Quarterly Activities Report - June 2023
Released
Released
Announcement PDF
31 JULY 2023
ASX: JRL
OTCQX: JNDAF
QUARTERLY ACTIVITIES REPORT
•
Jindalee commences a Pre-Feasibility Study (PFS) on the globally significant
McDermitt Lithium Project
•
Leading global EPCM company Fluor Corporation appointed as lead engineer for
PFS
•
Selection of samples for metallurgical testwork to support PFS completed
•
Positive industry developments and government support continue to bolster
the outlook for the lithium sector
•
Jindalee held $8.3M in cash and securities at 30 June 2023
US LITHIUM
McDermitt Lithium Project (Jindalee 100%)
In late February 2023, Jindalee Resources Limited (Jindalee or the Company) announced an updated
Mineral Resource Estimate (MRE) at the McDermitt Lithium Project (US) following a 21 hole drilling
program completed in October 2022 (Figure 1)1.
The 2023 MRE for McDermitt contains a combined Indicated and Inferred Mineral Resource Inventory
of 3.0 Billion tonnes at 1,340ppm Li for a total of 21.5 Million tonnes LCE at 1,000 ppm cut-off grade.
At 21.5 Mt LCE, McDermitt is the largest lithium deposit in the US by contained lithium in Mineral
Resource, and a globally significant resource (Table 1).
Cut-off
Grade
(ppm Li)
Indicated Resource
Tonnage
(Mt)
Li Grade
(ppm)
Indicated and Inferred
Resource
Inferred Resource
LCE
(Mt)
Tonnage
(Mt)
Li Grade
(ppm)
LCE
(Mt)
Tonnage
(Mt)
Li Grade
(ppm)
LCE
(Mt)
1000
1,470
1,420
11.1
1,540
1,270
10.4
3,000
1340
21.5
1
Table 1 – Summary of 2023 McDermitt Mineral Resource Estimate at the reporting cut-off of 1000ppm.
Note: totals may vary due to rounding
Figure 1 - Plan view of the McDermitt Lithium Project with drill collars and 2023 Mineral Resource1 (at 1523mRL).
Metallurgical Testwork - Jindalee
There are two potential pathways for the extraction of lithium from sedimentary deposits such as
McDermitt: sulphuric acid leaching of both whole or beneficiated ore, and alkali salt (sulphation)
roasting. Initial work completed by Jindalee focussed on beneficiation and sulphuric acid leaching,
similar to the flowsheet proposed by the nearby Thacker Pass Project2, with alkali salt roasting also
investigated as a potential alternative processing route through 2022.
Encouraging results were returned from both acid leaching and alkali salt roasting and in late 2022
Jindalee engaged global engineering, procurement, construction and maintenance (EPCM) company
Fluor Corporation (NYSE: FLR) (Fluor) to undertake a review of the metallurgical testwork undertaken
by Jindalee at McDermitt.
2
In March 2023 Jindalee announced that Fluor had determined that acid leaching with ore beneficiation
(to upgrade the leach head grade) delivered the lowest operating costs and best financial outcome
among the alternatives considered3. Fluor noted that the very large Mineral Resource at McDermitt
(21.5 Mt LCE, Table 1)1 allows flexibility in development, providing the opportunity to optimise mining
and feed higher grade ore early in the mine life. Fluor also recommended that a comprehensive
metallurgical testwork program be undertaken to provide information upon which the preferred
flowsheet for the processing of McDermitt ore can be defined.
In June 2023 leading mine engineering group Cube Consulting generated conceptual pit shells using
the McDermitt MRE geological model to assist with selection of samples for the metallurgical testwork
program defined by Fluor. Sampling of drill holes from the Indicated portion within Pit Shell 5 (nominal
20 years) has been completed, with approximately 500kg of drill core despatched to the metallurgical
facility late July 2023.
McDermitt Lithium Project Pre-Feasibility Study (PFS)
On 7 June 2023 Jindalee announced that it had commenced a PFS on the McDermitt Lithium Project
and had appointed Fluor as lead engineer4. Fluor has extensive experience with US sediment hosted
lithium deposits and has assembled a team of highly credentialled metallurgists and engineers to work
on the study. The Company is also pleased to advise that Michael Elias has been engaged as Jindalee’s
Study Manager for the PFS. Michael is an engineer with extensive experience managing studies for
major projects, both in Australia and overseas.
Results from the metallurgical testwork referred to above will be integrated with recent detailed
geological modelling, XRD sampling (400 samples) and lithological domaining of the deposit to provide
an updated MRE for McDermitt, targeted for late 2023, ahead of more detailed studies informing the
PFS.
The PFS represents the next logical step towards development of McDermitt and is expected to
facilitate meaningful discussions with potential financiers (both public and private sector), off-takers
and strategic partners.
Permitting
Jindalee continues to de-risk the McDermitt Lithium Project on multiple fronts. In addition to ongoing
geological, metallurgical and engineering studies the Company is building on environmental baseline
and cultural surveys completed during 2022.
On 16 May 2023 Jindalee announced that it has been notified by the US Bureau of Land Management
(BLM) that the Exploration Plan of Operations (EPO) for McDermitt, originally submitted August 2022
(with additional information provided early 2023), had been deemed complete5. Once approved, the
EPO will allow Jindalee to significantly increase on-site activity, including infill drilling and bulk
sampling.
Jindalee also announced that both the BLM and the Oregon Department of Geology and Mineral
Industries (DOGAMI) have agreed to accept surety bonds to replace cash reclamation bonds currently
lodged against the McDermitt Project5. Importantly, the use of surety bonds is expected to reduce the
cash outlay for additional bonding which will be required once the EPO receives final approval.
3
The BLM has advised that the public comment period on the EPO will commence 31 July 2023, either
separate from or as a part of the environmental review process required by the National
Environmental Policy Act (NEPA), with the final decision of the NEPA assessment to be incorporated
into the EPO. This process is expected to take up to 12 months.
Industry Developments
Recent industry developments in the US lithium sector include the commencement of construction at
Lithium Americas’ (TSX:LAC) nearby Thacker Pass Project6, which is supported by a US$650M equity
investment and exclusive offtake by US car manufacturer General Motors Company (GM)7. Jindalee
also notes the US Department of Energy (DOE) announcement of a conditional loan of up to US$700M
to support development of Ioneer Limited’s (ASX: INR) Rhyolite Ridge Lithium‐Boron Project in
Esmerelda County, Nevada8.
These developments have emboldened Jindalee’s confidence that the development of McDermitt will
play a key role in feeding the United States’ rapidly growing demand for domestically produced lithium.
The Rhyolite Ridge project (1.3Mt LCE9) and the Thacker Pass project (19.0Mt LCE2), located 35km
south of McDermitt, are the two most advanced sediment hosted lithium deposits in the US and are
currently in the last stages of permitting.
These developments underline the US Government’s commitment to securing domestic sources of
critical materials for US battery supply chains and have positive implications for the potential funding
and development of the McDermitt deposit (21.5Mt LCE)1.
This demand has been highlighted by the passage of the US Inflation Reduction Act 2022 (IRA), which
has allocated US$369B in funding to reduce carbon emissions by 40% by 2030. Under the IRA at least
40% of an EV’s battery materials must be sourced from the US (or a Free Trade Agreement partner) to
qualify for an EV tax credit, rising to 80% by 2027. Furthermore, miners producing critical materials
will be eligible for tax credits equivalent to 10% of production costs and US$40B has been made
available under the DOE’s Innovative Technology Loan Guarantee to support projects that bolster a
domestic supply of critical minerals.
Jindalee also notes the recent conclusion of the Australia-United States Climate, Critical Minerals and
Clean Energy Transformation Compact10, which aims to establish climate and clean energy as a central
pillar of the Australia-United States Alliance. Among the objectives of the Compact is the promotion
of a responsible, sustainable and stable supply of critical minerals essential to the global energy
transformation. While implementation of the Compact is at an early stage, its signing is considered by
the Board to be positive for companies whose operations and interests span the two countries, such
as Jindalee.
INVESTMENTS
Dynamic Metals
(Jindalee 25.5% of issued capital)
Dynamic Metals (ASX: DYM) was spun out of Jindalee mid-January 2023 to allow Jindalee to focus on
its US lithium assets. Jindalee holds 12.5M Dynamic shares and is Dynamic’s largest shareholder,
providing Jindalee shareholders with an indirect interest in Dynamic’s Australian projects.
4
Dynamic’s portfolio includes an extensive landholding in the Widgiemooltha district and the Lake Percy
Project, both of which are highly prospective for lithium, nickel and gold, as well as the Deep Well NiCu-PGE Project in which Dynamic holds an 80% interest. For further information on these and other
projects owned by Dynamic please refer to Dynamic’s website (www.dynamicmetals.com.au).
Energy Metals Limited
(Jindalee 5.7% of issued capital)
Jindalee holds approximately 11.9M Energy Metals (ASX: EME) shares, giving shareholders continued
exposure to the development of the Bigrlyi uranium-vanadium deposit and the potential of Energy
Metals’ other uranium projects (refer www.energymetals.net).
CORPORATE
Jindalee currently has 57.4M shares on issue with cash and listed securities at 30 June 2023 of
approximately $8.3M11.
FINANCIAL COMMENTARY
The Quarterly Cashflow Report (Appendix 5B) for the period ending 30 June 2023 provides an overview
of the Company’s financial activities.
Exploration expenditure for the reporting period was $203k and was dominated by expenditure on
McDermitt. Net corporate expenditure inflow was $3k, after reimbursement of Dynamic exploration
and spin-out costs of approximately $127k. The total amount paid to directors of the entity and their
associates in the period (item 6.1 of the Appendix 5B) was $121k and includes directors’ fees,
consulting fees and superannuation.
Authorised for release by the Jindalee Board of Directors.
For further information please contact:
LINDSAY DUDFIELD
Executive Director & CEO
T:
+ 61 8 9321 7550
E:
enquiry@jindalee.net
5
ADDITIONAL INFORMATION
Additional details including JORC 2012 reporting tables, where applicable, can be found in the ASX
announcements referenced in this report and announcements lodged with the ASX during the quarter:
References
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
Jindalee Resources ASX announcement 27/02/2023: “Resource at McDermitt increases to 21.5 Mt LCE”
Refer: https://www.lithiumamericas.com/staging/lithiumamericas.com/_resources/thacker-pass/Thacker-PassFeasibility-Study-43_101_1-31-23
Jindalee Resources ASX announcement 24/03/2023: “Preferred Lithium Extraction Process for McDermitt Project”
Jindalee Resources ASX announcement 07/06/2023: “Fluor Appointed Lead Engineer for McDermitt Project”
Jindalee Resources ASX Announcement 16/05/2023: “McDermitt Progress Update”
Lithium Americas TSX announcement 02/03/2023 “Lithium Americas Commences Construction at Thacker Pass”
Lithium Americas TSX announcement 02/3/2023 “Lithium Americas to Develop US Sourced Lithium Production
through $650 Million Equity Investment and Supply Agreement
Ioneer Limited ASX announcement 16/1/2023 “US Department of Energy Offers Conditional Commitment for a Loan
of Up to US$700 Million for the Rhyolite Ridge Project”
Refer: https://www.ioneer.com/projects/about-rhyolite-ridge/reserves-resources/
Refer: https://www.pm.gov.au/media/australia-united-states-climate-critical-minerals-and-clean-energytransformation-compact
Jindalee Resources ASX announcement 31/07/2023: “Quarterly Cashflow Report”
Competent Persons Statement
The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on
information compiled by Mr. Lindsay Dudfield and Mr. Brett Marsh. Mr. Dudfield is a director, shareholder and
consultant to the Company and a Member of the Australasian Institute of Mining and Metallurgy and the
Australian Institute of Geoscientists. Mr. Marsh is an employee of the Company and an American Institute of
Professional Geologists (AIPG) Certified Professional Geologist and a Registered Member of the Society for
Mining, Metallurgy & Exploration (SME). Both Mr. Dudfield and Mr. Marsh have sufficient experience relevant
to the styles of mineralisation and types of deposits under consideration, and to the activity being undertaken,
to qualify as Competent Persons as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Minerals Resources and Ore Reserves’ (JORC Code). Mr. Dudfield and Mr. Marsh consent to
the inclusion in this report of the matters based on this information in the form and context in which it appears.
The information in this report that relates to the Exploration Target and the Mineral Resource Estimate for the
McDermitt deposit is based on information compiled by Mr. Arnold van der Heyden, who is a Member and
Chartered Professional (Geology) of the Australasian Institute of Mining and Metallurgy and a Director of H&S
Consultants Pty Ltd. Mr. van der Heyden has sufficient experience relevant to the style of mineralisation and
type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as
defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves’ (JORC Code).
The Company confirms that it is not aware of any further new information or data that materially affects the
information included in the original market announcement by JRL entitled “Resource at McDermitt increases to
21.5 Mt LCE” released on 27 February 2023 and in the case of estimates of Mineral Resources, that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement
continue to apply and have not materially changed. To the extent disclosed above, the Company confirms that
the form and context in which the Competent Person’s findings are presented have not been materially modified
from the original market announcement.
Forward-Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include but are
not limited to statements concerning Jindalee’s current expectations, estimates and projections about the
industry in which Jindalee operates, and beliefs and assumptions regarding Jindalee’s future performance.
When used in this document, the words such as “anticipate”, “could”, “plan”, “estimate”, “expects”, “seeks”,
“intends”, “may”, “potential”, “should”, and similar expressions are forward-looking statements. Although
Jindalee believes that its expectations reflected in these forward-looking statements are reasonable, such
statements are subject to known and unknown risks, uncertainties and other factors, some of which are beyond
6
the control of Jindalee and no assurance can be given that actual results will be consistent with these forwardlooking statements.
Such factors may include, among others, risks related to regulatory approvals of or in connection with the
proposed transaction, actual results of current or planned exploration activities, change in market conditions
which affect the completion of the transaction, obtaining appropriate approvals to undertake exploration
activities in the portfolio of projects, changes in exploration programs and budgets based upon the results of
exploration, future prices of minerals resources; grade or recovery rates; accidents, labour disputes and other
risks of the mining industry; delays in obtaining government approvals or financing or in the completion of
development or construction activities; movements in the share price of investments and the timing and
proceeds realised on future disposals of investments, the impact of the COVID 19 pandemic as well as those
factors detailed from time to time in the Company’s interim and annual financial statements and reports, all
over which are available for review on ASX at asx.com.au and OTC Markets at otcmarkets.com.
Although the Company has attempted to identify important factors that could cause actual actions, events or
results to differ materially from those described in forward-looking statements will prove to be accurate, as
actual results and future events could differ materially from those anticipated in such statements. Accordingly,
readers should not place undue reliance on forward-looking statements.
7
Tenement Information in accordance with Listing Rule 5.3.3
Project
McDermitt*
Clayton North
Sherlock
NOTE:
*
*
As at 30 June 2023
Granted
Interest at
beginning of Qtr
100%
Interest at
end of Qtr
100%
Nevada, USA
Nevada, USA
Granted
100%
100%
Western Australia
Granted
20%
20%
Tenement ID
Location
Status
HTM 16-20, 24-35, 39-55, 59-77, 81101, 105-125, 130-149, 152-172,
176-195, 199-213, 217-225, 231-235,
238-242, 258-260, 340-342, 348,
349, 355, 356, 362, 363, 369, 376380, 387-391, 398, 399, 420-445,
448-456, 460-469, 480-493, 496,
497, 500-517, 532-585, 685-687.
HTX 1-113, 116-442.
Oregon, USA
HTM 586-682.
HTC 1-6, 12-18, 25-28.
E47/4345
Jindalee’s interests in all Australian tenements except Sherlock were transferred to Dynamic Metals Limited
(ASX: DYM) effective 11 January 2023. Refer www.dynamicmetals.com.au for further details.
Tenements held by Jindalee’s wholly owned US subsidiary, HiTech Minerals Inc.
8
Share your feedback