Exploration Target Highlights Further Upside at McDermitt
Released
Released
Announcement PDF
JRL
JNDAF
21 November 2023
EXPLORATION TARGET HIGHLIGHTS
FURTHER UPSIDE AT McDERMITT
• Exploration Target confirms excellent potential for further resource growth
• The Exploration Target is in addition to the Mineral Resource Estimate announced
February 20231
• Anomalous lithium assays from surface sampling highlight further potential at McDermitt
In February 2023, Jindalee Resources Limited (to be renamed “Jindalee Lithium Limited”) (Jindalee or the
Company) announced an updated Mineral Resource Estimate (MRE) at Jindalee’s 100% owned McDermitt Lithium
Project (US) (Figure 1)1.
The 2023 MRE for McDermitt contains a combined Indicated and Inferred Mineral Resource Inventory of 3.0 Billion
tonnes at 1,340ppm Li for a total of 21.5 Million tonnes Lithium Carbonate Equivalent (LCE) at 1,000 ppm cut-off
grade. At 21.5 Mt LCE, McDermitt is the largest lithium deposit in the US by contained lithium in Mineral Resource,
and a globally significant resource (Table 3), with the deposit remaining open to the west and south (Figure 1).
Jindalee is also pleased to announce an independently estimated Exploration Target Range (ETR) at McDermitt.
The ETR of 300 – 700 Million tonnes at 1,100 – 1,400ppm Li (at 1,000ppm Li cut-off) is extrapolated from drilling
completed at the Project (Table 1, Figure 1).
Cut-off Grade
(ppm Li)
Lower Limit
(Mt)
Upper Limit
(Mt)
Grade Range
(ppm Li)
Mid-point Contained LCE
(Mt)
1,000
300
700
1100 - 1400
3.3
Table 1 – Summary of Exploration Target Range at cut-off of 1000ppm. LCE calculated using the midpoint of the range.
Cautionary Statement
The Exploration Target has been prepared and reported in accordance with the 2012 edition of the JORC Code. The
potential quantity and grade of the Exploration Target is conceptual in nature. There has been insufficient
exploration to estimate a Mineral Resource for all target areas reported. It is uncertain if further exploration will
result in the estimation of a Mineral Resource.
Recent relogging of McDermitt drilling, combined with regional mapping and sampling, has recognised up to 12
distinctive and laterally continuous stratigraphic units which can be tracked across the Project area. The
Exploration Target surrounds and abuts the 2023 MRE and is extrapolated from 62 holes drilled at McDermitt from
2018 to 2022. Material for the MRE extends to a maximum distance of 1,200m from the nearest hole, with the
ETR extending to a maximum of 1,500m from the nearest hole (Figure 1).
Jindalee Resources Limited
ABN 52 064 121 133
Level 2, 9 Havelock Street, West Perth, WA, 6005
PO Box 1033, West Perth, WA 6872
www.jindalee.net
E: enquiry@jindalee.net
P: +61 9321 7550
F: +61 9321 7950
In August 2022 Jindalee submitted an Exploration Plan of Operations (EPO) to the Bureau of Land Management
(BLM), with the EPO deemed complete by the BLM in May 20232. Once approved, the EPO will allow Jindalee to
significantly increase on-site activity, including up to 160 holes designed to both infill the 2023 MRE and test areas
currently covered by the Exploration Target. Jindalee expects the EPO to be approved 2H 2024, with drilling to
commence soon after.
Furthermore, sampling of weathered sediments exposed in drainages west and south of the Mineral Resource and
Exploration Target areas has returned strongly anomalous lithium values, indicating excellent potential to locate
additional lithium mineralisation in these areas (Figure 1, Table 2).
Figure 1 – Plan view of the McDermitt Lithium Project with 2023 Mineral Resource1 (at 1523mRL), completed drilling,
Exploration Target and Surface Sampling locations outside the Mineral Resource and Exploration Target areas.
Methodology
The methodology used for the ETR was identical to that used for the 2023 MRE1. A total of 62 drillholes and 97
density measurements were used for the estimation of both the 2023 MRE and the ETR, with lithium estimated
by Ordinary Kriging. The block size for estimation was 200mE by 200mN by 5mRL, with sub-celling permitted to
40mE by 40mN by 1mRL.
ASX Announcement – McDermitt Exploration Target
The ETR estimates were guided by stratigraphy, which is the major control on the continuity of both lithium grade
and geology, with material for the ETR limited to within 1,500m of the nearest hole. The entire mineralisation
inventory (2023 MRE and ETR) occurs within 215m of surface.
A summary of all drill data included in both the 2023 MRE and the ETR is included in Annexure A. All other details
pertaining to the reporting of exploration results and the 2023 MRE and the ETR are detailed in Annexure B.
Drilling Update
In October 2023, Jindalee announced that a diamond drill rig had been contracted to complete five geotechnical
holes at McDermitt, with drilling scheduled to commence 1 November 2023, subject to final approvals from the
BLM and Oregon Department of Geology and Mineral Industries (DOGAMI)3.
The Company advises that the proposed drilling program has been approved by the BLM, subject to posting
additional bonding for environmental reclamation; however, approval from DOGAMI has yet to be received.
Authorised for release by the Board of Jindalee Resources Limited.
For further information please contact:
LINDSAY DUDFIELD
Executive Director
T:
+ 61 8 9321 7550
E:
enquiry@jindalee.net
Sample ID
N (NAD83)
E (NAD83)
Li (ppm)
Sample ID
N (NAD83)
E (NAD83)
Li (ppm)
662816
406561.4
4652960.7
81.6
662829
406409.6
4651891.6
1700
662817
406282.0
4652970.0
202
662830
406557.4
4652129.0
770
662818
406273.7
4652969.2
209
662832
410149.0
4650500.2
86.4
662822
407503.0
4652029.4
870
662833
412177.1
4649973.9
114
662823
407380.4
4651925.5
1180
662834
414516.4
4649903.9
1450
662824
407121.6
4651835.6
126.5
MDS022
408343.4
4652706.2
27.7
662825
406955.7
4651722.6
232
MDS065
409469.6
4654543.7
1820
662827
406306.9
4651276.6
1180
MDS066
409471.6
4654551.7
1190
662828
4065097.4
4651559.8
43.1
Table 2 – Surface Sampling Locations and Results.
Indicated Resource
Cut-off
Grade
Inferred Resource
Indicated and Inferred Resource
(ppm Li)
Tonnage
(Mt)
Li Grade
(ppm)
LCE (Mt)
Tonnage
(Mt)
Li Grade
(ppm)
LCE
(Mt)
Tonnage
(Mt)
Li Grade
(ppm)
LCE
(Mt)
1,000
1,470
1,420
11.1
1,540
1,270
10.4
3,000
1340
21.5
Table 3 – Summary of 2023 McDermitt Mineral Resource Estimate at the reporting cut-off of 1,000ppm.
Note: totals may vary due to rounding.
Lithium carbonate equivalent (LCE) is calculated by taking the lithium value and multiplying by 5.323 to determine the molar
equivalent in standard industry fashion.
ASX Announcement – McDermitt Exploration Target
References
1.
2.
3.
Jindalee Resources ASX announcement 27/02/2023: “Resource at McDermitt increases to 21.5 Mt LCE”
Jindalee Resources ASX announcement 16/05/2023: “McDermitt Progress Update”
Jindalee Resources ASX announcement 09/10/2023: “Drilling to commence at McDermitt Lithium Project”
About Jindalee
Jindalee Resources Limited (ASX: JRL) is a pure-play US lithium company focussed on the development of the giant McDermitt
Lithium Project (21.5 Mt LCE1), currently the largest lithium deposit in North America. Jindalee also provides shareholders
with indirect exposure to lithium, gold, base and strategic metals, iron ore, uranium and magnesite in Australia through
holdings in spin-out companies Dynamic Metals (ASX: DYM) and Energy Metals (ASX: EME).
Cautionary Statement
This announcement and information, opinions or conclusions expressed in the course of this announcement contain forecasts and forwardlooking information. Such forecasts, projections and information are not a guarantee of future performance, involve unknown risks and
uncertainties. Actual results and developments will almost certainly differ materially from those expressed or implied. There are a number
of risks, both specific to Jindalee, and of a general nature which may affect the future operating and financial performance of Jindalee, and
the value of an investment in Jindalee including and not limited to title risk, renewal risk, economic conditions, stock market fluctuations,
commodity demand and price movements, timing of access to infrastructure, timing of environmental approvals, regulatory risks,
operational risks, reliance on key personnel, reserve estimations, native title risks, cultural heritage risks, foreign currency fluctuations, and
mining development, construction and commissioning risk.
Competent Persons Statement
The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information
compiled by Mr Lindsay Dudfield. Mr Dudfield is a director and shareholder of, and consultant to, the Company and a Member
of the Australasian Institute of Mining and Metallurgy and the Australian Institute of Geoscientists. Mr Dudfield has sufficient
experience relevant to the styles of mineralisation and types of deposits under consideration, and to the activity being
undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Minerals Resources and Ore Reserves.’ Mr Dudfield consents to the inclusion in this report of the matters
based on this information in the form and context in which it appears.
The information in this report that relates to the Mineral Resource Estimates and Exploration Targets for the McDermitt
deposit is based on information compiled by Mr. Arnold van der Heyden, who is a Member and Chartered Professional
(Geology) of the Australasian Institute of Mining and Metallurgy and a Director of H&S Consultants Pty Ltd. Mr. van der
Heyden has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the
activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code). Mr van der Heyden consents to the
inclusion in this report of the matters based on this information in the form and context in which it appears.
The Company confirms that it is not aware of any further new information or data that materially affects the information
included in the original market announcements by Jindalee Resources Ltd referenced in this report and in the case of
estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the
relevant market announcements continue to apply and have not materially changed. To the extent disclosed above, the
Company confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original market announcements.
Forward-Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include but are not limited to
statements concerning Jindalee Resources Limited’s (Jindalee’s) current expectations, estimates and projections about the
industry in which Jindalee operates, and beliefs and assumptions regarding Jindalee’s future performance. When used in this
document, the words such as “anticipate”, “could”, “plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”,
“should”, and similar expressions are forward-looking statements. Although Jindalee believes that its expectations reflected
in these forward-looking statements are reasonable, such statements are subject to known and unknown risks, uncertainties
and other factors, some of which are beyond the control of Jindalee and no assurance can be given that actual results will be
consistent with these forward-looking statements.
ASX Announcement – McDermitt Exploration Target
Annexure A:
Drill hole summary table with significant intersections for all drilling completed at McDermitt
Hole ID
MDD001
MDD002
MDD003
MDD004
MDD005
MDD006
MDD007
Hole Type
Easting
Northing
DDH
412207.521
4651742.751
DDH
DDH
DDH
DDH
DDH
DDH
412071.497
412466.979
413673.005
413529.796
413112.045
412967.01
4653292.338
4654722.177
4653030.996
4652421.636
4653999.409
4653151.676
RL
Dip/Azi
End of Hole
Depth
Metres From
Metres To
Width (m)
1581.912
-89/36
92.36
12
26
14
1527
48
60
12
1825
2
22
20
1420
38
54
16
1910
66
90.8
24.8
1238
1574.292
1616.964
1588.008
1534.668
1601.724
1577.34
-90/0
-89/179
-90/0
-89/290
-90/0
-90/0
90.83
91.47
82.91
93.57
165.8
122.83
Li (ppm)
4
18
14
1031
24
38
14
1202
44
74
30
1884
2.5
18
15.5
1185
28
82
54
1659
5.5
52
46.5
1027
66
80
14
1651
4.3
20
15.7
1258
28
58
30
1967
70
144
74
1481
6
26
20
1419
36
54
18
1516
72
110
38
1496
15.4
1233
MDD008
DDH
413504.005
4654469.996
1578.864
-88/183
108.5
6.6
22
36
90
54
1773
MDD009
DDH
413791.099
4654811.523
1560.576
-88/291
80.16
2.2
6
3.8
1319
12
58
46
1674
12
18
6
1567
MDD010
DDH
412341.263
4655866.089
1612.392
-89/218
91.44
Hole ID
MDD011
Hole Type
DDH
Easting
410790.443
Northing
4652578.78
RL
Dip/Azi
1625.194
-90/0
End of Hole
Depth
208.07
MDD012
DDH
412382.898
4654088.91
1559.966
-88/329
120.39
MDD013
DDH
411473.479
4653054.709
1597.152
-89/295
167.33
MDD014
MDD015
MDD016
MDD017
DDH
DDH
DDH
DDH
413300
412854
412399
412638
4655034
4655438
4655392
4655874
1595
1606
1621
1612
-90/0
-90/0
-90/0
-90/0
135.2
118.0
166.2
118.3
Metres From
Metres To
Width (m)
Li (ppm)
30
36
6
1233
48
88
40
1922
32
54
22
1498
60
78
18
1653
96
112
16
1635
120
170
50
1640
8.31
26
17.7
1498
40
76
36
2141
2
32
30
1245
42
60
18
1478
76
98
22
1404
110
150
40
1556
10.0
25.0
15.0
1889
29.5
38.5
9.0
1241
43.0
81.0
38.0
1751
24.0
45.0
21.0
1952
54.0
64.5
10.5
1281
79.5
88.5
9.0
1435
3.0
13.5
10.5
1005
18.0
52.5
34.5
1124
61.5
85.5
24.0
2210
93.0
114.0
21.0
1123
118.0
127.5
9.5
1915
136.5
144.0
7.5
1661
10.5
18.0
7.5
1276
33.0
73.5
40.5
1714
Hole ID
MDD018
MDD019
MDD020
MDD021
MDD022
MDD023
MDD024
MDD025
Hole Type
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
Easting
413190
412540
412030
413081
413753
413876
410969
411360
Northing
4654530
4653925
4654791
4654923
4654002
4653541
4654436
4654222
RL
Dip/Azi
1605
1567
1574
1598
1543
1580
1646
1634
-90/0
-90/0
-90/0
-90/0
-90/0
-90/0
-90/0
-90/0
End of Hole
Depth
133.5
123.5
146
111
123
148
203
228
Metres From
Metres To
Width (m)
Li (ppm)
81.0
103.5
22.5
1513
15.0
42.0
27.0
2097
48.0
108.0
60.0
1880
6.0
22.5
16.5
1547
30.0
103.5
73.5
1554
8.0
17.0
9.0
1432
20.8
50.0
29.2
1853
62.5
94.0
31.5
1608
10.5
29.0
18.5
1844
33.4
40.8
7.4
1285
52.0
78.3
26.3
1839
15.4
49.9
34.5
1609
55.6
84.8
29.2
1503
87.9
97.6
9.7
1243
2.1
25.9
23.8
2174
32.7
65.1
32.4
1702
83.2
101.6
18.4
1548
47.6
71.6
24.0
1232
75.1
114.9
39.8
1265
130.0
159.6
29.6
1559
163.0
173.6
10.6
1337
21.4
27.7
6.3
1261
48.1
68.5
20.4
1199
72.1
86.2
14.1
1393
90.6
188.9
28.3
1427
133.6
156.9
23.3
1726
Hole ID
MDD026
Hole Type
DDH
Easting
412110
Northing
4654039
RL
Dip/Azi
1604
-90/0
End of Hole
Depth
160
MDD027
DDH
408089
4654521
1684
-90/0
127
MDD028
DDH
410029
4653258
1637
-90/0
182
MDD029
MDRC001
MDRC002
MDRC003
MDRC004
DDH
RC
RC
RC
RC
409443
413530.404
414891
413058
411805
4654433
4652423.961
4654160
4655552
4656684
1637
1534.668
1576
1583
1647
-90/0
-90/0
-90/0
-90/0
-90/0
106
152.39
91.4
137.2
185.9
Metres From
Metres To
Width (m)
Li (ppm)
169.8
179.1
9.3
2397
182.3
203.6
21.3
1434
1.5
16.5
14.5
1328
21.5
30.5
9.0
1670
33.5
46.3
12.8
1584
49.3
69.5
20.2
1889
83.4
135.2
51.8
1787
no significant intercepts
24.5
45.5
21.0
1079
50.0
63.5
13.5
1707
69.5
86.0
16.5
1548
96.9
117.5
20.6
1566
121.3
140.1
18.8
1801
26.8
74.2
47.4
1449
96.7
105.5
8.8
1178
29
51.8
22.8
1070
67.1
79.3
12.2
1600
85.3
118.9
33.6
1378
0
9.2
9.2
1440
15.3
32
16.8
1412
36.6
44.2
7.6
1416
1.5
18.3
16.8
1731
24.4
39.7
15.3
1054
48.8
67.1
18.3
1415
96.1
103.7
7.6
1130
140.3
149.5
9.2
2243
Hole ID
MDRC005
MDRC006
MDRC007
MDRC008
MDRC009
MDRC010
MDRC011
MDRC012
Hole Type
RC
RC
RC
RC
RC
RC
RC
RC
Easting
412117
412927
413420
413918
413552
413756
413961
414254
Northing
4655128
4654456
4653407
4652733
4653960
4653605
4653342
4652960
RL
Dip/Azi
1612
1609
1585
1570
1583
1576
1579
1573
-90/0
-90/0
-90/0
-90/0
-90/0
-90/0
-90/0
-90/0
End of Hole
Depth
161.5
173.7
164.6
146.3
158.5
146.3
137.2
134.1
Metres From
Metres To
Width (m)
Li (ppm)
155.6
170.8
15.3
2459
18.3
27.5
9.2
1157
58
76.3
18.3
1992
82.4
131.2
48.8
1342
39.7
70.2
30.5
1939
74.7
94.6
19.8
1151
97.6
126.6
29
2164
1.5
9.2
7.6
1380
19.8
48.8
29
1948
62.5
79.3
16.8
1147
99.1
134.2
35.1
1309
13.7
39.7
25.9
1794
53.4
70.2
16.8
1274
96.1
115.9
19.8
1186
120.5
128.1
7.6
1379
6.1
29
22.9
2108
38.1
82.4
44.2
1405
93
103.7
10.7
1984
108.3
117.4
9.2
1233
0
19.8
19.8
2383
33.6
65.6
32
1397
71.7
114.4
42.7
1402
3.1
25.9
22.9
2283
33.6
68.6
35.1
1373
85.4
119
33.6
1425
1.5
59.5
58
1611
Hole ID
MDRC013
MDRC014
MDRC015
MDRC016
MDRC017
MDRC018
MDRC019
MDRC020
MDRC021
Hole Type
RC
RC
RC
RC
RC
RC
RC
RC
RC
Easting
413224
411864
410845
411516
411529
412033
412149
412695
413230
Northing
4652757
4653865
4654548
4652079
4655406
4654784
4655701
4655116
4653824
RL
Dip/Azi
1542
1618
1652
1618
1592
1584
1628
1615
1602
-90/0
-90/0
-90/0
-90/0
-90/0
-90/0
-90/0
-90/0
-90/0
End of Hole
Depth
121.9
182.9
182.9
182.9
115.9
32.0
166.2
147.9
166.2
Metres From
Metres To
Width (m)
Li (ppm)
88.5
115.9
27.4
1477
32
45.8
13.8
1073
70.2
102.2
32
1379
58
64.1
6.1
1572
12.2
82.4
70.2
1221
91.5
106.8
15.3
1578
131.2
155.6
24.4
1887
47.3
62.5
15.3
1233
73.2
83.9
10.7
1189
120.5
146.4
25.9
1615
27.5
45.8
18.3
1228
56.4
71.7
15.3
1554
91.5
103.7
12.2
1647
122
178.4
56.4
1151
45.8
67.1
21.4
1546
74.7
82.4
7.6
1424
102.2
114.4
12.2
1750
3.1
16.8
13.7
1168
21.4
32.0
10.7
2354
9.2
22.9
13.7
1041
44.2
58.0
13.7
1084
71.7
96.1
24.4
2173
105.2
143.4
38.1
1407
22.9
36.6
13.7
2142
45.8
58.0
12.2
1133
3.1
13.7
10.7
1425
Hole ID
MDRC022
MDRC023
Hole Type
RC
RC
Easting
414102
414217
Northing
4652620
4654704
RL
Dip/Azi
1567
1597
-90/0
-90/0
End of Hole
Depth
141.8
75
Metres From
Metres To
Width (m)
Li (ppm)
24.4
53.4
29.0
1801
58.0
68.6
10.7
1021
73.2
88.5
15.3
1316
103.7
123.5
19.8
1752
128.1
135.7
7.6
1189
0.0
21.4
21.4
1590
35.1
50.3
15.3
1156
64.1
73.2
9.2
1775
0.0
10.7
10.7
1336
22.9
56.4
33.5
1819
MDRC024
RC
414453
4654244
1589
-90/0
134
0
68.6
68.6
1669
MDRC025
RC
414616
4653943
1578
-90/0
122
0
50.3
50.3
1512
MDRC026
RC
414611
4654816
1585
-90/0
75
19.8
48.8
29.0
1568
MDRC027
RC
414941
4654055
1559
-90/0
44
9.1
22.9
13.7
1554
MDRC028
RC
413288
4651639
1552
-90/0
171
4.6
21.3
16.8
1680
94.5
106.7
12.2
1531
115.8
135.6
19.8
1451
141.7
147.8
6.1
1818
18.3
25.9
7.6
1914
50.3
65.5
15.2
1600
121.9
131.1
9.1
1310
141.7
157.0
15.2
1460
161.5
172.2
10.7
1619
176.8
182.9
6.1
1816
30.5
44.2
13.7
1694
100.6
111.3
10.7
1488
MDRC029
MDRC030
RC
RC
412586
412579
4651802
4652411
1582
1564
-90/0
-90/0
219
168
Hole ID
MDRC032
MDRC033
Hole Type
RC
RC
Easting
411108
410609
Northing
4652505
4652199
RL
Dip/Azi
1624
1614
-90/0
-90/0
End of Hole
Depth
194
177
Notes: All coordinates are NAD83 Z11
• RC intervals are reported on 1000ppm Li cut-off with maximum internal dilution of 10 feet (3.05m).
• Diamond drilling intervals are reporting on 1000ppm Li cut-off with maximum internal dilution of 4.0m.
• Intervals reported in this table meet a minimum downhole width of approximately 20 feet (6.1m).
Metres From
Metres To
Width (m)
Li (ppm)
118.9
144.8
25.9
1460
33.5
44.2
10.7
1516
54.9
71.6
16.8
1269
88.4
103.6
15.2
1544
131.1
161.5
30.5
1516
42.7
57.9
15.2
1559
67.1
80.8
13.7
1515
102.1
111.3
9.2
1852
27.4
39.6
12.2
1570
83.8
105.2
21.3
1187
131.1
146.3
15.2
1713
150.9
167.6
16.8
1395
Annexure B:
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools
appropriate to the minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of
sampling.
• Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that are Material to
the Public Report.
• In cases where ‘industry standard’ work has been done this would
be relatively simple (eg ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was pulverised to produce a 30
g charge for fire assay’). In other cases more explanation may be
required, such as where there is coarse gold that has inherent
sampling problems. Unusual commodities or mineralisation types
(eg submarine nodules) may warrant disclosure of detailed
information.
Surface Sampling
• Samples were collected as part of a regional mapping program and were
either rock chips from surface or samples from shallow (<1m) pits.
• Samples were placed into individually labelled, mostly consecutively
numbered sample bags.
Reverse Circulation (RC)
• RC drilling was used to collect samples at 5 foot (~1.52m) intervals.
• Approximately 2-4kg was collected from each interval using a riffle splitter
(for dry samples) and a rotary splitter (for wet samples).
• All samples were placed into individually labelled, consecutively numbered
sample bags.
• The RC samples obtained are considered representative of the material
drilled.
Diamond drilling
• Diamond core was collected in HQ triple tube (HQ3 63.5mm) diameter
core.
• Core was cut and quarter core sampled on 2m intervals or lithological
boundaries.
• Colluvium/overburden was not sampled.
• All samples were placed into individually labelled, consecutively numbered
sample bags.
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
Reverse Circulation
• RC drilling was completed using a conventional hammer, 2-slot
interchange and 4.75 inch bit.
• Water injection was generally used after setting 10’ – 20’ of casing
(~6.1m) with holes drilled wet thereafter.
• Holes were drilled vertically using 10 foot (3.05m) rods
Diamond
• Diamond drilling was used to collect HQ3 (63.5mm) diameter core.
• Core holes were drilled vertically, and core was not oriented.
Criteria
JORC Code explanation
Drill sample
recovery
• Method of recording and assessing core and chip sample recoveries
and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
Commentary
•
•
•
•
•
Reverse Circulation
Water inflows were encountered in most holes which may have caused
loss of fine (clay) fraction from some intervals, thereby underestimating
lithium grade (previous metallurgical testwork has indicated that ~80% of
the lithium is in the -10-micron fraction).
Two methods have been used to quantify the potential understatement of
lithium grades in RC drilling. First the results from assaying of bulk
samples taken for metallurgy have been compared to the drill hole
sample. Secondly the Company has twinned several of the RC holes with
diamond core drilling in future drill programs.
Diamond
Core blocks inserted by the drilling company indicated the length of a run
and the amount of recovered core in feet. The site geologist converted this
to metres and core recovery was recorded on the sampling sheet. Core
recovery was the primary focus for the drill contractor and was typically
>90% in the zones of interest.
Core recovery was recorded by the site geologist, and 1m downhole
depths marked prior to geological logging and sampling.
No relationship between recovery and grade was observed.
Logging
• Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
• Qualitative lithological descriptions (colour, weathering, grain size,
lithology, mineralogy, veining textures and other significant features) were
recorded by the field geologist.
• Representative samples of bedrock were collected from each 5 foot
interval of every RC hole and were retained in labelled sample chip trays,
with chip trays photographed on completion of each hole.
• Photos (wet and dry) were taken of all core trays for later review.
Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half or all core
taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of the
• RC samples were split in the field (riffle split if dry; rotary split if wet) and
collected in pre-numbered calico bags.
• Diamond core was cut and quarter or half core sampled.
• Sample preparation at the laboratory involved crushing to 70% less than
2mm, riffle split off 250g, pulverize split to better than 85% passing 75
microns.
• Duplicate samples were inserted approximately every 15 samples to
check the representivity of samples and precision in assaying.
Criteria
JORC Code explanation
•
Quality of
assay data
and
laboratory
tests
•
•
•
Verification of
sampling and
assaying
in situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the
material being sampled.
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
For geophysical tools, spectrometers, handheld XRF instruments,
etc, the parameters used in determining the analysis including
instrument make and model, reading times, calibrations factors
applied and their derivation, etc.
Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable
levels of accuracy (ie lack of bias) and precision have been
established.
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
Commentary
Surface Sampling
• Samples were assayed for lithium only by ALS Laboratories in Reno
Nevada via 4 acid digest of 0.25g sample split.
• No standards, banks or duplicate samples were used.
Reverse Circulation and Diamond
• Samples were assayed by ALS Laboratories in Reno Nevada via 4 acid
digest of 0.25g sample split with a 48 element ICP-MS finish.
• 4 Acid digests are considered to approach a total digest, as some
refractory minerals are not attacked.
• Certified lithium sediment standards were inserted approximately every 15
samples.
• Blank samples were inserted approximately every 15 samples to check for
laboratory contamination.
• Duplicates were taken approximately 1 in every 15 samples.
• All standards, blanks and duplicate data are reviewed as assays are
received. Any QAQC data that fails to meet acceptable confidence limits
set by Jindalee are followed up with the laboratory as an action item.
• Laboratory QAQC involves the use of internal lab standards, splits and
replicates as part of in-house procedures. ALS Laboratories participates in
external umpire assessments to maintain high levels of QAQC in relation
to their peers.
Surface Sampling
• Assay results were verified by consultant geologists and reviewed by
more than one Jindalee geologist.
• Sample locations were surveyed using a handheld Garmin GPS with an
accuracy of +/- 3m horizontally, and +/- 5m vertically.
• Locations are reported in metres NAD83 Zone11.
Reverse Circulation and Diamond
• Assay results were verified by more than one Jindalee geologist.
• Data is received and stored electronically with a comparison between the
.pdf certificates and the .csv data files indicating no errors in transmission.
Criteria
JORC Code explanation
Location of
data points
• Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used
Share your feedback
Discover