JLL Secures Funding to Advance McDermitt Lithium Project
Released
Released
Announcement PDF
JLL
JNDAF
4 July 2024
Jindalee Secures Up to $6.7M in
Funding to Advance McDermitt Lithium
Project
• Jindalee is seeking to raise $6.7 million, through a combination of a Placement, Entitlement Issue
and Convertible Notes, with the potential to raise up to a further $9.0 million in Convertible Notes.
Total firm commitments of $4.1 million
• Firm commitments for a Placement to raise gross proceeds of approximately $0.6 million from
institutional investors, directors and management, at an issue price of $0.30 per share, including a
$0.5 million commitment from Mercer Street Global Opportunity Fund II, LP and other funds
managed by US-based C/M Capital Partners, LP (Mercer Street)
• Opportunity for eligible shareholders to participate via a non-renounceable Entitlement Issue on a
1 for 6 basis to raise up to approximately A$3.1 million on the same terms as the Placement
• Strong support indicated from directors and management in the Entitlement Issue with precommitments received for approximately A$0.5 million
• Every two shares under the Placement and Entitlement Issue will be accompanied by two freeattaching options in total (one ‘Short Term Option’ and one ‘Long Term Option’), with Placement
options subject to shareholder approval
• Funding facility of up to $12 million via Convertible Securities received from Mercer Street with an
initial tranche of $3.0 million ($1.5 million of which is subject to shareholder approval) and
additional potential funding of up to $9.0 million by mutual agreement
• Funds to be directed to deliver value optimisation opportunities in the McDermitt PFS, which are
expected to improve capital intensity and operating costs (versus initial PFS scope) and provide
runway to achieve several key value catalysts in H2 2024, including the optimised PFS and potential
for non-dilutive US government grant funding
Engage with this announcement at the Jindalee Investor Hub
Jindalee Lithium Limited (Jindalee, the Company) is pleased to announce that it is seeking to raise up to $6.7
million (Capital Raise), with total firm commitments of $4.1 million, to allow Jindalee to progress work at
the Company’s McDermitt Lithium Project (McDermitt, Project), which hosts the largest lithium deposit in
the USA1 (Table 1).
The Capital Raise consists of three elements:
•
a placement of approximately $0.6 million to institutional investors, directors and management at
$0.30 per fully paid ordinary share (Share) with Attaching Options (Placement);
Jindalee Lithium Limited
ABN 52 064 121 133
Level 2, 9 Havelock Street, West Perth, WA, 6005
PO Box 1033, West Perth, WA 6872
www.jindaleelithum.com
E: enquiry@jindalee.net
P: +61 9321 7550
F: +61 9321 7950
Visit Jindalee’s interactive
Investor Hub
https://investorhub.jindaleelithium.com/welcome
•
a non-renounceable rights issue to existing shareholders on a 1 for 6 basis at $0.30 per Share with
Attaching Options pursuant to a prospectus (Prospectus), to raise up to approximately $3.1 million
(Entitlement Issue); and
a funding facility including:
o $3.0 million investment for Convertible Notes, with $1.5m advanced on closing with a further
$1.5 million investment subject to shareholder approval
o Additional potential funding of up to $9 million for Convertible Notes
•
Further details in relation to the Placement, Entitlement Issue and Convertible Notes are available in
Schedules 2 and 3.
Support from US Institutional Investors, Board and management
US-based fund manager C/M Capital Partners LP, as manager of Mercer Street Global Opportunity Fund II,
LP and other funds (together, Mercer Street) have agreed to provide the Company with a $0.5 million equity
investment via the Placement.
The Company has also entered into a funding facility with Mercer Street of up to $12 million. Mercer Street
will fund an initial Convertible Note tranche of $3.0 million ($1.5 million of which is subject to shareholder
approval). In addition, Mercer Street may fund optional further tranches of up to $9.0 million by mutual
agreement and subject to shareholder approval or the Company having available placement capacity,
demonstrating the value Mercer Street sees in the long-term prospects of Jindalee and its flagship McDermitt
Lithium Project.
Furthermore, Jindalee has secured formal commitments from directors and management, including from Mr
Lindsay Dudfield (Executive Director and largest shareholder), totalling minimum subscriptions of
approximately $0.6 million in the Placement and Entitlement Issue. Director participation in the Placement
will be subject to shareholder approval.
Use of Proceeds
Funds raised pursuant to the Capital Raise, will be applied as follows:
•
•
•
Completion of the McDermitt Pre-Feasibility Study (PFS) with the incorporation of new value
optimisation opportunities, which are expected to improve capital intensity, operating costs and
production outcomes vs the initial scope of PFS (see Schedule 1 for further details);
Continuing US activities including baseline studies, permitting and stakeholder engagement; and
Corporate costs, general working capital and costs associated with the Capital Raise.
Upcoming Value Catalysts
Jindalee has continued to progress McDermitt throughout 2024, with the Capital Raise to allow the Company
to execute on several potential value catalysts in the second half of CY2024. These include:
•
•
•
•
•
•
•
Tribal Agreements (Q3)
US Government technical cooperation agreement (Q3)
Production of battery grade lithium carbonate from test work (Q3)
Update on POSCO test work currently underway in Korea (Q3)
Completion of optimised McDermitt PFS (Q4)
Potential award decision for non-dilutive US Government grant funding (Q3/Q4)
Commence strategic partnership/investment process (Q4)
Jindalee’s CEO Ian Rodger commented:
“We are very pleased to have secured the support of Mercer Street as a long-term funding partner, alongside the
continued backing of our existing shareholders. We firmly believe that the funding initiatives announced today
will support Jindalee’s work programs for the foreseeable future. This funding will enable us to deliver several
Funding Secured to Advance McDermitt Lithium Project –June 2024
key value catalysts in the second half of 2024, including the optimised McDermitt PFS and a potential award
decision for US Government grant funding.
Additionally, we are excited by the value optimisation opportunities at McDermitt, which are underpinned by
our recent metallurgical test-work which yielded better than expected results. Our goal is to reduce capital
intensity and operating costs, thereby improving early returns while still delivering a multi-decade production
outlook for battery-grade carbonate, from what we believe is an emerging top-tier, generational asset. We are
committed to incorporating these opportunities into the PFS and look forward to sharing the outcomes later
this year.”
Mercer Street’s Managing Partner Jonathan Juchno added:
“Mercer Street is pleased to support Jindalee Lithium. We see a significant value disconnect between Jindalee's
current market valuation and the strategic potential of the McDermitt Lithium Project. With strong long-term
prospects for the lithium market as the US builds out its battery value chain, we are confident in the Jindalee
team's ability to advance the Project through key milestones expected in the coming months."
Schedule 1 – Value-Optimisation opportunities to lower capex, opex and improve production
outcomes
Recent work undertaken as part of the ongoing McDermitt PFS has highlighted opportunities to add
significant value to the Project. Following successful beneficiation and acid leaching test work completed in
January 20242, initial pit shell optimisation and mine planning has identified excellent potential to maximise
returns by increasing the Run-of-Mine feed grade for a significant period from the start of operations and
stockpiling lower grade material for potential treatment in later years.
The studies have also indicated potential to optimise the flowsheet to further increase the head grade of the
acid leach feed (via beneficiation) and reduce acid consumption. Phased development of the Project is also
expected to deliver appreciable value. The Company is currently investigating these and other opportunities
which were not included in the initial PFS scope and which have the potential to significantly enhance Project
returns. Incorporation of this work is expected to add several months to the PFS timeline, with completion
now expected in the fourth quarter of 2024.
Schedule 2 – Key Terms of Placement and Entitlement Issue
The Company will issue circa 2.0 million Shares via a Placement at an issue price of $0.30 per Share to raise
approximately $0.6 million before costs.
Every two (2) Placement Shares will be accompanied by two (2) free attaching options (one of each class)
described below (fractional entitlements rounded up), to be issued subject to shareholder approval to be
requested at a general meeting to be held as soon as practicable (Attaching Options) (General Meeting):
•
•
One (1) option with an exercise price of $0.40 and expiry date of 30 June 2025 (Short Term Options);
and
One (1) option with an exercise price of $0.60 and expiry date of 30 June 2027 (Long Term Options).
The Attaching Options are intended to be admitted to quotation on ASX. The quotation of the Attaching
Options will be subject to the Company offering the Attaching Options under a prospectus prepared in
accordance with Chapter 6D of the Corporations Act 2001 (Cth) and lodged with ASIC and satisfying the
quotation conditions set out in the ASX Listing Rules. Investors are advised that while it is the Company's
current intention to seek quotation of the Attaching Options, the Company provides no certainty that
quotation of the Attaching Options will be granted.
In addition, the Company will undertake a pro-rata non-renounceable Entitlement Issue to eligible
shareholders to raise up to $3.1 million before costs. The Entitlement Issue will be offered to shareholders
on the basis of one (1) new Share for every six (6) Shares held on the record date of 15 July 2024. The
Funding Secured to Advance McDermitt Lithium Project –June 2024
Entitlement Issue Shares will be offered at the same price and basis as the Placement Shares. Attaching
Options will be offered to shareholders on the same ratio and with the same terms as the Short Term Options
and Long Term Options issued to Placement participants. Entitlement Issue Attaching Options will not be
subject to shareholder approval.
The Entitlement Issue is being made available to all shareholders with registered addresses in Australia and
New Zealand as at the record date.
Eligible shareholders will receive a copy of the Prospectus including a personalised entitlement and
acceptance form, which will provide further details of how to participate in the Entitlement Issue.
Placement participants will be eligible for Entitlement Issue participation.
In addition to taking up their entitlements in full, eligible shareholders will be able to apply for Shares in
excess of their entitlements (Top Up Securities). Top Up Securities will only be available when there is a
shortfall between applications received from eligible shareholders and the number of new Shares offered in
the Entitlement Issue and will be subject to the allocation policy described in the Prospectus.
Indicative Timetable*
An indicate timetable for the Placement and Entitlement Issue is set out below:
Event
Placement settlement
Lodgement of Prospectus with ASIC & ASX
Placement Shares issued
“Ex” Date
Record Date
Date on which offer documents will be made available to eligible shareholders
entitled to participate in the Entitlement Offer and Entitlement Issue opens
Last day to extend the Entitlement Issue closing date
Entitlement closes at 5.00pm AWST (Closing Date)
Announcement of results of Entitlement Offer and issue of Shares and Attaching
Options under Entitlement Issue
Date (2024)
Tuesday, 9 July
Wednesday, 10 July
Wednesday, 10 July
Friday, 12 July
Monday, 15 July
Thursday, 18 July
Wednesday, 24 July
Monday, 29 July
Monday, 5 August
* The dates and times noted above are indicative only and subject to change. Any material changes will be
notified by the Company to ASX. The Company reserves the right to amend any or all of these dates and times,
including the Closing Date, without prior notice subject to the Corporations Act 2001 (Cth), the ASX Listing
Rules and other applicable laws.
Schedule 3 – Key Terms of Convertible Note Agreements
The Company has entered into Convertible Securities Agreements with Mercer Street. The material terms of
the Convertible Securities Agreements are summarised as follows:
Investment Amount Mercer Street will invest up to a maximum of $12,000,000 in three or more
tranches as outlined below, subject to the satisfaction of customary conditions
precedent (including confirmation by the Company that it has performed or
complied in all material respects with all obligations required to be performed or
complied with under the Convertible Securities Agreements), via the issue of
Convertible Notes.
Funding Secured to Advance McDermitt Lithium Project –June 2024
Investment Amount
First Investment Amount:
$1,500,000
Second Investment Amount:
Subsequent Investment Amount:
Total
Face Value
$1,500,000 (subject to
shareholder approval)
Up to $9,000,000 subject to the
agreement of Mercer Street
and the Company
Up to $12,000,000
Each Convertible Note will have a Face Value of $1.00.
The aggregate Face Value of the Convertible Notes will be 110% of the relevant
Investment Amount.
The aggregate Face Value of the Convertible Notes will therefore be as follows:
Face Value
First Convertible Notes:
Second Convertible Notes:
Subsequent Convertible Notes:
Total
Conversion Price
$1,650,000
$1,650,000
If the maximum Subsequent
Investment Amount is
invested, $9,900,000.
$13,200,000
In respect of the First Convertible Notes and Second Convertible Notes, the
higher of $0.20 and either:
•
•
if conversion occurs on or before the date that is 3 months following
completion of the issue of the First Convertible Notes: $0.345;
if conversion occurs after 3 months following completion of the First
Convertible Notes, the lesser of:
o
o
$0.345; and
90% of the average of the two lowest daily VWAPs during the 20
trading days immediately prior to the relevant conversion notice
(Variable Conversion Price)
In respect of the Subsequent Convertible Notes, the higher of:
•
•
the Variable Conversion Price; and
a price equal to 65% of the average of the VWAPs for the preceding 10
trading days immediately prior to the first closing date of any Subsequent
Convertible Notes.
The Conversion Price is subject to adjustment in the event of certain customary
events (such as a consolidation or subdivision of the Company’s issued capital).
Funding Secured to Advance McDermitt Lithium Project –June 2024
Commencement
Shares
The Company must issue the following shares as partial consideration for the
provision of the investment:
Commencement Shares
On completion of the issue of the First
Convertible Notes (First Commencement
Shares)
576,738
On completion of the issue of the first tranche
of Subsequent Convertible Notes (if any)
(Subsequent Commencement Shares)
576,738
Total
Options
1,153,476
The Company must issue the following unquoted options as partial consideration
for the provision of the investment. The options will be exercisable at $0.37 each
and expire 24 months after the date of issue.
Options
Within 5 business days of the receipt of
shareholder approval, in consideration for the
issue of the First Convertible Notes (First
Options)
2,027,027
On completion of the issue of the Second
Convertible Notes (Second Options)
2,027,026
On completion of the issue of the Subsequent Such number of Options as is
Convertible Notes (if any) (Subsequent equal to 50% of the applicable
Subsequent
Investment
Options)
Amount, divided by $0.37,
Shareholder
approval
Conditions
If the maximum Subsequent
Investment
Amount
is
invested, 12,162,162 Options.
The Company has agreed to issue the First Convertible Notes and First
Commencement Shares utilising its placement capacity under Listing Rule 7.1.
The agreement to issue the First Options, Second Convertible Notes, Second
Options, Subsequent Convertible Notes, Subsequent Commencement Shares and
Subsequent Options is subject to and conditional on the receipt of shareholder
approval pursuant to Listing Rule 7.1.
The conditions precedent include, but are not limited to:
•
•
•
in respect of the Second Investment Amount, the Company obtaining
Shareholder approval to issue the relevant securities;
in respect of the First Investment Amount, Second Investment Amount, and
each Subsequent Investment Amount, the Company issuing a cleansing
statement or lodging a prospectus (if necessary), such that following
conversion of the Convertible Notes there are no restrictions for the on-sale
of Shares;
in respect of each closing date for the First Investment Amount, Second
Investment Amount, and each Subsequent Investment Amount, shares in the
Funding Secured to Advance McDermitt Lithium Project –June 2024
•
•
•
Use of proceeds
Maturity date
Repayment
The Company will use all proceeds under the Convertible Securities Agreement
towards the McDermitt Prefeasibility Study, US operations (including
metallurgical test work exploration, permitting and community engagement) and
general working capital.
The maturity date for each Convertible Note is 24 months from its issue date. The
Investor may elect to convert the Convertible Notes at any time from the date of
issue until the maturity date
Any Convertible Notes which have not been converted (or the subject of a
conversion notice) must be repaid on the earlier to occur of:
•
•
•
Repurchase right
Other terms
Company having remained continuously quoted on ASX without suspension
for more than five trading days in the 12-month period prior to the relevant
closing date;
in respect of each Subsequent Investment Amount, Mercer Street and the
Company agreeing to the Subsequent Investment;
customary conditions such as representations and warranties being true and
correct; and
authorisations and consents being obtained, delivery of documents, and no
default by the Company.
20 business days of the maturity date;
Within 10 business days of the receipt of written notice following an event of
default; or
Within 20 business days of the receipt of written notice if a change of control
event, delisting event, or qualifying capital raising event (where $10m or
more is raised) occurs.
Provided that there is no existing event of default, the Company is in compliance
with the Convertible Securities Agreements and there is no existing conversion
notice, the Company may elect to repurchase all of the remaining Convertible
Notes. The repurchase price will be a 5% premium to the Face Value of the
remaining Convertible Notes. Upon receipt of notice from the Company that it
wishes to repurchase the Convertible Notes, the Investor may elect to convert all
or some of the Convertible Notes instead of having them repurchased by the
Company.
Customary investor protections have been agreed, such as negative covenants,
events of default, and representations and warranties.
Authorised for release by the Jindalee Board of Directors.
For further information please contact:
LINDSAY DUDFIELD
Executive Director
+ 61 8 9321 7550
T:
E:
enquiry@jindalee.net
References
1.
2.
IAN RODGER
Chief Executive Officer
T:
+ 61 8 9321 7550
E:
enquiry@jindalee.net
Jindalee Lithium ASX announcement 27/02/2023: “Resource at McDermitt increases to 21.5 Mt LCE”
Jindalee Lithium ASX announcement 18/01/2024: “More Exceptional Metallurgical Results from McDermitt”
Funding Secured to Advance McDermitt Lithium Project –June 2024
About Jindalee
Jindalee Lithium Limited (ASX: JLL) is a pure-play US lithium company focussed on the development of the giant McDermitt
Lithium Project (21.5 Mt LCE1), currently the largest lithium deposit in North America. Jindalee also provides shareholders
with indirect exposure to lithium, gold, base and strategic metals, iron ore and magnesite in Australia through our holding in
Dynamic Metals (ASX: DYM).
Competent Persons Statement
The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information
compiled by Mr Lindsay Dudfield. Mr Dudfield is a director and shareholder of, and consultant to, the Company and a Member
of the Australasian Institute of Mining and Metallurgy and the Australian Institute of Geoscientists. Mr Dudfield has sufficient
experience relevant to the styles of mineralisation and types of deposits under consideration, and to the activity being
undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Minerals Resources and Ore Reserves.’ Mr Dudfield consents to the inclusion in this report of the matters
based on this information in the form and context in which it appears.
The Company confirms that it is not aware of any further new information or data that materially affects the information
included in the original market announcements by Jindalee Lithium Limited referenced in this report and in the case of
estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the
relevant market announcements continue to apply and have not materially changed. To the extent disclosed above, the
Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially
modified from the original market announcements.
Cut-off
Grade
Indicated Resource
Inferred Resource
Indicated and Inferred Resource
(ppm Li)
Tonnage
(Mt)
Li Grade
(ppm)
LCE (Mt)
Tonnage
(Mt)
Li Grade
(ppm)
LCE
(Mt)
Tonnage
(Mt)
Li Grade
(ppm)
LCE
(Mt)
1,000
1,470
1,420
11.1
1,540
1,270
10.4
3,000
1340
21.5
Table 1 – Summary of 2023 McDermitt Mineral Resource Estimate at the reporting cut-off of 1,000ppm. Note: totals may vary
due to rounding. (Lithium carbonate equivalent (LCE) is calculated by taking the lithium value and multiplying by 5.323 to determine
the molar equivalent in standard industry fashion).
Forward-Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include but are not limited to
statements concerning Jindalee Lithium Limited’s (Jindalee’s) current expectations, estimates and projections about the
industry in which Jindalee operates, and beliefs and assumptions regarding Jindalee’s future performance. When used in this
document, the words such as “anticipate”, “could”, “plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”, “should”,
and similar expressions are forward-looking statements. Although Jindalee believes that its expectations reflected in these
forward-looking statements are reasonable, such statements are subject to known and unknown risks, uncertainties and other
factors, some of which are beyond the control of Jindalee and no assurance can be given that actual results will be consistent
with these forward-looking statements.
Funding Secured to Advance McDermitt Lithium Project –June 2024
Share your feedback
Discover