Investor Presentation
Released
Released
Announcement PDF
AUSTRALIA’S NEWEST IRON ORE PRODUCER
Corporate Presentation
1 June 2023
Disclaimer
This Presentation has been prepared by Jindalee Resources Limited (“Jindalee”, “Company” or “JRL”) and is authorised for release by its Executive Director, Mr Lindsay Dudfield. The information in this
presentation is a professional opinion only and is given in good faith on the basis of information available as at the date of this presentation. Certain information in this presentation has been derived
from third parties and though Jindalee has no reason to believe that it is not accurate, reliable or complete, it has not been independently audited or verified by Jindalee. Except to the extent required
by law, Jindalee makes no representations or warrant as to the accuracy, reliability or completeness of information in this document and does not take responsibility for updating any information or
correcting any errors or omissions which may become apparent after this presentation is released.
This presentation is for information purposes only. It is not a prospectus, product disclosure statement or other offer document under Australian law or any other law (and will not be lodged with the
Australian Securities and Investments Commission or any foreign regulator) and is not, and does not constitute, an invitation or offer of securities for subscription, purchase or sale in any jurisdiction. In
particular, this presentation does not constitute an invitation or offer of securities for subscription, purchase or sale in the United States or any other jurisdiction in which such an offer would be illegal.
The securities referred to in this presentation have not been and will not be registered under the U.S. Securities Act of 1993 as amended or the securities laws of any state or other jurisdiction of the
United States and may not be offered or sole, directly or indirectly in the United States.
This presentation may contain certain forward-looking statements. Forward-looking statements include but are not limited to statements concerning Jindalee Resources Limited’s (Jindalee’s) current
expectations, estimates and projections about the industry in which Jindalee operates, and beliefs and assumptions regarding Jindalee’s future performance. When used in this document, the words
such as “anticipate”, “could”, “plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”, “should”, and similar expressions are forward-looking statements. Although Jindalee believes that its
expectations reflected in these forward-looking statements are reasonable, such statements are subject to known and unknown risks, uncertainties and other factors, some of which are beyond the
control of Jindalee and no assurance can be given that actual results will be consistent with these forward-looking statements.
Such factors may include, among others, risks related to regulatory approvals of or in connection with the proposed transaction, actual results of current or planned exploration activities, change in
market conditions which affect the completion of the transaction, obtaining appropriate approvals to undertake exploration activities in the portfolio of projects, changes in exploration programs and
budgets based upon the results of exploration, future prices of minerals resources; grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining
government approvals or financing or in the completion of development or construction activities; movements in the share price of investments and the timing and proceeds realised on future disposals
of investments, the impact of the COVID 19 pandemic as well as those factors detailed from time to time in the Company’s interim and annual financial statements and reports, all over which are
available for review on ASX at asx.com.au and OTC Markets at otcmarkets.com.
Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements will prove to
be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking
statements.To the extent permitted by law, Jindalee and its officers, employees, related bodies corporate and agents disclaim all liability, direct, indirect or consequential (and whether or not arising out
of the negligence, default, or lack of care of Jindalee and/or any of its agents) for any loss or damage suffered by a recipient or other persons out of, or in connection with, any use or reliance on this
presentation or information. This presentation does not constitute investment advice and has been prepared without taking into account the recipient’s investment objectives, financial circumstances
or particular needs and the opinions and recommendations in this presentations are not intended to represent recommendations of particular investments to particular persons. Recipients should seek
professional advice when deciding if an investment is appropriate. All securities transactions involve risks, which include (among others) the risk of adverse or unanticipated market, financial or political
developments.
All amounts are in A$ unless stated otherwise.
2
Introduction to Jindalee
Focused on progressing a world-class, Tier 1 lithium deposit in McDermitt (100% owned)
Significant Indicated + Inferred Mineral Resource (21.5Mt LCE) with excellent metallurgy
McDermitt’s large scale is amenable for a low cost, bulk mining operation
McDermitt has the potential to materially change US lithium supply dynamics, close proximity to
major lithium customers
Jindalee has a track record of value creation (Management has “skin in the game”)
Portfolio of Australian critical commodities spun-out as Dynamic Metals (ASX: DYM) mid-Jan 2023
(Jindalee holds 25.5% of DYM); Jindalee is now a pure-play US Lithium company
3
Company Overview
Corporate Snapshot
Share Capital (ASX:JRL, OTCQX:JNDAF)
57.4m
Share Price 1
$2.01
Unlisted Options (from 40c to $5.00) 2
5.0m
Market Capitalisation 1
$115.3m
Cash (31/03/2023) 3
$2.8m
Investments 4
$4.7m
Debt
Nil
Enterprise Value
1.
Share price as at 01/06/2023
2.
Options on issue represent 5.0m
3.
Cash on hand as at 31/03/2023
4.
Share investments as at 01/06/2023 - DYM:ASX, EME:ASX
$107.8m
Major Shareholders
L G Dudfield
25.7%
Kale Capital Corporation Pty Ltd
7.2%
Perennial Value Management
5.5%
Elmix Pty Ltd
3.5%
Kevrex Pty Ltd
3.5%
4
Directors & Management
Justin Mannolini
Non Executive
Chairman
•
•
•
Lindsay Dudfield
Executive
Director & CEO
•
•
•
•
Darren Wates
Non Executive
Director
•
•
•
Justin has been a Non-Executive Director since 2013
Justin is a partner in the Corporate Advisory Group of
Australian law firm Gilbert + Tobin, and was previously an
Executive Director with Macquarie Capital
Justin has more than 20 years’ experience in corporate
finance as a lawyer and investment banker and has a
combined degree in Commerce and Law (with Honours)
Paul Brown
Non Executive
Director
Lindsay is a geologist with over 40 years’ experience in
multi-commodity exploration, including senior roles with
the mineral divisions of Amoco and Exxon
Previous founding Director of Dalrymple Resources
Founded Jindalee and has managed the Company since
inception
Member of the AusIMM and AIG
Brett Marsh
VP Exploration
USA
Darren has over 23 years’ experience in equity markets,
M&A and project acquisitions/divestments
Darren is the founder and principal of Corpex Legal, a
practice providing corporate, legal and commercial
services to ASX listed companies, including Neometals
(ASX:NMT) since 2016 (previously NMTs’ legal counsel)
Darren has degrees in Law and Commerce
•
•
•
•
•
•
Carly Terzanidis
Joint Company
Secretary
•
•
Paul has over 23 years’ experience in the mining industry, most
recently with Mineral Resources (ASX: MIN) where he was Chief
Executive – Lithium, and Chief Executive - Commodities
Paul has held senior operating roles with Leighton, HWE and FMG
and has a strong track record in technical leadership,
project/studies management and mine planning and management
Paul has a Masters in Mine Engineering M.Eng (MI)
Brett is a geologist with over 25 years’ experience in mineral
exploration and mining in the Americas, including senior roles
with Luna Gold, Newmont, Freeport-McMoRan, Phelps Dodge
and Asarco
Qualifications include a Master of Science (Geology) and an MBA
Brett is a Certified Professional Geologist (CPG) and a member of
the Society for Mining, Metallurgy & Exploration (SME)
Carly has 20 years’ experience in the financial services industry,
including roles with stockbroking and investment firms, with a
focus on Corporate Finance and company secretarial support
Carly is a Chartered Secretary, an Associate of the Governance
Institute of Australia and holds a Bachelor of Commerce with
majors in Accounting and Corporate & Resources Administration
5
United States of America (USA)
✓
Substantial McDermitt Lithium Project
✓
Mineral Resource with huge upside
✓
Strong Government support for critical minerals projects
✓
Localisation of cathode production in US highlights
strategic value of McDermitt
--------------------------------------------------------------------------------------------------------------------------------------
Asset Portfolio
Australia
✓
Strong, diverse portfolio of 100% owned projects
✓
Potential for Nickel, Lithium, Gold, Magnesite and Iron Ore
✓
Strategic investments in Uranium, Nickel, Gold and Copper
✓
Spin-out of Australian assets via Dynamic Metals (ASX: DYM)
completed mid-Jan 2023 (Jindalee owns 25.5% of DYM)
6
Lithium Supply – Demand and the US
7
Lithium Demand (and Price) is Accelerating
Forecast demand dominated by automotive industry – placing sustained pressure on lithium price.
From 1H 2021 to 1H 2022:
•
Global passenger EV registrations increased from 4.40M units to 6.23M units (+42%)
•
Average battery pack capacity of passenger EV increased from 24.8GWh to 31.4 GWh (+27%)
•
Global battery capacity increased from 109.0GWh to 195.5 GWh (+79%)
•
IEA predict 14M EVs will be sold in 2023 (+35% on 2022)
Source: Fastmarkets, Goldman Sachs
8
Significant Supply Shortage Looming
Looming supply shortage as electric vehicles aggressively drive the need for lithium.
Source: Goldman Sachs (04/23), US Bureau of Transportation
“We can buy electric car batteries from Asia, or we can
make them in America”
– Jennifer Granholm (US Secretary of Energy)
9
USA Battery Production Operating and Announced
Strong Bipartisan Support for US Critical Mineral Projects
Jindalee is encouraged by recent announcements from both sides of
US politics expressing concern with the current dependence of the US
on foreign sources of critical minerals (including lithium)
In March 2022, Senator Wyden (Democrat, Oregon) introduced legislation
to support processing and production of critical minerals to increase and
expand domestic manufacturing and ease reliance on foreign sources of oil and gas¹
In March 2022 President Biden invoked the Defense Production Act to accelerate domestic
production of battery materials, including lithium²
In June 2022 President Biden announced $7.5B to build 500,000 EV chargers across the US
and $7B for critical minerals supply chains, key pieces of the Bipartisan Infrastructure Law³
On 16 May 2023 the Dept of the Interior released a Solicitor’s Opinion supporting “the timely review of
mining proposals on federal lands”, noting the federal government is working on recommendations to
update “existing mining laws, regulations and permitting processes.”⁴
1. https://www.wyden.senate.gov/news/press-releases
2. https://whitehouse.gov/briefing/2022-03-31
3. https://whitehouse.gov/briefing/2022-06-09
4. https://www.doi.gov/pressreleases
Inflation Reduction Act - US Critical Mineral Projects
On 16 August 2022 the Inflation Reduction Act (confirming $369B in
funding to reduce carbon emissions by 40% by 2030) became law:¹
•
from 2023 40% of EV’s battery materials must be sourced from the US
(or FTA partners) to qualify for the EV tax credit (rising to 80% by 2027)
•
under the Advanced Production Credit miners producing critical minerals will
be eligible for tax credits equivalent to 10% of production costs
•
$40B is available to the DOE’s Innovative Technology Loan Guarantee to support
projects that bolster a domestic supply of critical minerals
On 13 January 2023 the DOE announced a $700M conditional loan to the Rhyolite Ridge
Project (3.4Mt LCE²) to finance on-site processing of lithium carbonate³
On 22 February 2023 Lithium Americas announced receipt of a Letter of Substantial Completion for a
loan from the DOE with funding expected to provide up to 75% of Thacker Pass Project capex⁴
1.
2.
3.
4.
https://www.congress.gov/bill/117th-congress/house-bill/5376/text
https://www.ioneer.com/projects/about-rhyolite-ridge/reserves-resources
https://www.energy.gov/lpo/articles/lpo-announces-conditional-commitment-ioneer-rhyolite-ridge-advance-domestic-production
https://www.lithiumamericas.com/_resources/news/nr_20230222.pdf
McDermitt Lithium Project
13
McDermitt Overview
Location
• The Project is located in Malheur County located on the
Oregon-Nevada border, ~35km west of the town of McDermitt
at the northern end of the McDermitt volcanic caldera
History
• JRL completed an initial 4 hole drilling program in Sept 2018,
intersecting broad widths of sediment host lithium
mineralisation
• A total of 62 holes (33 RC & 29 Diamond) have now been
drilled at McDermitt, with the Mineral Resource increasing
after each drilling program
• In Feb 2023 JRL announced an updated Indicated and Inferred
Mineral Resource for McDermitt
Tenure &
Resource
• McDermitt is the largest lithium deposit in the US (by
contained Li)
• Indicated + Inferred Mineral Resource: 3.0 Bt @ 1,340ppm Li
(1,000ppm Li cut-off) for 21.5 MT LCE
• 54.6km2 claims area (100% owned)
Features
• McDermitt will be a low cost mining operation:
• Flat lying sediments with low strip ratio
• Ore is soft, amenable to low cost mining and crushing
• Excellent metallurgical recoveries
14
2022 McDermitt Resource = 13.3 Mt LCE
McDermitt Mineral Resource (2022)
Cut-off
Grade (ppm
Li)
1,000
Indicated Resource
Tonnage
(Mt)
Li Grade
(ppm)
616
1,460
Inferred Resource
LCE
(Mt)
4.8
Tonnage
(Mt)
Li Grade
(ppm)
1,200
1,310
Indicated & Inferred Resource
LCE
(Mt)
8.4
Tonnage
(Mt)
Li Grade
(ppm)
1,820
1370
LCE
(Mt)
13.3
Summary of 2022 McDermitt Mineral Resource Estimate at the reporting cut-off of 1,000ppm. Note: totals may vary due to rounding.
Infill and extensional drilling commenced late July 2022 (21 holes)
Plan view of the 2022 Mineral Resource (at 1523mRL)
Refer to ASX release, 06/07/2022, “170% Increase to Indicated Resource at McDermitt”
15
2022 Drilling Program highly successful
2022 drilling (21 holes) across and outside McDermitt resource confirmed wide intercepts from shallow depths & excellent continuity
Significant intercepts recorded from 20 holes:
MDD025:
182.2m @ 1197 ppm Li from 21.4m
MDRC024:
68.6m @ 1669 ppm Li from surface
MDD028:
131.6m @ 1219 ppm Li from 21.9m
MDRC025:
50.3m @ 1512 ppm Li from surface
16
2023 McDermitt Resource = 21.5 Mt LCE
McDermitt Mineral Resource (2023)
Cut-off
Grade (ppm
Li)
1,000
Indicated Resource
Tonnage
(Mt)
Li Grade
(ppm)
1,470
1,420
Inferred Resource
LCE
(Mt)
11.1
Tonnage
(Mt)
Li Grade
(ppm)
1,540
1,270
Indicated & Inferred Resource
LCE
(Mt)
10.4
Tonnage
(Mt)
Li Grade
(ppm)
3,000
1,340
LCE
(Mt)
21.5
Summary of 2023 McDermitt Mineral Resource Estimate at the reporting cut-off of 1,000ppm. Note: totals may vary due to rounding.
Huge increase in McDermitt Resource from 2022 to 2023
• Total Contained LCE up 62% (from 13.3 Mt to 21.5 Mt)
• Total Indicated LCE up 131% (from 4.8 Mt to 11.1 Mt)
• Indicated now 52% of Total LCE (from 36% in 2022)
Plan view of the 2023 Mineral Resource (at 1523mRL)
Refer to ASX release, 27/02/2023, “Resource at McDermitt increases to 21.5 Mt LCE”
17
Highly Encouraging Recent Metallurgical Results
There are 2 main processing routes for sediment hosted Lithium deposits:
•
Acid Leaching (H2SO4 or HCl): Thacker Pass (LAC), Rhyolite Ridge (INR)
•
Alkali Salt (sulphation) Roasting: Sonora (Ganfeng)
….with excellent results achieved at McDermitt from both process routes = Options!
Acid Leaching:
•
Beneficiation (attrition scrubbing) increases Li content in clay fraction by 61%
•
Li extraction rates of 97% (H2SO4) & 98% (HCl) at moderate T, atmospheric P
Alkali Salt Roasting:
•
Produced Li3PO4 assaying 5.89% Li from ore grading 0.15% Li (40x uplift, before purification)
•
Testwork also confirmed Li extraction of 89.5% using salts recycled from roasting & leaching
•
Li3PO4 can be converted to Li2CO3 or LiOH
Li3PO4 produced from McDermitt ore
Review by Fluor (24 March 2023) recommends Acid Leach with Beneficiation as preferred flowsheet –
testwork to optimise this flowsheet and support PFS to begin immediately
18
Edit Text
Edit Text
Responsibility to the Local Environment
21
Social Responsibility in the United States
McDermitt is located on open rangeland in SE Oregon, administered by the Bureau of
Land Management (“BLM”). The area is sparsely populated and has a long history of
both ranching and mining.
Jindalee takes its responsibility to the environment and the local community seriously
and employs a dedicated team of highly experienced environmental consultants to
help manage all aspects of our licence to operate. Extensive environmental and
cultural baseline studies were completed in 2022, with no red flags noted.
Measures undertaken to minimise our impact on the environment and community
include:
•
Restricting drilling programs to summer & autumn months to reduce impact on
fauna and ranching activities
•
Cultural resource surveys undertaken before commencing drilling
•
Drilling on existing cleared areas (tracks, fencelines) wherever possible
•
Holes plugged on completion and disturbed areas rehabilitated and re-seeded
•
Preference given to local contractors and services, where available
•
Building internal capacity for community engagement in the US
Historic Opalite Mercury Mine (abuts McDermitt Project)
22
Comparable Sediment Hosted Lithium Deposits
Jindalee is undervalued compared with our Peers
Tonnes v Grade (contained LCE indicated by size of bubble)
Deposit
Owner
COG
(ppm Li)
Market Cap.
(A$m)
McDermitt
ASX:JRL
1000
115
Sonora
Ganfengº
1000
N/A
Thacker Pass
TSX:LAC
1047
4,951
Clayton Valley
TSX:LCE
900
157
Tonopah
TSX:LI
1000
606
Rhyolite Ridge
ASX:INR
1090/5000 B*
703
Big Sandy
ASX:AZL
800
121
Market capitalisations as at: 01/06/2023
(ºBCN acquired by Ganfeng 26/01/2022; *deposit includes B credits)
Source: various company reports. Refer Appendix 1 for detailed information.
23
Upcoming Milestones and Activity
✓
•
Major Mineral Resource update announced Feb 2023
✓
•
Flowsheet optimisation underway (Fluor)
✓
•
Exploration Plan of Operations (EPO) deemed complete by BLM May 2023
✓
•
Detailed studies (mining & processing) underway
✓
•
Further drilling to commence Sep Q 2023 (scale of program subject to approvals)
✓
•
Building and strengthening team, both in US and at Board level
✓
•
MOU with POSCO announced Feb 2023; engagement with other US end users and strategics ongoing
24
Additional Information
Competent Person Statement
References
The information in this report that relates to Exploration Results and Mineral Resources is based
on information compiled by Mr Lindsay Dudfield and Mr Brett Marsh. Mr Dudfield is a director,
shareholder and consultant to the Company and a Member of the Australasian Institute of Mining
and Metallurgy and the Australian Institute of Geoscientists. Mr Marsh is an employee of the
Company and an American Institute of Professional Geologists (AIPG) Certified Professional
Geologist and a Registered Member of the Society for Mining, Metallurgy & Exploration (SME).
Both Mr Dudfield and Mr Marsh have sufficient experience relevant to the styles of mineralisation
and types of deposits under consideration, and to the activity being undertaken, to qualify as
Competent Persons as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Minerals Resources and Ore Reserves.’ Mr Dudfield and Mr Marsh consent to
the inclusion in this report of the matters based on this information in the form and context in
which it appears.
•
16/05/2023, “McDermitt Progress Update”
•
28/04/2023, “Quarterly Cashflow Report” and “Quarterly Activities Report”
•
24/03/2023, “Preferred Lithium Extraction Process for McDermitt Project”
•
27/02/2023, “Resource at McDermitt increases to 21.5 Mt LCE”
•
13/02/2023, “MOU Executed with POSCO Holdings”
•
13/01/2023, “Dynamic Metals raises $7M in IPO – to list on ASX”
•
14/12/2022, “Outstanding final assays at McDermitt lithium project”
•
24/11/2022, “Outstanding intercepts continue at McDermitt lithium project”
•
11/11/2022, “Excellent intercepts from RC drilling at McDermitt”
The information in this report that relates to the Mineral Resource Estimate for the McDermitt
deposit is based on information compiled by Mr Arnold van der Heyden, who is a Member and
Chartered Professional (Geology) of the Australasian Institute of Mining and Metallurgy and a
Director of H&S Consultants Pty Ltd. Mr van der Heyden has sufficient experience relevant to the
style of mineralisation and type of deposit under consideration and to the activity being
undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code). The
Company confirms that it is not aware of any further new information or data that materially
affects the information included in the original market announcements by Jindalee Resources Ltd
(JRL) entitled “Resource at McDermitt increases to 21.5 Mt LCE” released on 27 February 2023 and
in the case of estimates of Mineral Resources, that all material assumptions and technical
parameters underpinning the estimates in the relevant market announcement continue to apply
and have not materially changed. To the extent disclosed above, the Company confirms that the
form and context in which the Competent Person’s findings are presented have not been
materially modified from the original market announcement.
•
28/10/2022, “Notice of Annual General Meeting/Proxy Form”
•
25/10/2022, “Strong lithium intercepts from drilling at McDermitt (US)”
•
14/10/2022, “Positive results from metallurgical testwork at McDermitt ”
•
19/09/2022, “Strong first assays from 2022 drilling program at McDermitt”
•
06/07/2022, “170% Increase to Indicated Resource at McDermitt”
•
24/03/2022, “Change in Substantial Holding”
•
22/02/2021, “More positive metallurgical results from McDermitt”
25
Appendix 1: Peer Comparison Data
Comparable North American Sediment Hosted Lithium Deposits
Resource
(Mt)
Grade
(ppm Li)
Contained
LCE (Mt)
Measured, Indicated &
Inferred
1,754
2036
19.0
Company website – announcement
31 January 2023
DFS Complete
Measured, Indicated &
Inferred
360
1750
3.4
Company website – announcement
26 April 2023
Ganfeng
PFS Complete
Measured, Indicated &
Inferred
559
2962
8.8
Bacanora Lithium website –
announcement January 2018
McDermitt
ASX:JRL
Preliminary
Scoping Study
Indicated & Inferred
3,000
1340
21.5
Company website –
announcement February 2023
Clayton Valley
TSX:CYP
PFS Complete
Measured, Indicated &
Inferred
1,030
1055
5.8
Company website – announcement
August 2020
Tonopah
TSX:LI
PEA underway
Measured, Indicated &
Inferred
593
1247
3.9
Company website – presentation
October 2022
Big Sandy
ASX:AZL
Scoping Study
Indicated & Inferred
33
1850
0.3
Company website – presentation
November 2022
Deposit
Owner
Stage
Resource Category
Thacker Pass
TSX:LAC
PFS Complete
Rhyolite Ridge
ASX:INR
Sonora
Note 1:
Note 2:
Source
Data provided for lithium focused peers with sediment hosted deposits in North America
The Company is not aware of any new information or data that materially affects the information contained in the above sources or the data contained in this Presentation
26
For further information please contact:
Lindsay Dudfield
Executive Director and CEO
Email: enquiry@jindalee.net
Phone: +61 8 9321 7550
Share your feedback
Discover