US LITHIUM
McDermitt Lithium Project (Jindalee 100%)
Jindalee Lithium Limited’s (Jindalee, or the Company; ASX: JLL, OTCQX: JNDAF) 100% owned McDermitt
Lithium Project (McDermitt or the Project) is located approximately 35km west of the town of McDermitt,
straddling the Oregon and Nevada border in the United States of America (US).
In mid-November 2024 Jindalee announced the results of a Pre-Feasibility Study (PFS) on the McDermitt
Project, one of the largest lithium deposits in the US and of global significance1. The PFS confirmed a 63 year
life with the Project producing 1.8Mt Lithium Carbonate at C1 costs of US$8,670/t for the first 40 years, with
a 5 year payback. The PFS also noted excellent potential to reduce capital and operating costs through
process optimisation and potential production of by-products (including magnesium) at McDermitt.
Permitting and Community Engagement
The Exploration Plan of Operations (EPO) for McDermitt was approved by the US Bureau of Land
Management (BLM) during the period2. The EPO was originally submitted to the BLM in August 2022 and
deemed complete in May 20233, before completing the environmental review process required under the
National Environmental Policy Act (NEPA). This followed publishing of the Draft Environmental Assessment
(EA) for public review on 24 March 2025 and closing of the public comment period on 25 April 20254. The
BLM then prepared responses to comments and finalised the EA in consultation with relevant agencies, with
the Decision Record issued 8 December 2025. Jindalee thanks all parties for their contributions to the
completion of this major milestone for the Project.
Approval of the EPO by the BLM will allow Jindalee to significantly increase on-site activity and advance the
McDermitt Project. Proposed activities include infill drilling to provide additional geological and
environmental data, together with fresh samples for geotechnical studies and further metallurgical test work,
with results from this work to feed into the McDermitt Feasibility Study.
Applications for state-level permits were lodged during the period with outcomes expected in 1H 2026 and
drilling to commence soon after, subject to standard administrative matters typical for approvals of this
nature.
JLL
JNDAF
23 January 2026
QUARTERLY ACTIVITIES REPORT
• US Government approves EPO; major infill drilling program to commence 2H 2026
• McDermitt drilling program returns broad lithium intercepts from shallow depths
• Exclusivity period for SPAC transaction to list McDermitt on a US exchange valuing the
Project at US$500M extended for 45 days with marketing to US investors underway
• SPP raises $1.5M (after scale back), following $8M Placement completed late October
2025
• All remaining convertible notes repurchased November 2025; Jindalee now debt-free
Quarterly Activities Report – December 2025
2025 Drilling Program
On 3 December 2025 Jindalee advised that a large diameter core drilling program had been successfully
completed5. The program comprised five PQ3 (8.5cm diameter) core holes to obtain fresh samples for
metallurgical testwork. The drilling also provided valuable geological and geotechnical data on the deposit,
with three of the holes (R94, R95 and R96) collared to twin reverse circulation (RC) holes drilled in 2021 and
20226.
Figure 1 – Plan view of the McDermitt Project with drillhole collars and 2023 Mineral Resource6
Subsequent to the end of the quarter, on 21 January 2026 Jindalee advised that all five holes had returned
strong lithium and magnesium intercepts from shallow depths7, including:
R92: 36.5m @ 1951 ppm Li & 5.23% Mg from 24.5m
R93: 15.5m @ 1456 ppm Li & 5.45% Mg from 3.6m
R94: 66.0m @ 1599 ppm Li & 4.12% Mg from 0.4m
R95: 110.6m @ 1519 ppm Li & 4.80% Mg from 23.0m
R96: 20.1m @ 1514 ppm Li & 5.29% Mg from 0.4m
Assays from the core drilling showed good correlation with the historic RC results and the Company will
undertake detailed geostatistical analysis to help determine the optimal drilling method for future programs.
Quarterly Activities Report – December 2025
The core samples from the 2025 drilling will form the basis for metallurgical testwork designed to further
optimise lithium recoveries, as well as unlock value from the significant magnesium endowment at
McDermitt, via the value optimisation program announced late October 20258.
Magnesium – a Strategic Value Creation Opportunity at McDermitt
On 22 October 2025 Jindalee announced that it had initiated a value optimisation program focused on
unlocking the significant magnesium (Mg) endowment at McDermitt. Magnesium, which was previously
treated as waste in the PFS, offers a material value creation opportunity with potential to reposition
McDermitt as a dual-product project, supplying both lithium and magnesium to the US.
Magnesium’s strength, light weight and durability make it critical for defence, aerospace and automotive
industries. With China controlling ~90% of global supply, the US faces significant vulnerability in securing
reliable access9. Magnesium metal is ranked in the highest risk category of the 84 mineral commodities
assessed in the US Geological Survey’s 2025 draft list of Critical Minerals10 and is included on the Critical
Materials List published by the US Department of Energy11 (Figure 2). Compounding this risk, US Magnesium
LLC12, previously the only domestic producer of primary magnesium, ceased operations in 202213 and filed
for Chapter 11 bankruptcy protection in September 202514, leaving the US supply chain increasingly exposed
to disruption.
Figure 2 – US Department of Energy Medium-term (2025-2035) Criticality Matrix14
Metallurgical testwork completed for the PFS confirmed that both lithium and magnesium can be efficiently
extracted using sulphuric acid leaching, with recoveries of up to 97% Mg recorded from leaching of
beneficiated samples1.
As part of the review, Jindalee will assess downstream processing opportunities to produce alternative
higher-value magnesium products. This includes evaluating alternate flowsheet configurations that could
enable the production of magnesium compounds suitable as precursors for primary magnesium metal. If
viable, these pathways would position McDermitt to contribute meaningfully to US domestic magnesium
Quarterly Activities Report – December 2025
supply—alongside battery-grade lithium carbonate—at a time when both minerals are classified as critical
by the US Government10,11.
During the previous quarter Jindalee shipped 100kg of McDermitt ore to LiChem Operations, LLC (LiChem)
to assist with the advancement of LiChem’s patented refining process intended to produce battery-grade
lithium from fine grained sedimentary feeds15. Jindalee believes that the LiChem process has the potential
to replace the sulphuric acid flowsheet contemplated in the McDermitt PFS1 and may also have the potential
to recover valuable by-products, including magnesium.
In January 2026 approximately 100kg of leachate from McDermitt was shipped to Kemetco Research Inc in
Canada for further testwork focussed on magnesium, with initial results expected later in Q1 2026.
US Government Support
The potential for China to disrupt critical mineral supplies (including lithium) to impact Western economies
was highlighted on 9 October 2025 when China's Ministry of Commerce (MOFCOM) and the General
Administration of Customs issued an announcement introducing export controls on specific lithium battery
and graphite anode material items16, and on 6 January 2026 when MOFCOM announced sweeping
restrictions on the export of rare earth elements and other sensitive technologies to Japan17.
On 12 November 2025 the bipartisan US House Select Committee on China released a report18 concluding
that for decades China has sought to manipulate global critical minerals prices, specifically lithium and rare
earths, using its control as an economic weapon to expand its manufacturing sector and its geopolitical
influence. The report recommended several policy initiatives including:
• Aligning critical mineral financing and industrial-base programs under a single coordinating
authority, such as a “Critical Minerals Czar.”
• Bolstering US mining and recovery efforts and discussing how to expedite permitting timelines while
maintaining important safeguards.
• Preventing unfairly priced imports from undermining American industries by exploring temporary
minimum price levels.
• Developing federal-level tools for price discovery and production cost benchmarking.
• Establishing a Strategic Resources Reserve that would enable private market-makers and serve as a
federal counterparty for offtake contracts.
• Strengthening coordination among allies on critical minerals and mineral recovery and recycling
efforts.
• Supporting domestic magnet manufacturing and innovation.
• Creating a critical minerals tax credit and supporting low-cost loans for critical minerals projects.
• Developing an American rare earths workforce, including by creating a National Center for Rare
Earths excellence.
Subsequent to the end of the quarter, on 14 January 2026, President Trump issued a Proclamation19 directing
the US Government to negotiate agreements with trading partners to secure reliable supplies of processed
critical minerals and reduce US dependence on foreign processing. The Proclamation cites significant
national security risks stemming from heavy US reliance on imported critical minerals and processing
capacity, and outlines potential future actions, including minimum import price mechanisms or tariff
measures, should negotiations fail to deliver adequate supply chain security.
These measures are directly relevant to large, strategic US resources such as McDermitt, as they reinforce
the US Government’s framing of critical minerals as a national security priority, with policy tools aimed at
improving market conditions to support investment in domestic projects and accelerating secure domestic
US and allied supply chains.
Quarterly Activities Report – December 2025
As one of the largest lithium resources in the US, and located on federal lands, McDermitt is well positioned
to benefit from these US Government initiatives. A Cooperative Research and Development Agreement
(CRADA)20 was signed with the Department of Energy’s (DoE) Office of Energy Efficiency and Renewable
Energy in September 2024 and in April 2025 McDermitt was one of the first ten resource projects designated
a Transparency Project under the US Federal Government’s Fixing America’s Surface Transportation Act
(FAST-41) initiative21.
These developments recognise McDermitt’s strategic importance to America’s security and the Company is
actively engaged with the US Government to source funding to co-fund a Feasibility Study and associated
drilling and test work at the Project.
Clayton North Project (Jindalee 100%)
Jindalee’s 100% owned Clayton North Project is located in southwest Nevada, approximately 23km north of
Albermarle’s (NYSE: ALB) Silver Peak brine operation, which is currently the only domestic source of lithium
in the US.
“Proof of concept” drilling undertaken by Jindalee in 2021 returned anomalous lithium results from fine
grained sediments intersected in hole CNDD01222 including:
• 6.1m @ 1093 ppm Li from 24.4m (including 3.05m @ 1205 ppm Li from 27.4m), and
• 11.2m @ 1006 ppm Li from 33.6m.
Jindalee is considering follow-up drilling at Clayton North to investigate these encouraging initial results.
INDUSTRY DEVELOPMENTS
Battery-grade lithium carbonate prices strengthened materially during the quarter, rising to approximately
US$14,850/t23 by 30 December 2025, representing an increase of around 75% from the June 2025 low of
~US$8,500/t24. Price momentum continued into early 2026, with lithium carbonate prices reaching
approximately US$23,566/t on 22 January 202625, reflecting a sustained recovery in market conditions.
On the demand side, analysis from Benchmark Minerals Intelligence (Benchmark) indicates that global
lithium-ion battery demand increased by approximately 29% in 2025 to around 1.59 TWh26. Demand growth
continued to be led by the electric vehicle (EV) sector, which expanded by approximately 26%26 year-on-
year, reflecting ongoing global EV adoption despite moderating growth rates.
The fastest-growing segment of the lithium-ion battery market in 2025 was battery energy storage systems
(BESS)26. BESS demand increased by approximately 51%26 during the year, with installations reaching an
estimated 315 GWh27, and now represents approximately 19%27 of total lithium-ion battery demand, up from
around 3%28 in 2018. Benchmark expects BESS demand growth to remain robust, with forecast demand of
approximately 450 GWh in 202627, and longer-term demand projected to increase by approximately seven-
fold between 2025 and 204028.
AUSTRALIA
Sherlock (Jindalee 20%)
The Sherlock Project comprises one Exploration Licence (E47/4345) centred approximately 75km east of
Karratha in Western Australia. The Project is a joint venture with Sabre Resources (ASX: SBR) (Sabre), with
Jindalee’s 20% interest free carried to completion of a Bankable Feasibility Study.
E47/4345 surrounds M47/567 which is owned by Sabre and contains the Sherlock Bay nickel-copper-cobalt
mineral resource (24.6Mt @ 0.40% Ni, 0.09% Cu & 0.02% Co)29. The Sherlock Bay deposit is located on the
Scholl Shear Zone (SSZ) which extends onto E47/4345 with the JV exploring for repetitions of the Sherlock
Bay mineralisation along the SSZ. No work was reported by Sabre during the period.
Quarterly Activities Report – December 2025
CORPORATE
Proposed SPAC Transaction
On 9 September 2025 Jindalee announced that it had signed a non-binding Letter of Intent (LOI) with
Constellation Acquisition Corp. I (Constellation) (OTCPK: CSTAF), a US special purpose acquisition company
(SPAC) sponsored by an affiliate of Antarctica Capital, LLC (Antarctica), to merge Constellation with
Jindalee’s wholly owned US subsidiary, HiTech Minerals Inc. (HiTech) to form a combined entity to be named
US Elemental (US Elemental) (Transaction)30. Antarctica is a US Securities and Exchange Commission
registered investor advisor and alternative asset management firm. Antarctica and its affiliated investment
advisors had in excess of US$8 billion of assets under management as of 31 December 2024.
The negotiated terms of the LOI contemplate that Jindalee will receive 50 million new shares in US Elemental
initially valued at US$10 per share in consideration for the Transaction, equating to an equity value of
US$500M (subject to customary debt adjustments). The Transaction also contemplates a capital raise of
US$20-30M or more, with affiliates of Antarctica to commit US$4M. Upon close, US Elemental is expected to
list on a US national securities exchange, with Jindalee expected to retain more than 80% ownership (subject
to finalising the terms of the Transaction, including the capital raise). Figure 3 outlines the illustrative change
in the Company’s corporate structure in the event the Transaction completes.
The proposed Transaction represents a significant opportunity and, if completed, is expected to:
• Create a US-listed vehicle with direct exposure to the McDermitt Project, one of the largest lithium
resources in the US.
• Provide significant funding to materially advance the McDermitt Feasibility Study.
• Better position the McDermitt Project to capitalise on strong US government support for domestic
critical minerals supply.
• Provide long-term access to and enhanced visibility across US capital markets for future development
capital requirements.
• Provide ongoing exposure to the McDermitt Project for Jindalee shareholders through majority
shareholding of US Elemental, with majority Jindalee representation on US Elemental’s Board and senior
management.
Quarterly Activities Report – December 2025
Figure 3 – Illustrative Change to Corporate Structure
Investors should note that at this non-binding LOI stage there are risks that the Transaction may not
complete, and that, if completed, US Elemental’s shares may not trade at the equity valuation implied by the
Transaction. Additionally, the establishment and structure of US Elemental remains subject to the
Transaction and its definitive agreements, and there is no guarantee that US Elemental will be formed (as
opposed to Constellation).
The LOI included an initial exclusivity period of 90 days for Jindalee and Constellation to undertake mutual
due diligence and negotiate transaction documents, prior to execution of a binding Business Combination
Agreement (BCA). Work on the BCA has made substantial progress and on 3 December 2025 Jindalee
announced that it had agreed with Constellation to extend the initial 90-day exclusivity period under the LOI
by a further 45 days5. A further extension of 30 days was agreed with Constellation on 23 January 2026.
These extensions reflect the progress made to date and the shared intent to finalise a BCA that provides a
clear pathway to completing the proposed transaction.
Marketing of US Elemental to selected US investors commenced late December 202531.
Capital Raising and Equity Letter of Credit
On 20 October 2025 Jindalee announced that it had raised approximately $8M (before costs) through the
issue of fully paid ordinary shares (Shares) in the Company at an issue price of $0.55 per Share via a private
placement to Australian and international investors (Placement)32. Participants in the Placement also
received one (1) option to acquire one (1) Share each for every one (1) Share issued under the Placement for
nil additional consideration, with an exercise price of $0.825 and an expiry date of 30 November 2028
(Attaching Options), which were subsequently quoted on the ASX. Issue of the Placement Shares and
Attaching Options, together with participation in the Placement by Jindalee Directors, were approved by
shareholders at the Company’s general meeting held 10 December 202533.
In addition to the Placement, the Company offered eligible shareholders the opportunity to apply for up to
$30,000 worth of new Shares pursuant to a Share Purchase Plan (SPP), at the same issue price as the
Quarterly Activities Report – December 2025
Placement, targeting to raise up to $1M34. Eligible shareholders who applied for and were issued Shares
under the SPP were also eligible to subscribe for one (1) Attaching Option for every one (1) Share issued
pursuant to the SPP on the same terms as the Placement. The SPP offer closed oversubscribed on 20
November 2025, with the Jindalee Board agreeing to accept oversubscriptions resulting in total proceeds of
$1.5M, with applications for amounts greater than $5,000 scaled back on a pro-rata basis35.
Early November 2025 Jindalee advised that it had repurchased the balance of the convertible securities held
by Mercer Street Global Opportunity Fund II. LP and other funds managed by US-based C/M Capital Partners
LP (together Mercer)36. Mercer’s investment in Jindalee enabled completion of the McDermitt PFS which
confirmed the Project as a large scale, long-life source of lithium of strategic importance to the US and the
Company appreciates Mercer’s support. As a result of the repurchase, there are no remaining convertible
securities on issue and Jindalee is debt-free.
In parallel with the Placement, the Company advised that it had entered into a non-binding term sheet with
L1 Capital Global Opportunities Master Fund (L1) which contemplates L1 providing an equity line of Credit
(ELOC) of up to US$100M32, which will be conditional upon completion of the proposed merger and listing of
Constellation or another SPAC or public issuer affiliated with the Company on a US national securities
exchange. The proposed ELOC to be entered into with the SPAC remains subject to L1 satisfying itself with
its due diligence and the negotiation and execution of binding documentation.
Appointment of Tristan Garthe as Joint Company Secretary
On 15 December 2025 Jindalee announced that Tristan Garthe will jointly assume the responsibilities of the
Company Secretary role for Jindalee, along with Carly Terzanidis who will continue in the role37. Tristan
joined Jindalee in October 2025 as the Company’s Chief Financial Officer.
Capital Structure
Jindalee currently has approximately 102.2M shares on issue, with cash and listed securities at 31 December
2025, after repurchase of the balance of the remaining convertible securities, of approximately $6.5M38.
During the quarter, 2.9M new shares were issued on the conversion of convertible notes, and holders
exercised 2.0M unlisted options. In connection with the capital raise, the Company issued 14.9M Placement
shares and 2.7M SPP shares. In addition, 19.1M of Placement & SPP listed attaching options (code JLLO,
$0.825, expiring 30 Nov 2028) were created. The Company also issued approximately 0.7M performance
rights to employees and the Managing Director (as approved by shareholders).
FINANCIAL COMMENTARY
The Quarterly Cashflow Report for the period ending 31 December 2025 provides an overview of the
Company’s financial activities38.
Exploration and evaluation expenditure for the reporting period was $2,432k and was dominated by drilling
program expenditure at McDermitt. Net corporate expenditure was $1,457k. The total amount paid to
directors of the entity and their associates in the period was $209k and includes directors’ fees, consulting
fees and superannuation.
Authorised for release by the Jindalee Board of Directors.
For further information please contact:
IAN RODGER LINDSAY DUDFIELD
Managing Director & Chief Executive Officer Executive Director
T: + 61 8 9321 7550 T: + 61 8 9321 7550
E: enquiry@jindaleelithium.com E: enquiry@jindaleelithium.com
Quarterly Activities Report – December 2025
ADDITIONAL INFORMATION
Additional details including JORC 2012 reporting tables, where applicable, can be found in the ASX announcements
referenced in this report and announcements lodged with the ASX during the quarter:
References
1. Jindalee Lithium ASX announcement 19/11/2024: “McDermitt Lithium Project Pre-Feasibility Study”
2. Jindalee Lithium ASX announcement 11/12/2025: “US Government Approves Major Drilling Program at McDermitt”
3. Jindalee Lithium ASX announcement 16/05/2023: “McDermitt Progress Update”
4. Jindalee Lithium ASX announcement 01/04/2025: “Corporate Update”
5. Jindalee Lithium ASX announcement 03/12/2025: “McDermitt Drilling and US Listing Update”
6. Jindalee Lithium ASX announcement 27/02/2023: “Resource at McDermitt increases to 21.5 Mt LCE”
7. Jindalee Lithium ASX announcement 21/01/2026: “Excellent Results from 2025 Core Drilling Program at McDermitt”
8. Jindalee Lithium ASX announcement 22/10/2025: “JLL to Explore High Value Magnesium By-Product at McDermitt”
9. https https://www.semafor.com/article/11/17/2024/china-expands-export-controls-on-critical-minerals
10. https://pubs.usgs.gov/of/2025/1047/ofr20251047.pdf
11. https://www.energy.gov/cmm/what-are-critical-materials-and-critical-minerals
12. https://usmagnesium.com/
13. https://projectblue.com/blue/news-analysis/1078/us-magnesium-to-idle-operations
14. https://www.fox13now.com/news/local-news/northern-utah/us-magnesium-files-for-chapter-11-bankruptcy-as-utah-seeks-
to-shutter-operations
15. Jindalee Lithium ASX announcement 10/07/2025: “Jindalee Enters into MoU with LiChem”
16. China announces export controls on lithium batteries, graphite anode materials - Global Times
17. China Cuts Rare Earth Exports to Japan After Taiwan Remarks, Escalating Supply-Chain Tensions
18. china-interim-report-on-price-manipulation-w.toc-compressed.pdf
19. Adjusting Imports of Processed Critical Minerals and Their Derivative Products into the United States – The White House
20. Jindalee Lithium ASX announcement 16/09/2024: “Jindalee Secures Strategic Agreement with US Department of Energy”
21. Jindalee Lithium ASX announcement 22/04/2025: “McDermitt Project Fast-Tracked Under U.S. FAST-41 Initiative”
22. Jindalee Lithium ASX announcement 18/11/2021: “Drilling confirms Lithium at Clayton North”
23. Lithium carbonate min 99.5% cif China prices | Lithium Prices, charts, and News – Argus Metals
24. China's lithium prices rebound on supply reductions | 27 June 2025 | Argus Metals
25. https://www.metal.com/Chemical-Compound/201102250059 (Viewed 22 January 2026)
26. https://source.benchmarkminerals.com/article/global-lithium-ion-battery-demand-rose-29-in-2025
27. https://www.ess-news.com/2026/01/20/global-bess-demand-jumps-51-in-2025-as-installations-top-300-gwh/
28. https://source.benchmarkminerals.com/article/battery-demand-to-reach-1-6-twh-in-2025-as-benchmark-week-comes-to-a-
close-in-la
29. Sabre Resources ASX announcement 12/06/2018: “Resource Estimate Update for the Sherlock Bay Nickel-Copper-Cobalt
Deposit
30. Jindalee Lithium ASX announcement 09/09/2025: “JLL Signs Non-Binding LOI to List McDermitt on a US Exchange”
31. Jindalee Lithium ASX announcement 18/12/2025: “US Listing Update”
32. Jindalee Lithium ASX announcement 20/10/2025: “Successful $8M Placement & SPP to Advance McDermitt & SPAC”
33. Jindalee Lithium ASX announcement 10/12/2025: “Results of Meeting”
34. Jindalee Lithium ASX announcement 23/10/2025: “Despatch of SPP Offer Documents”
35. Jindalee Lithium ASX announcement 27/11/2025: “Oversubscribed Share Purchase Plan Raises $1.5 Million”
36. Jindalee Lithium ASX announcement 04/11/2025: “Repurchase of Convertible Securities”
37. Jindalee Lithium ASX announcement 15/12/2025: “Appointment of Joint Company Secretary”
38. Jindalee Lithium ASX announcement 23/01/2026: “Quarterly Cashflow Report – December 2025”
Competent Persons Statement
The Company confirms that it is not aware of any further new information or data that materially affects the information
included in the original market announcements by JLL listed above, and in the case of estimates of Mineral Resources,
production targets, Ore Reserves and forecast financial information, that all material assumptions and technical
parameters underpinning the estimates in the relevant market announcements continue to apply and have not
materially changed. To the extent disclosed above, the Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market announcements.
Forward-Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include but are not
limited to statements concerning Jindalee’s current expectations, estimates and projections about the industry in which
Jindalee operates, and beliefs and assumptions regarding Jindalee’s future performance. When used in this document,
the words such as “anticipate”, “could”, “plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”, “should”, and
similar expressions are forward-looking statements. Although Jindalee believes that its expectations reflected in these
forward-looking statements are reasonable, such statements are subject to known and unknown risks, uncertainties and
Quarterly Activities Report – December 2025
other factors, some of which are beyond the control of Jindalee and no assurance can be given that actual results will be
consistent with these forward-looking statements.
Such factors may include, among others, risks related to regulatory approvals of or in connection with the proposed
transaction, actual results of current or planned exploration activities, change in market conditions which affect the
completion of the transaction, obtaining appropriate approvals to undertake exploration activities in the portfolio of
projects, changes in exploration programs and budgets based upon the results of exploration, future prices of minerals
resources; grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining
government approvals or financing or in the completion of development or construction activities; movements in the
share price of investments and the timing and proceeds realised on future disposals of investments, as well as those
factors detailed from time to time in the Company’s interim and annual financial statements and reports, all over which
are available for review on ASX at asx.com.au and OTC Markets at otcmarkets.com.
Although the Company has attempted to identify important factors that could cause actual actions, events or results to
differ materially from those described in forward-looking statements will prove to be accurate, as actual results and
future events could differ materially from those anticipated in such statements. Accordingly, readers should not place
undue reliance on forward-looking statements.
Quarterly Activities Report – December 2025
TENEMENT INFORMATION IN ACCORDANCE WITH LISTING RULE 5.3.3
As at 31 December 2025
* Tenements held by Jindalee’s wholly owned US subsidiary, HiTech Minerals Inc.
Project Tenement ID Location Status
Interest at
beginning of
Quarter
Interest at end
of Quarter
McDermitt*
HTM 16-20, 24-35, 39-55, 59-77,
81-101, 105-125, 130-149, 152-
172, 176-195, 199-213, 217-225,
231-235, 238-242, 258-260, 340-
342, 348, 349, 355, 356, 362, 363,
369, 376-380, 387-391, 398, 399,
420-445, 448-456, 460-469, 480-
493, 496, 497, 500-517, 532-585,
685-687. HTX 1-113, 116-442.
Oregon, USA Granted 100% 100%
HTM 586-682. Nevada, USA
Clayton North* HTC 1-6, 12-18, 25-28. Nevada, USA Granted 100% 100%
Sherlock E47/4345
Western
Australia
Granted 20% 20%