Clean Energy Metals Investor Conference Presentation
Released
Released
Announcement PDF
AUGUST 2024
REALISING AMERICA’S
LARGEST LITHIUM
RESOURCE
Ian Rodger
Chief Executive Officer
CLEAN ENERGY METALS
INVESTOR CONFERENCE
ASX:JLL
OTCQX:JNDAF
Jindaleelithium.com
Disclaimer
This Presentation has been prepared by Jindalee Lithium Limited (“Jindalee”, “Company” or “JLL”) and is authorised for release by its Chief Executive Officer, Mr Ian Rodger. Certain
information in this presentation has been derived from third parties and though Jindalee has no reason to believe that it is not accurate, reliable or complete, it has not been
independently audited or verified by Jindalee. Except to the extent required by law, Jindalee makes no representations or warranty as to the accuracy, reliability or completeness of
information in this document and does not take responsibility for updating any information or correcting any errors or omissions which may become apparent after this presentation is
released.
This presentation is for information purposes only. It is not a prospectus, product disclosure statement or other disclosure document under Australian law or any other law (and will not
be lodged with the Australian Securities and Investments Commission or any foreign regulator) and is not, and does not constitute, an invitation or offer of securities for subscription,
purchase or sale in any jurisdiction. In particular, this presentation does not constitute an invitation or offer of securities for subscription, purchase or sale in the United States or any
other jurisdiction in which such an offer would be illegal. The securities referred to in this presentation have not been and will not be registered under the U.S. Securities Act of 1993 as
amended or the securities laws of any state or other jurisdiction of the United States and may not be offered or sole, directly or indirectly in the United States.
This presentation may contain certain forward-looking statements. Forward-looking statements include but are not limited to statements concerning Jindalee’s current expectations,
estimates and projections about the industry in which Jindalee operates, and beliefs and assumptions regarding Jindalee’s future performance. When used in this document, the words
such as “anticipate”, “could”, “plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”, “should”, and similar expressions are forward-looking statements. Although Jindalee
believes that its expectations reflected in these forward-looking statements are reasonable, such statements are subject to known and unknown risks, uncertainties and other factors,
some of which are beyond the control of Jindalee and no assurance can be given that actual results will be consistent with these forward-looking statements.
Such factors may include, among others, risks related to results of current or planned exploration activities, changes in market conditions, obtaining appropriate approvals to undertake
exploration activities in the portfolio of projects, changes in exploration programs and budgets based upon the results of exploration, future prices of minerals resources; grade or
recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining government approvals or financing or in the completion of development or
construction activities; movements in the share price of investments and the timing and proceeds realised on future disposals of investments, force majeure events, as well as those
factors detailed from time to time in the Company’s interim and annual financial statements and reports, all over which are available for review on ASX at asx.com.au and OTC Markets
at otcmarkets.com.
Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking
statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue
reliance on forward-looking statements. To the extent permitted by law, Jindalee and its officers, employees, related bodies corporate and agents disclaim all liability, direct, indirect or
consequential (and whether or not arising out of the negligence, default, or lack of care of Jindalee and/or any of its agents) for any loss or damage suffered by a recipient or other
persons out of, or in connection with, any use or reliance on this presentation or information. This presentation does not constitute investment advice and has been prepared without
taking into account any investor's particular investment objectives, financial circumstances or particular needs and the opinions and recommendations in this presentations are not
intended to represent recommendations of particular investments to particular persons. You should seek professional advice when deciding if an investment is appropriate. All
securities transactions involve risks, which include (among others) the risk of adverse or unanticipated market, financial or political developments.
All amounts are in A$ unless stated otherwise.
Key Investment Highlights
Pure play US lithium company focused on progressing the globally significant McDermitt Lithium Project
Largest Lithium Resource in the USA (21.5Mt LCE1)
Li
Emerging top tier, generational asset, mirroring the scale and style of Thacker Pass project,
currently under construction by Lithium Americas (TSX: LAC – Market Cap ~US$600M2, General
Motors offtaker and largest shareholder, with DoE construction loan of US$2.3B3).
Highly attractive potential source of lithium carbonate for US EV supply chain
Strategically located, shallow ore body, established flow sheet, with MoU4 with POSCO Holdings, a
major supplier and partner to General Motors in North America.
McDermitt poised to meet medium-term Lithium supply deficit
Lithium investment thesis remains robust. McDermitt likely well timed to come to market as EV
transition drives expected supply deficit later in the decade.
Strong Government Support
Eligible for a range of US government incentives such as the Biden Administration's US$369B
Inflation Reduction Act (IRA). 2 x grant funding applications in progress5.
Pivotal year ahead
Several major value catalysts expected in 2H 2024 including; pre-feasibility study (PFS)
completion, potential US Government grant funding award, and ongoing engagement with US
agencies and strategic partners.
3
1.
2.
3.
4.
5.
Refer to JLL ASX release 27/02/2023 “Resource at McDermitt increases to 21.5 Mt LCE”
Based on market close 21 August 2024, share price US$2.80 and 217.4 million shares outstanding (source: S&P CapIQPro)
Refer to Lithium Americas announcement 14 March 2024 link
Refer to JLL ASX release 13/02/2023 “MOU Executed with POSCO Holdings”
Refer to JLL ASX release 30/04/2024,“Jindalee Advances US Government Funding for McDermitt”
Company Overview
Share Price (ASX:JLL, OTCQX:JNDAF)
Corporate Snapshot1
Share Capital (ASX:JLL, OTCQX:JNDAF)
71.4m
Share Price 2
A$0.25
1.20
Options (from 37c to $5.00)
23.8m
1.00
Market Capitalisation
A$17.8m
A$/share
1.40
A$0.25
0.80
21/08/2024
0.60
Aug-24
Aug-24
Aug-24
Jul-24
Jul-24
Jul-24
Jul-24
Jul-24
Jun-24
Jun-24
Jun-24
Jun-24
May-24
May-24
May-24
May-24
Apr-24
Apr-24
Apr-24
Apr-24
Apr-24
Mar-24
Mar-24
Mar-24
Mar-24
Feb-24
Feb-24
A$12.3m
Feb-24
Enterprise Value
Feb-24
A$3.0m
-
Jan-24
Convertible Note
0.20
Jan-24
A$2.1m
Jan-24
Investments 2
0.40
Jan-24
A$6.4m
Jan-24
Cash 1,3
Major Shareholders2
1. Based on completion of Placement, Tranche 1 & 2 convertible notes and
Entitlements Issue (JLL ASX releases on 4 July 2024 and 9 August 2024)
2. As at 21 August 2024
3. Proforma cash balance, includes cash at 30 June 2024 and proceeds
from capital raise announced 4 July 2024
4
L G Dudfield
24.4%
Kale Capital Corporation Pty Ltd
9.2%
HSBC Custody Nominees Pty Ltd
3.6%
Kevrex Pty Ltd
3.5%
Elmix Pty Ltd
3.1%
Analyst: Michael Bentley
Valuation: $2.01 per share
CLICK HERE TO ACCESS RESEARCH
Board and Management team with proven success in
creating value for shareholders
d
d
Wayne Zekulich
Lindsay Dudfield
Ian Rodger
Brett Marsh
Darren Wates
Paul Brown
Non-Executive Chair
Executive Director
Chief Executive Officer
VP Exploration & Development
Non-Executive Director
Non-Executive Director
Mr Wayne Zekulich was
appointed to the Jindalee
Board as Chair on 1
February 2024. Wayne is
a Consultant and NonExecutive Director who
has substantial
experience in advising,
structuring and financing
transactions in the
infrastructure and
resources sectors. Wayne
is currently Chair of ASX
listed gold miner Pantoro
Ltd (ASX:PNR).
Mr Lindsay Dudfield is a
geologist with over 40
years’ experience in multicommodity exploration.
Lindsay has been
responsible for managing
Jindalee since inception,
guiding the Company
through the advancement
of several projects across
various commodities and
jurisdictions. He is also a
Non-Executive Director of
several ASX listed mineral
exploration companies.
Mr Ian Rodger is the
newly appointed CEO of
Jindalee. Ian is an
internationally
experienced mining
executive, with
experience as a mining
engineer working across
two large greenfield mine
developments with Rio
Tinto. He also has a broad
range of corporate
finance and commercial
experience, holding
senior roles at RFC
Ambrian, BHP and Oz
Minerals Ltd (ASX:OZL).
Mr Brett Marsh is a
Geologist with over 25
years of experience. He
has managed all phases
of the mining lifecycle
including greenfield and
brownfield exploration,
project development
(including preliminary
economic assessments,
pre-feasibility and
feasibility), project
construction, mine
operations, and
environmental.
Mr Darren Wates is a
corporate lawyer with
extensive experience in
equity capital markets,
M&A, resources, project
acquisitions / divestments
and corporate. Darren
was significantly involved
in the development, joint
venture partnering and
eventual sale of the Mt
Marion Lithium Project in
roles with ASX listed
company Neometals Ltd
(ASX:NMT).
Mr Paul Brown has over
23 years’ experience in
the mining industry, most
recently with Mineral
Resources (ASX:MIN)
where he was Chief
Executive – Lithium. He
has a strong track record
in project/studies
management and mine
planning and
management. Paul is
currently Chief Executive
Officer of Core Lithium
Ltd (ASX:CXO).
5
Largest Lithium Resource in the USA
McDermitt compares favourably to
Sediment Hosted Peers3
Jindalee trades at an attractive valuation relative to peers
Enterprise Value (US$)1 / Contained LCE2 in Resources (t)
55.6
Resource (Mt)
3,500
Bubble size is contained LCE2 Mt
3,000
McDermitt
21.5
3.2
4.8
6.7
Jindalee
Lithium
Century
Lithium
Arizona
Lithium
American
Lithium
Lithium
Americas
ioneer
Project/s
McDermitt
Clayton
Valley
Big Sandy +
Prairie4
TLC +
Falchani5
Thacker
Pass
Rhyolite
Ridge
Stage3
PFS
Underway
FS
Scoping
PFS
PEA
PEA
Construction
DFS
8
21
32
81
235
181
2,500
Series 1
2,000
19.1
Thacker Pass
6.7
1,500
Clayton Valley
1,000
Sonora
TLC
Rhyolite Ridge
0
0
6
Enterprise
Value (US$M)1
0.4
8.8
3.5
500
12.3
3.3
Big Sandy
500 1,000 1,500 2,000 2,500 3,000 3,500
Resource Li Grade (ppm)
1.
2.
3.
4.
5.
Jindalee EV based on assumptions outlined on slide 4, converted to USD. All others sourced from S&P CapIQPro 21 August 2024
LCE = Lithium Carbonate Equivalent. Data source: various company reports
Source: various company reports. Refer Appendix 1,2 and 3 for further details including data sources and resource classification breakdown
Arizona Lithium holds two development project: a) Big Sandy Sediment Hosted project and b) Prairie Brine Direct Lithium Extraction project
American Lithium holds two lithium development projects: a) Tonopah (TLC) Sediment hosted project and b) Falchini hard rock deposit. Metrics do not include Macusani Uranium deposit
Funding to drive near term catalysts
Successfully raised $6.0M1,2,3 to complete McDermitt PFS and and advance key milestones for 2H 2024. Up to an
additional $9M of funding is available from Mercer Street via mutual agreement1
Key milestones in 2H 2024:
▪ Production of battery grade lithium carbonate from test work (Q3) COMPLETE
▪ Tribal Agreements (Q3)
▪ US Government technical cooperation and research agreement (Q3)
▪ Update on POSCO test work underway in Korea (Q3)
▪ Finalise McDermitt PFS (Q4)
▪ Potential award decision for non-dilutive US Government grant funding1 (Q3/Q4)
▪ Initiate Strategic Partnership/Investment Process (Q4)
1.
2.
3.
Refer to JLL ASX release 04/07/2024 “JLL Secures Funding to Advance McDermitt Lithium Project”
Refer to JLL ASX release 09/08/2024 “Results of Entitlement Issue”
Includes Tranche 2 Convertible Securities approved by shareholders at General Meeting on 21August 2024. Refer to JLL ASX release 21/082024 “Results of General Meeting”
7
McDermitt strategically situated amidst the expansion of
the US battery supply chain
Ownership
100% owned by Jindalee
Location
• Located in Malheur County - on the
Oregon-Nevada border, ~35km west of the
town of McDermitt
• Strategically located in same geological
formation (McDermitt Caldera) as Lithium
Americas’ Thacker Pass Project (19.1Mt
LCE¹) which is under construction
History/Status
• 2018: Initial discovery drill program
• 2023: McDermitt becomes largest Lithium
deposit in USA. MoU with POSCO Holdings
announced4
• PFS due Q4 2024
Tenure and
Resource
• ~55km2 claims area
Features
• Flat lying sediments with low strip ratio
• 3.0Bt @ 1,340ppm for 21.5Mt LCE3
• Ore is soft, amenable to low cost mining
and crushing
• Excellent metallurgical recoveries2
8
1.
2.
3.
4.
Refer to Lithium Americas Thacker Pass Feasibility Study NI43-101 dated 2 November 2022
Refer to JLL ASX release 18/01/2024 “More Exceptional Metallurgical Results From McDermitt”
Refer to JLL ASX release 27/02/2023 “Resource at McDermitt increases to 21.5 Mt LCE”
Refer to POSCO Announcement 13/03/2023, “POSCO Holdings cooperates with Australia’s Jindalee Resources Limited for U.S. McDermitt Clay
Lithium Project” Link
BY 2031, ANNUAL LCE DEMAND FROM 21 US
GIGAFACTORIES IS FORECAST TO BE 602KT
CURRENT DOMESTIC PRODUCTION IS <5KT
Source: Federal Reserve Bank of Dallas; Company announcements, media reports, NAATABATT, North American Lithium-Ion Supply Chain Database
McDermitt Resource contains enough Lithium for >900 million EVs1
Potential to significantly contribute to the growth of the domestic US EV supply chain
✓ Large shallow flat lying sedimentary deposit, with potential to target
higher grade zones early in mine life to improve returns (2,000ppm +)
✓ McDermitt is currently the largest Lithium Resource in the US at 21.5Mt
LCE at a grade of 1,340ppm Li (refer to Appendix 2)
✓ Exploration Target confirms excellent potential for further resource
growth (300-700Mt @ 1,100 - 1,400ppm Li)2
1.
2.
EV = Electric Vehicles. Based on 21.7kg LCE per EV based on average passenger EV sold globally in Q3 2023. Source Adamas Intelligence – link
Refer to JLL ASX release 21/11/2023 “Exploration Target Highlights Further Upside at McDermitt”
Plan view of the 2023 Mineral Resource (at 1523mRL), completed drilling,
Section C-C’ and schematic conceptual Pit Shells 5 and 6
Flowsheet design has leveraged experience of more advanced peers
Similar flowsheet to Thacker Pass validated by LAC1 via extensive pilot plant work and detailed due
diligence by General Motors (largest shareholder) and US DoE (US$2.3B construction loan2)
As received ore
✓ Flowsheet consists of technology and equipment used in different industrial sectors
✓ Beneficiation results3 and leach recoveries highly encouraging4
✓ All phase of PFS test work now fully validated - Lithium Carbonate produced July 20245
Validated by PFS test work
PFS test work in process
Mineral Beneficiation
Process used in phosphate industry
Battery-Grade Lithium
Carbonate (99.8% Li2CO3)
Standard mine processing operations
Clay dewatering
Ore
from
mine
Sizer
Process Plant
Ion Exchange
Li2CO3
crystallisation
10
1.
2.
3.
4.
5.
Attrition
Scrubbing
Process used in hard rock conversion to
produce lithium chemicals
Mg & Ca
precipitation
Drying
Screen
Standard chemical process
MgSO4
crystallisation
Thickener
Traditional hydrometallurgy
Neutralisation/CCD
washing/filtration
Battery
grade
Li2CO3
Lithium Americas Corporation (TSX: LAC)
Refer to Lithium Americas announcement 14 March 2024 link
Refer to JLL releases 15/11/2023 “Exceptional Metallurgical Results from McDermitt” and 31/07/2024 “Quarterly Cashflow & Activity Reports June 2024”
Refer to JLL release 18/01/2024 “More Exceptional Metallurgical Results from McDermitt”
Refer to JLL release 31/07/2024 “Battery-Grade Lithium Carbonate produced from McDermitt”
Centrifuge
Acid
Leaching
Battery-Grade Lithium
Carbonate (99.8%) produced July
20245
Lithium investment thesis
remains robust
Implied Lithium inventory in China’s supply chain2
(tonnes LCE)
▪ Short term softness driven by Chinese de-stocking and mismatch in short-term
demand/supply in rapidly growing market
▪ Recent lower prices have meant c.200kt LCE of higher cost supply has been “shut-in”1
▪ Lithium demand expected to grow from 1Mtpa in 2023 to 3.3Mtpa in 2030 (avg. CAGR
~19%)1, driven by EV transition
▪ Therefore, market deficit forecast to emerge over the medium-term, with investment
in new supply required to be incentivised in order meet demand2
McDermitt poised to meet medium-term supply deficit
Inventory Change
Grid
Industrial
EV
3.3
Lithium Demand1
by Application (Mt LCE)
Lithium Supply and Demand3
(Mt LCE)
6
Consumer Electronics
Probable
Highly Probable
Operating & Brownfield
Demand
5
Mobility
2.3
4
Supply gap forecasted
despite dozens of new
projects announced
+28%
3
1.3
1.0
2
1
2040
2039
2038
2037
2036
2035
2034
2033
2032
2031
2030
2029
2028
2027
2026
2025
0
2024
2030E
2023
2027E
2022
2024E
2021
2023
Albemarle Q4 2023 results presentation and video conference link
Fast markets 19 January 2024 link
Benchmark Minerals Q2 2023, weighted. Lithium America February 2024 Corporate presentation
link
2020
11
1.
2.
3.
US Government grant funding applications progressing with
estimated notification due by 2H CY 20241
Applications lodged with two US Government agencies (Defense and Energy) with strong support from state politicians,
agencies and potential industry partners
US Agency
Program
DPA Title III
Status
Use of Proceeds
Application submitted, passed initial reviews and under assessment
Accelerate McDermitt Feasibility Study and
associated drill program and test work
Engineering, procurement, construction and development
of a lithium processing facility at McDermitt
Co-fund
Co-fund
Expected Structure
Relative Quantum
12 1.
Battery Manufacturing and Recycling Grant
Refer to JLL ASX release 30/04/2024 “Jindalee Advances US Government Funding for McDermitt”
Pivotal year ahead for Jindalee
De-risking is ongoing, with several major value catalysts expected in 2H 2024
COMMUNITY
ENGAGEMENT
STRENGTHEN
TEAM
✓ New Chair1 and CEO2
GOVERNMENT
SUPPORT
✓ Mineral Beneficiation
test-work3
✓ DoE & DoD Grant
funding applications
submitted6
✓ Production of Lithium
Carbonate5
13
Refer to JLL ASX release 27/12/2023 “Chair Transition”
Refer to JLL ASX release 4/12/2023 “Appointment of Ian Rodger as CEO”
Refer to JLL ASX release 15/11/2023 “Exceptional Metallurgical Results from McDermitt”
Refer to JLL ASX release 18/01/2024 “More Exceptional Metallurgical Results from McDermitt”
Refer to JLL ASX release 31/07/2024 “Battery-Grade Lithium Carbonate produced from McDermitt”
Refer to JLL ASX release 30/04/2024, “Jindalee advances US Government Funding for McDermitt”
Baseline studies
Q4 2024
Engage with potential
partners post PFS
TECHNICAL
DE-RISKING
✓ Leach test-work4
PREPARATION
FOR NEXT
PHASE
Q3 2024
Update on POSCO test
work under MoU
Q3 2024
Accelerate engagement
with local Tribes and
community
Key appointments to
support transition to
developer
1.
2.
3.
4.
5.
6.
PARTNERSHIPS
Q3 2024
US Agency technical
cooperation and
research agreement
2H 2024
Potential Award of
DoE/DoD Grants
Finalisation of
Exploration Plan of
Operations
DEFINE VALUE
POTENTIAL OF
MCDERMITT
Q4 2024
PFS Completion
Thank you
Further information:
IAN RODGER
Chief Executive Officer
email: enquiry@jindalee.net
phone: +61 8 9321 7550
14
Supporting Slides
US bi-partisan support to de-risk critical minerals supply chain
Establishing a secure supply of Lithium is a priority for US given current reliance on China, which
produces c.55%1 of global lithium chemical supply and c.75%2 of lithium-ion batteries
World’s largest clay and hard rock lithium
projects. 1. McDermitt Lithium Project.
China Dominates the Global Lithium
Industry. Can the U.S. Ever Catch Up?
America's Military Needs to Detach Critical
Mineral Supply Chains From China
August 10, 2023
October 2, 2023
March 16, 2023
US to Ban Pentagon Battery Purchases From
China’s CATL, BYD
Senator Angus King: “Downright Dangerous,”
King says of U.S. Reliance on China for
Lithium
US is ‘10 to 20 years behind’ China in battery
production
January 20, 2024
Exxon to begin producing lithium to
feed surging battery demand
November 13, 2023
December 12, 2023
The US wants to end its reliance on
Chinese lithium. Its policies are doing the
opposite.
January 23, 2024
November 7, 2023
US lithium production: A vital pillar of national
security and energy independence
December 7, 2023
1.
2.
16
International Energy Agency – World Energy Outlook 2023
International Energy Agency - Global Supply Chains of EV Batteries
Wide range of incentives potentially
available to McDermitt
INFLATION REDUCTION ACT
Provides substantial incentives to boost domestic critical minerals and battery
production
▪
On 16 August 2022 the Inflation Reduction Act (confirming $369B in funding to reduce
carbon emissions by 40% by 2030) became law¹
▪
From 2023 40% of EV’s battery materials must be sourced from the US (or FTA partners)
to qualify for the EV tax credit (rising to 80% by 2027)
▪
Under the Advanced Production Credit (section 45X):
▪
Domestic battery manufacturers eligible for US$35 per Kwh
▪
Domestic miners/processors producing specified critical minerals will be eligible
for tax credits equivalent to 10% of production costs
▪
$40B is available to the DOE’s Innovative Technology Loan Guarantee to support
projects that bolster a domestic supply of critical minerals
▪
Also provided additional funding to other Department of Energy (DoE) and Department
of Defense (DoD) grant and loan programs
17 1.
Refer to https://www.congress.gov/bill/117th-congress/house-bill/5376/text
1.
https://www.congress.gov/bill/117th-congress/house-bill/5376/text
Recent examples of grant and loan funding
GRANTS (PRE-DEVELOPMENT PHASE)
✓ February 2024 – Perpetua Resources awarded an additional US$34.6M1 grant (total
US$59.4M) from DoD (under Defense Production Act Title III authorisations) for
construction readiness and permitting for Stibnite Gold and Antimony Project in Idaho
✓ November 2023 – Talon Metals Corp signs definitive agreement with DoE to provide
US$114.8M2 in grant funding (under Bipartisan Infrastructure Law) to co-fund Battery
Minerals Processing Facility in North Dakota
✓ September 2023 – Talon Metals Corp awarded US$20.6M3 in grant funding from DoD
(under Defense Production Act Title III authorisations) to co-fund Nickel exploration in
Minnesota and Michigan
LOANS (DEVELOPMENT PHASE)
✓ January 2023 – the DOE announced a US$700M conditional loan to the Rhyolite Ridge
Project (3.4Mt LCE4) to finance on-site processing of lithium carbonate5
•
March 2024 – Lithium Americas received conditional commitment for US$2.3B
construction loan6 from the DOE to fund c.75% of Thacker Pass Project capex
•
•
18
Interest: Treasury rates with 0% Spread
Tenor: 24 years
1.
2.
3.
4.
5.
6.
Source: Perpetua news release 12 February 2024 link
Source: Talon Metals news release 2 November 2023 link
Source: Talon Metals news release 12 September 2023 link
Source: ioneer website link
Source: Loan Programs Office news release 13 January 2023 link
Source: Lithium Americas news release 14 March 2024 link
Jindalee Track Record of Value Creation
Jindalee's mission is to create wealth for shareholders through the discovery of world-class mineral deposits
2002
Jindalee lists
July 2002 after raising $2.65M
via 25c IPO cornerstoned by
Teck (TSX:TECK)
2019
Jindalee raises $1M from
shareholders to fund further
drilling at McDermitt (first raise
since 2002 IPO)
2022
Spin-out of Australian assets as
Dynamic Metals (ASX:DYM)
approved; priority entitlement
to Jindalee shareholders,
Jindalee holds 25%
19
2004
2005
2007
Jindalee acquires uranium
projects in NT and WA
Uranium projects spun-out as
Energy Metals (ASX:EME); priority
entitlement to Jindalee
shareholders, Jindalee holds 40%
Jindalee sells gold projects into
Alchemy Resources IPO
(ASX:ALY) for 22% of ALY; priority
entitlement to Jindalee
shareholders
2018
2010
2009
Jindalee stakes McDermitt Lithium
Project; drills 4 "proof of concept"
holes which confirm size potential
of McDermitt
2023
Resource update (62 holes) confirms
McDermitt now 21.5Mt LCE – the largest
lithium deposit in the US and a company
making project. MoU with POSCO
announced. Detailed Metallurgical testwork
and PFS commences.
Name change to Jindalee Lithium
Jindalee pays shareholders $0.55
dividend (fully franked); retains
$8M cash to continue search for
"company making" project
2024
Exceptional metallurgical
testwork results feed into PFS
(due for completion Q4 2024)
Friendly proportional takeover
($1.02 cash) for EME; Jindalee
accepts for 70% of its EME
shares
Appendix 1: Peer Comparison Data
Comparable North American Sediment Hosted Lithium Deposits
Deposit
Owner
Stage
Resource Category
Resource (Mt)
Grade (ppm
Li)
Thacker Pass
TSX:LAC
FS Complete
Measured
535
2,450
7.0
Indicated
923
1,850
9.1
Inferred
297
1,870
3.0
Measured, Indicated &
Inferred
1,754
2,036
Measured
75
1,836
0.7
Indicated
183
1,688
1.6
Inferred
93
1,759
0.9
Measured, Indicated &
Inferred
351
1739
Measured
103
3,480
1.9
Indicated
188
3,120
3.1
Inferred
268
2,650
3.7
Measured, Indicated &
Inferred
559
2962
Measured
858
990
4.5
Indicated
280
891
1.3
Inferred
187
820
0.8
Measured, Indicated &
Inferred
1,325
945
Rhyolite Ridge
Sonora
Clayton Valley
20
ASX:INR
Ganfeng
TSXV:LCE
DFS Complete
PFS Complete
FS Complete
*deposit includes Boron (B) credits
Cut-off (ppm Li)
1,047
1,090/
5000 B*
1,000
200
Contained LCE
(Mt)
19.1
3.3
8.7
6.7
Source
Company website – Feasibility
Study November 2022
link
Company website – announcement
April 2024
link
Bacanora Lithium website –
announcement January 2018
link
Company website – Feasibility
Study June 2024
link
Appendix 1: Peer Comparison Data
Comparable North American Sediment Hosted Lithium Deposits
Deposit
Owner
Stage
Resource Category
Resource (Mt)
Grade (ppm
Li)
TLC
TSXV:LI
PEA Complete
Measured
345
1,255
2.3
Indicated
136
1,148
0.9
Inferred
53
1,151
0.3
Measured, Indicated &
Inferred
534
1219
Indicated
15
1,940
0.2
Inferred
18
1,780
0.2
Indicated & Inferred
33
1,850
Big Sandy
21
ASX:AZL
Scoping Study
Cut-off (ppm Li)
1000
Contained LCE
(Mt)
December 2022 Resource Estimate
link
3.5
Measured
800
Source
0.3
Company website – PFS December
2023
link
Appendix 2: McDermitt Mineral Resource
McDermitt Mineral Resource (2023)1
Indicated Resource
Cut-off
Grade
(ppm Li)
1,000
Inferred Resource
Indicated and Inferred Resource
Tonnage
(Mt)
Li Grade
(ppm)
LCE (Mt)
Tonnage (Mt)
Li Grade
(ppm)
LCE
(Mt)
Tonnage (Mt)
Li Grade
(ppm)
LCE (Mt)
1,470
1,420
11.1
1,540
1,270
10.4
3,000
1,340
21.5
Summary of 2023 McDermitt Mineral Resource Estimate at the reporting cut-off of 1,000ppm (totals may vary due to rounding)
1. Refer to JLL ASX release 27/02/2023 “Resource at McDermitt increases to 21.5 Mt LCE”
22
Appendix 3: Peer Comparison Data
Other North American Comparables
Contained LCE
(Mt)
Source
106 (mg/L)
4.5
Company Website – PFS December
2023
NR1
101(mg/L)
1.8
Indicated & Inferred
NR1
NR1
Measured
65
2,915 ppm
1.0
Indicated
327
2,472 ppm
4.3
Inferred
348
1,785 ppm
3.3
Measured, Indicated &
Inferred
740
2,191 ppm
Deposit
Owner
Stage
Resource Category
Prairie (Brine)
ASX:AZL
PFS Complete
Measured
Falchani
(Hardrock)
23
TSXV:LI
1) NR = Not Reported
PEA Complete
Resource (Mt)
Li Grade
Indicated
NR1
Inferred
Cut-off (ppm Li)
N/A
1,000
6.3
8.6
link
Company Website – Resource
Increase Announcement October
2023
link
Additional information
Competent Person Statement
References
The Exploration Results and Mineral Resource estimates referred to in this presentation
were first reported in accordance with ASX Listing Rules 5.7 and 5.8 in the
announcements as cross-referenced. The Company confirms that it is not aware of any
new information or data that materially affects the information included in the relevant
market announcements and, in the case of the Mineral Resource estimates, that all
material assumptions and technical parameters underpinning the estimates in the
relevant market announcement continue to apply and have not materially changed.
•
21/08/2024, “Results of General Meeting”
•
09/08/2024, “Application for quotation of securities”
•
09/08/2024, “Results of Entitlement Issue”
•
31/07/2024, “Quarterly Cashflow & Activities Report – June 2024”
•
31/07/2024, “Battery-Grade Lithium Carbonate produced from McDermitt”
•
04/07/2024, “JLL Secures Funding to Advance McDermitt Lithium Project”
•
30/04/2024, “Jindalee advances US Government Funding for McDermitt”
•
18/01/2024, “More Exception
Share your feedback
Discover