Corporate Presentation
Released
Released
Announcement PDF
MARCH 2024
REALISING AMERICA’S
LARGEST LITHIUM
RESOURCE
Ian Rodger
Chief Executive Officer
INVESTOR
PRESENTATION
ASX:JLL
OTCQX:JNDAF
Jindaleelithium.com
Disclaimer
This Presentation has been prepared by Jindalee Lithium Limited (“Jindalee”, “Company” or “JLL”) and is authorised for release by its Chief Executive Officer, Mr Ian Rodger. Certain
information in this presentation has been derived from third parties and though Jindalee has no reason to believe that it is not accurate, reliable or complete, it has not been
independently audited or verified by Jindalee. Except to the extent required by law, Jindalee makes no representations or warranty as to the accuracy, reliability or completeness of
information in this document and does not take responsibility for updating any information or correcting any errors or omissions which may become apparent after this presentation is
released.
This presentation is for information purposes only. It is not a prospectus, product disclosure statement or other disclosure document under Australian law or any other law (and will not
be lodged with the Australian Securities and Investments Commission or any foreign regulator) and is not, and does not constitute, an invitation or offer of securities for subscription,
purchase or sale in any jurisdiction. In particular, this presentation does not constitute an invitation or offer of securities for subscription, purchase or sale in the United States or any
other jurisdiction in which such an offer would be illegal. The securities referred to in this presentation have not been and will not be registered under the U.S. Securities Act of 1993 as
amended or the securities laws of any state or other jurisdiction of the United States and may not be offered or sole, directly or indirectly in the United States.
This presentation may contain certain forward-looking statements. Forward-looking statements include but are not limited to statements concerning Jindalee’s current expectations,
estimates and projections about the industry in which Jindalee operates, and beliefs and assumptions regarding Jindalee’s future performance. When used in this document, the words
such as “anticipate”, “could”, “plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”, “should”, and similar expressions are forward-looking statements. Although Jindalee
believes that its expectations reflected in these forward-looking statements are reasonable, such statements are subject to known and unknown risks, uncertainties and other factors,
some of which are beyond the control of Jindalee and no assurance can be given that actual results will be consistent with these forward-looking statements.
Such factors may include, among others, risks related to results of current or planned exploration activities, changes in market conditions, obtaining appropriate approvals to undertake
exploration activities in the portfolio of projects, changes in exploration programs and budgets based upon the results of exploration, future prices of minerals resources; grade or
recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining government approvals or financing or in the completion of development or
construction activities; movements in the share price of investments and the timing and proceeds realised on future disposals of investments, force majeure events, as well as those
factors detailed from time to time in the Company’s interim and annual financial statements and reports, all over which are available for review on ASX at asx.com.au and OTC Markets
at otcmarkets.com.
Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking
statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue
reliance on forward-looking statements. To the extent permitted by law, Jindalee and its officers, employees, related bodies corporate and agents disclaim all liability, direct, indirect or
consequential (and whether or not arising out of the negligence, default, or lack of care of Jindalee and/or any of its agents) for any loss or damage suffered by a recipient or other
persons out of, or in connection with, any use or reliance on this presentation or information. This presentation does not constitute investment advice and has been prepared without
taking into account any investor's particular investment objectives, financial circumstances or particular needs and the opinions and recommendations in this presentations are not
intended to represent recommendations of particular investments to particular persons. You should seek professional advice when deciding if an investment is appropriate. All
securities transactions involve risks, which include (among others) the risk of adverse or unanticipated market, financial or political developments.
All amounts are in A$ unless stated otherwise.
Company Overview
Share Price (ASX:JLL, OTCQX:JNDAF)
Corporate Snapshot
Share Capital (ASX:JRL, OTCQX:JNDAF)
60.5m
A$/share
Share Price 1
A$0.78
4.50
9.4m
3.50
Unlisted Options (from 40c to $5.00) 1
5.00
4.00
3.00
Market Capitalisation 1
A$46.9m
2.50
Cash 2
A$3.3m
1.50
Investments 3
A$3.3m
0.50
Debt
Enterprise Value
A$0.78
22/03/2024
2.00
1.00
-
Nil
A$40.3m
Major Shareholders
1. Share price as at 22/03/2024
2. Cash on hand as at 31/12/2023
3. Share investments as at 31/12/2023 – ASX:DYM, ASX:EME
3
L G Dudfield
24.6%
Kale Capital Corporation Pty Ltd
6.9%
Elmix Pty Ltd
3.5%
Kevrex Pty Ltd
3.5%
Board and Management team with proven success in
creating value for shareholders
d
d
Wayne Zekulich
Lindsay Dudfield
Ian Rodger
Brett Marsh
Darren Wates
Paul Brown
Non-Executive Chair
Executive Director
Chief Executive Officer
VP Exploration & Development
Non-Executive Director
Non-Executive Director
Mr Wayne Zekulich was
appointed to the Jindalee
Board as Chair on 1
February 2024. Wayne is
a Consultant and NonExecutive Director who
has substantial
experience in advising,
structuring and financing
transactions in the
infrastructure and
resources sectors. Wayne
is currently Chair of ASX
listed gold miner Pantoro
Ltd (ASX:PNR).
Mr Lindsay Dudfield is a
geologist with over 40
years’ experience in multicommodity exploration.
Lindsay has been
responsible for managing
Jindalee since inception,
guiding the Company
through the advancement
of several projects across
various commodities and
jurisdictions. He is also a
Non-Executive Director of
several ASX listed mineral
exploration companies.
Mr Ian Rodger is the
newly appointed CEO of
Jindalee. Ian is an
internationally
experienced mining
executive, with
experience as a mining
engineer working across
two large greenfield mine
developments with Rio
Tinto. He also has a broad
range of corporate
finance and commercial
experience, holding
senior roles at RFC
Ambrian, BHP and Oz
Minerals Ltd (ASX:OZL).
Mr Brett Marsh is a
Geologist with over 25
years of experience. He
has managed all phases
of the mining lifecycle
including greenfield and
brownfield exploration,
project development
(including preliminary
economic assessments,
pre-feasibility and
feasibility), project
construction, mine
operations, and
environmental.
Mr Darren Wates is a
corporate lawyer with
extensive experience in
equity capital markets,
M&A, resources, project
acquisitions / divestments
and corporate. Darren
was significantly involved
in the development, joint
venture partnering and
eventual sale of the Mt
Marion Lithium Project in
roles with ASX listed
company Neometals Ltd
(ASX:NMT).
Mr Paul Brown has over
23 years’ experience in
the mining industry, most
recently with Mineral
Resources (ASX:MIN)
where he was Chief
Executive – Lithium. He
has a strong track record
in project/studies
management and mine
planning and
management. Paul is
currently Chief Executive
Officer of Hastings
Technology Metals Ltd
(ASX:HAS).
4
Key Investment Highlights
Pure play US lithium company focused on progressing the globally significant McDermitt Lithium Project
Largest Lithium Resource in the USA (21.5Mt LCE1)
Li
Emerging top tier, generational asset, mirroring the scale and style of Thacker Pass project,
currently under construction by Lithium Americas (TSX: LAC – Market Cap ~US$1.1B2, General
Motors offtaker and largest shareholder, with DoE construction loan of US$2.3B3).
Highly attractive potential source of lithium carbonate for US EV supply chain
Strategically located, shallow ore body, established flow sheet, with MoU4 with POSCO Holdings, a
major supplier and partner to General Motors in North America.
McDermitt poised to meet medium-term Lithium supply deficit
Lithium investment thesis remains robust. McDermitt likely well timed to come to market as EV
transition drives expected supply deficit later in the decade.
Strong Government Support
Eligible for a range of US government incentives such as the Biden Administration's US$369B
Inflation Reduction Act (IRA). Advisors appointed to target near term grant funding.
Pivotal year ahead
Several major value catalysts expected in 2024 including; PFS completion, Lithium Carbonate
production from test-work, and ongoing engagement with US agencies and strategic partners.
5
1.
2.
3.
4.
Refer to JLL ASX release 27/02/2023 “Resource at McDermitt increases to 21.5 Mt LCE”
Based on market close 22 March 2024, share price US$6.85/s and 161.2 million shares outstanding
Refer to Lithium Americas announcement 14 March 2024 link
Refer to JLL ASX release 13/02/2023 “MOU Executed with POSCO Holdings”
Pivotal year ahead for Jindalee
De-risking is ongoing, with several major value catalysts expected in 2024
STRENGTHEN
TEAM
TECHNICAL
DE-RISKING
PREPARATION FOR
NEXT PHASE
New Chair1 and CEO2
Mineral Beneficiation
test-work
Baseline studies
Key appointments to
support transition to
developer
Production of Lithium
Carbonate
Mid-year
DEFINE VALUE
POTENTIAL OF
MCDERMITT
PFS Completion
Mid-year3
6
1.
2.
3.
Finalisation of
Exploration Plan of
Operations
Leach test-work
Refer to JLL ASX release 27/12/2023 “Chair Transition”
Refer to JLL ASX release 4/12/2023 “Appointment of Ian Rodger as CEO”
Based on current scope. Excludes any trade-offs opportunities outlined on slide 11
GOVERNMENT
SUPPORT
Engagement with US
Agencies with regards to
technical cooperation
and funding
PARTNERSHIPS
Progress work under
POSCO MoU
Engage with potential
partners post PFS
Largest Lithium Resource in the USA
Jindalee trades at an attractive valuation relative to peers
McDermitt compares favourably to
Sediment Hosted Peers3
Enterprise Value (US$)1 / Contained LCE2 in Resources (t)
62
Resource (Mt)
44
3,500
Bubble size is contained LCE2 Mt
3,000
McDermitt
21.5
8
Jindalee
Lithium
Arizona
Lithium
Century
Lithium
American
Lithium
Lithium
Americas
ioneer
Project/s
McDermitt
Big Sandy +
Prairie4
Clayton
Valley
TLC +
Falchani5
Thacker
Pass
Rhyolite
Ridge
Stage3
PFS
Underway
Scoping
PFS
PFS
PEA
PEA
Construction
DFS
28
43
59
133
836
208
Series 1
2,000
19.1
Thacker Pass
1,500
Clayton Valley
1,000
Rhyolite Ridge
0
0
Enterprise
Value (US$M)1
1
8.8
TLC 3.5
500
7
Sonora
7.2
11
6
2,500
3.4
Big Sandy
500 1,000 1,500 2,000 2,500 3,000 3,500
Resource Li Grade (ppm)
1.
2.
3.
4.
5.
Sourced from FactSet 22/03/2024
LCE = Lithium Carbonate Equivalent. Data source: various company reports
Source: various company reports. Refer Appendix 1 for detailed information
Arizona Lithium holds two development project: a) Big Sandy Sediment Hosted project, and b) Prairie Brine Direct Lithium Extraction project
American Lithium holds two lithium development projects: a) Tonopah (TLC) Sediment hosted project, and b) Falchini hard rock deposit. Metrics do not include Macusani Uranium deposit
McDermitt strategically situated amidst the expansion of
the US battery supply chain
Ownership
100% owned by Jindalee
Location
• Located in Malheur County - on the
Oregon-Nevada border, ~35km west of the
town of McDermitt
• Located in same geological formation
(McDermitt Caldera) as Lithium Americas’
Thacker Pass Project (19.1Mt LCE¹) which
is under construction
History/Status
• 2018: Initial discovery drill program
• 2023: McDermitt becomes largest Lithium
deposit in USA. MoU with POSCO Holdings
announced4
• PFS due mid 2024
Tenure and
Resource
• 54.6km2 claims area
Features
• Flat lying sediments with low strip ratio
• 3.0Bt @ 1,340ppm for 21.5Mt LCE3
• Ore is soft, amenable to low cost mining
and crushing
• Excellent metallurgical recoveries2
1.
8
2.
3.
4.
Refer to Lithium Americas TSX announcement 02/03/2023 “Lithium Americas to Develop US Sourced Lithium Production through $650 Million
Equity Investment and Supply Agreement”
Refer to JLL ASX release 18/01/2024 “More Exceptional Metallurgical Results From McDermitt”
Refer to JLL ASX release 27/02/2023 “Resource at McDermitt increases to 21.5 Mt LCE”
https://newsroom.posco.com/en/posco-holdings-cooperates-with-australias-jindalee-resources-limited-for-u-s-mcdermitt-clay-lithium-project/
Source: Federal Reserve Bank of Dallas; Company
announcements, media reports, NAATABATT, North
American Lithium-Ion Supply Chain Database
McDermitt Resource contains enough Lithium for >900 million EVs1
Potential to significantly contribute to the growth of the domestic US EV supply chain
✓ Large shallow flat lying sedimentary deposit, with potential to target higher grade zones
early in mine life to improve returns
✓ Exploration Target confirms excellent potential for further resource growth (300-700Mt @
1,100 - 1,400ppm Li)2
McDermitt Mineral Resource (2023)3
Cut-off
Grade
(ppm Li)
1,000
Indicated Resource
Inferred Resource
Tonnage
(Mt)
Li Grade
(ppm)
LCE
(Mt)
Tonnage
(Mt)
Li Grade
(ppm)
LCE
(Mt)
1,470
1,420
11.1
1,540
1,270
10.4
Indicated and Inferred
Resource
Li
Tonnage
LCE
Grade
(Mt)
(Mt)
(ppm)
3,000
1,340
21.5
Summary of 2023 McDermitt Mineral Resource Estimate at the reporting cut-off of 1,000ppm (totals may vary due to rounding)
Plan view of the 2023 Mineral Resource (at 1523mRL), completed
drilling, Section C-C’ and schematic conceptual Pit Shells 5 and 6
1.
2.
3.
EV = Electric Vehicles. Based on 21.7kg LCE per EV based on average passenger EV sold globally in Q3 2023,. Source Adamas Intelligence – link
Refer to JLL ASX release 21/11/2023 “Exploration Target Highlights Further Upside at McDermitt”
Refer to JLL ASX release 27/02/2023 “Resource at McDermitt increases to 21.5 Mt LCE”
Flowsheet design has leveraged experience of more advanced peers
Similar flowsheet to Thacker Pass validated by LAC1 via extensive pilot plant work and detailed due
diligence by General Motors (largest shareholder) and US DoE (US$2.3B construction loan3)
As received ore
✓ Flowsheet consists of technology and equipment used in different industrial sectors
✓ Beneficiation results and leach recoveries highly encouraging2
✓ Final phase of PFS test work underway to produce Lithium Carbonate, expected mid 2024
Validated by PFS test work
PFS test work in process
Mineral Beneficiation
Process used in phosphate industry
Standard mine processing operations
Clay dewatering
Ore
from
mine
Sizer
Process Plant
10
Attrition
Scrubbing
Process used in hard rock conversion to
produce lithium chemicals
Ion Exchange
Mg & Ca
precipitation
Li2CO3
crystallisation
Drying
1.
2.
3.
Lithium Americas Corporation (TSX: LAC)
Refer to JLL release 30/01/2024, “Quarterly Cashflow & Activity Reports – December 2023”
Refer to Lithium Americas announcement 14 March 2024 link
Screen
Standard chemical process
MgSO4
crystallisation
Thickener
Traditional hydrometallurgy
Neutralisation/CCD
washing/filtration
Battery
grade
Li2CO3
Centrifuge
Acid
Leaching
Neutralisation sighter
test-work
PFS tracking to schedule and budget
Current Status
▪ Leaching of bulk sample in progress (a predecessor to leach recovery test-work and Lithium Carbonate production)
▪ Initial engineering studies continuing
▪ Pit shell optimisation commenced
Trade-off opportunities
▪ Several value enhancing trade-offs identified from test-work which were not included in original scope (see below)
▪ Project team (JLL and Fluor) now prioritizing opportunities and developing workplan to address
Resource Utilisation
Potential to increase Run-of-Mine (ROM) grade in the initial years
to maximise returns
Process Plant
Potential to improve process conditions, such as optimising acid
consumption and extraction temperatures, to enhance
efficiency/reduce cost
11
Beneficiation
Potential to optimise beneficiation stage to further elevate the
leach feed grade, alongside initiatives to decrease material costs
and optimise overall recovery
Project Development
Potential to investigate phased project development and
infrastructure modularisation to lower costs
Lithium investment thesis
remains robust
Implied Lithium inventory in China’s supply chain2
(tonnes LCE)
▪ Short term softness driven by Chinese de-stocking and mismatch in short-term
demand/supply in rapidly growing market
▪ Recent lower prices have meant c.200kt LCE of higher cost supply has been “shut-in”1
▪ Lithium demand expected to grow from 1Mtpa in 2023 to 3.3Mtpa in 2030 (avg. CAGR
~19%)1, driven by EV transition
▪ Therefore, market deficit forecast to emerge over the medium-term, with investment
in new supply required to be incentivised in order meet demand2
McDermitt poised to meet medium-term supply deficit
Inventory Change
Grid
Industrial
EV
3.3
Lithium Demand3
by Application (Mt LCE)
Lithium Supply and Demand4
(Mt LCE)
6
Consumer Electronics
Probable
Highly Probable
Operating & Brownfield
Demand
5
Mobility
2.3
4
Supply gap forecasted
despite dozens of new
projects announced
+28%
3
1.3
1.0
2
1
2040
2039
2038
2037
2036
2035
2034
2033
2032
2031
2030
2029
2028
2027
2026
2025
0
2024
2030E
2023
2027E
2022
2024E
2021
2023
Albemarle Q4 2023 results presentation and video conference
Fast markets 19 January 2024 link
Albemarle analysis from Q4 2023 results presentation
Benchmark Minerals Q2 2023, weighted. Lithium America Feb 2024 Corporate presentation
2020
12
1.
2.
3.
4.
US bi-partisan support to de-risk critical minerals supply chain
Establishing a secure supply of Lithium is a priority for US given current reliance on China, which
produces c.55%1 of global lithium chemical supply and c.75%2 of lithium-ion batteries
World’s largest clay and hard rock lithium
projects. 1. McDermitt Lithium Project.
China Dominates the Global Lithium
Industry. Can the U.S. Ever Catch Up?
America's Military Needs to Detach Critical
Mineral Supply Chains From China
August 10, 2023
October 2, 2023
March 16, 2023
US to Ban Pentagon Battery Purchases From
China’s CATL, BYD
Senator Angus King: “Downright Dangerous,”
King says of U.S. Reliance on China for
Lithium
US is ‘10 to 20 years behind’ China in battery
production
January 20, 2024
Exxon to begin producing lithium to
feed surging battery demand
November 13, 2023
December 12, 2023
The US wants to end its reliance on
Chinese lithium. Its policies are doing the
opposite.
January 23, 2024
November 7, 2023
US lithium production: A vital pillar of national
security and energy independence
December 7, 2023
1.
2.
13
International Energy Agency – World Energy Outlook 2023
International Energy Agency - Global Supply Chains of EV Batteries
Advisors appointed to target near-term grant funding
Recent examples of grant and loan funding
Grants (Pre-Development Phase)
✓ February 2024 – Perpetua Resources awarded an additional US$34.6M1 grant (total
US$59.4M) from DoD (under Defense Production Act Title III authorisations) for
construction readiness and permitting for Stibnite Gold and Antimony Project in Idaho
✓ November 2023 – Talon Metals Corp signs definitive agreement with DoE to provide
US$114.8M2 in grant funding (under Bipartisan Infrastructure Law) to co-fund Battery
Minerals Processing Facility in North Dakota
✓ September 2023 – Talon Metals Corp awarded US$20.6M3 in grant funding from DoD
(under Defense Production Act Title III authorisations) to co-fund Nickel exploration in
Minnesota & Michigan
Loans (Development Phase)
✓ January 2023 – the DOE announced a US$700M conditional loan to the Rhyolite Ridge
Project (3.4Mt LCE4) to finance on-site processing of lithium carbonate5
✓ March 2024 – Lithium Americas received conditional commitment for US$2.3B
construction loan6 from the DOE to fund c.75% of Thacker Pass Project capex
14
▪
▪
Interest: Treasury rates with 0% Spread
Tenor: 24 years
1.
2.
3.
4.
5.
6.
Source: Perpetua news release 12 February 2024 link
Source: Talon Metals news release 2 November 2023 link
Source: Talon Metals news release 12 September 2023 link
Source: ioneer website link
Source: Loan Programs Office news release 13 January 2023 link
Source: Lithium Americas news release 14 March 2024 link
Thank you
Further information:
IAN RODGER
Chief Executive Officer
email: enquiry@jindalee.net
phone: +61 8 9321 7550
15
Supporting Slides
Appendix 1: Peer Comparison Data
Comparable North American Sediment Hosted Lithium Deposits
Deposit
Thacker
Pass
Rhyolite
Ridge
Owner
TSX:LAC
ASX:INR
Stage
Resource Category
FS Complete
Measured, Indicated &
Inferred
DFS Complete
Measured, Indicated &
Inferred
Resource
(Mt)
1,754
360
Grade
(ppm Li)
2036
1750
Cut-off
(ppm Li)
1047
1090/
5000 B*
Contained
LCE (Mt)
Source
19.1
Company website –
Feasibility Study November
2022
3.4
Company website –
announcement 26 April
2023
Measured, Indicated &
Inferred
559
2962
1000
8.8
Bacanora Lithium website –
announcement January
2018
Sonora
Ganfeng
PFS Complete
McDermitt
ASX:JLL
PFS
underway
Indicated & Inferred
3,000
1340
1000
21.5
Company website –
announcement February
2023
Clayton
Valley
TSXV:LCE
PFS Complete
Indicated & Inferred
1,541
882
400
7.2
PFS Report, March 2021
TLC
TSXV:LI
PEA Complete
Measured, Indicated &
Inferred
534
1219
1000
3.5
December 2022 Resource
Estimate
Big Sandy
17
ASX:AZL
Scoping Study
*deposit includes Boron (B) credits
Indicated & Inferred
33
1850
800
0.3
Company website –
presentation November
2022
Jindalee Track Record of Value Creation
Jindalee's mission is to create wealth for shareholders through the discovery of world-class mineral deposits
2002
Jindalee lists
July 2002 after raising $2.65M
via 25c IPO cornerstoned by
Teck (TSX:TECK)
2019
Jindalee raises $1M from
shareholders to fund further
drilling at McDermitt (first raise
since 2002 IPO)
2022
Spin-out of Australian assets as
Dynamic Metals (ASX:DYM)
approved; priority entitlement
to Jindalee shareholders,
Jindalee holds 25%
18
2004
2005
2007
Jindalee acquires uranium
projects in NT and WA
Uranium projects spun-out as
Energy Metals (ASX:EME); priority
entitlement to Jindalee
shareholders, Jindalee holds 40%
Jindalee sells gold projects into
Alchemy Resources IPO
(ASX:ALY) for 22% of ALY; priority
entitlement to Jindalee
shareholders
2018
2010
2009
Jindalee stakes McDermitt Lithium
Project; drills 4 "proof of concept"
holes which confirm size potential
of McDermitt
2023
Resource update (62 holes) confirms
McDermitt now 21.5Mt LCE – the largest
lithium deposit in the US and a company
making project. MoU with POSCO
announced. Detailed Metallurgical testwork
and PFS commences.
Name change to Jindalee Lithium
Jindalee pays shareholders $0.55
dividend (fully franked); retains
$8M cash to continue search for
"company making" project
2024
Exceptional metallurgical
testwork results feed into PFS
(due for completion mid-year)
Friendly proportional takeover
($1.02 cash) for EME; Jindalee
accepts for 70% of its EME
shares
Wide range of incentives potentially available to McDermitt
Inflation Reduction Act
Provides substantial incentives to boost domestic critical minerals and
battery production
▪ On 16 August 2022 the Inflation Reduction Act (confirming $369B in
funding to reduce carbon emissions by 40% by 2030) became law¹
▪ From 2023 40% of EV’s battery materials must be sourced from the US
(or FTA partners) to qualify for the EV tax credit (rising to 80% by 2027)
▪ Under the Advanced Production Credit (section 45X):
▪ Domestic battery manufacturers eligible for US$35 per Kwh
▪ Domestic miners/processors producing specified critical minerals
will be eligible for tax credits equivalent to 10% of production costs
▪ $40B is available to the DOE’s Innovative Technology Loan Guarantee to
support projects that bolster a domestic supply of critical minerals
▪ Also provided additional funding to other Department of Energy (DoE)
and Department of Defense (DoD) grant and loan programs
19
1.
https://www.congress.gov/bill/117th-congress/house-bill/5376/text
Additional information
Competent Person Statement
References
The Exploration Results and Mineral Resource estimates referred to in this presentation
were first reported in accordance with ASX Listing Rules 5.7 and 5.8 in the
announcements as cross-referenced. The Company confirms that it is not aware of any
new information or data that materially affects the information included in the relevant
market announcements and, in the case of the Mineral Resource estimates, that all
material assumptions and technical parameters underpinning the estimates in the
relevant market announcement continue to apply and have not materially changed.
•
30/01/2024, “Quarterly Cashflow & Activity Reports – December 2023”
•
18/01/2024, “More Exceptional Metallurgical Results from McDermitt”
•
27/12/2023, “Chair Transition”
•
19/12/2023, “McDermitt Lithium Update”
•
11/12/2023, “Change of Directors’ Interest Notice”
•
04/12/2023, “Appointment of Ian Rodger as CEO”
•
21/11/2023, “Exploration Target Highlights Further Upside at McDermitt”
•
16/11/2023, “Becoming a substantial shareholder”
•
15/11/2023, “Exceptional Metallurgical Results from McDermitt”
•
23/10/2023, “First Results from Metallurgical Testwork at McDermitt”
•
07/06/2023, “Fluor Appointed Lead Engineer for McDermitt Project”
•
16/05/2023, “McDermitt Progress Update”
•
24/03/2023, “Preferred Lithium Extraction Process for McDermitt Project”
•
27/02/2023, “Resource at McDermitt increases to 21.5 Mt LCE”
•
13/02/2023, “MOU Executed with POSCO Holdings”
Share your feedback
Discover