • The nature and scale of planned further work (eg tests for lateral extensions
or depth extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible extensions, including the
main geological interpretations and future drilling areas, provided this
information is not commercially sensitive.
• Metallurgical testwork (previously announced) has indicated high lithium
recoveries from leaching with sulphuric acid at moderate temperature and
atmospheric pressure and that the mineralised material can be beneficiated
using attrition scrubbing.
• Further metallurgical test work is currently underway to identify improved
options for lithium extraction ahead of a Pre-feasibility Study (PFS) expected
to be completed by mid-2024.
• Additional drilling is planned to define extensions to known mineralisation,
upgrade the mineral resource estimate and obtain samples for further
metallurgical testwork.