Half Yearly Report and Accounts
Released
Released
Announcement PDF
Jindalee Lithium Limited
ABN 52 064 121 133
Half-Year Financial Report
31 December 2024
Jindalee Lithium Limited
Corporate directory
31 December 2024
Board and Management
Wayne Zekulich - Non-Executive Chair
Lindsay Dudfield - Executive Director
Darren Wates - Non-Executive Director
Paul Brown - Non-Executive Director
Ian Rodger - Chief Executive Officer
Company secretary
Carly Terzanidis
Registered office
Level 3, 88 William Street, Perth, WA 6000
Principal place of business
Level 2, 9 Havelock Street, West Perth, WA 6005
Telephone: +61 (8) 9321 7550
Facsimile: +61 (8) 9321 7950
Email: enquiry@jindaleelithium.com
Share register
Automic Group
Level 5, 191 St Georges Terrace
Perth, WA 6000
Telephone: +61 (2) 9698 5414
Auditor
BDO Audit Pty Ltd
Level 9 Mia Yellagonga Tower 2, 5 Spring Street
Perth, WA 6000
Legal Advisors
Piper Alderman
Level 26, 71 Eagle Street
Brisbane, QLD 4000
Stock exchange listing
Jindalee Lithium Limited shares are listed on the
Australian Securities Exchange (ASX code: JLL)
and
OTC Markets Group Inc (OTCQX: JNDAF)
Website
www.jindaleelithium.com
1
Jindalee Lithium Limited
Contents
31 December 2024
Directors' report
3
Auditor's independence declaration
14
Statement of profit or loss and other comprehensive income
15
Statement of financial position
16
Statement of changes in equity
17
Statement of cash flows
18
Notes to the financial statements
19
Directors' declaration
28
Independent auditor's review report to the members of Jindalee Lithium Limited
29
2
Jindalee Lithium Limited
Directors' report
31 December 2024
The directors present their report, together with the financial statements, on the Group consisting of Jindalee
Lithium Limited ("Jindalee", "the Company" or "Parent Entity") and the entities it controlled at the end of, or
during, the half-year ended 31 December 2024.
Directors
The following persons were directors of Jindalee Lithium Limited during the whole of the financial half-year
and up to the date of this report, unless otherwise stated:
Lindsay Dudfield
Wayne Zekulich
Darren Wates
Paul Brown
Principal activities
The principal activity of Jindalee Lithium Limited during the half-year was mineral exploration. During the
half-year there was no change in the nature of this activity
Dividends
There were no dividends paid, recommended or declared during the current or previous financial half-year.
Review of operations
The loss for the Group after providing for income tax amounted to $1,939,143 (31 December 2023:
$2,854,875).
Jindalee’s strategy is to identify, acquire and develop projects with the potential to transform the Group and
this continued to be the primary focus.
During the half-year efforts were concentrated on Jindalee’s 100% owned McDermitt Lithium Project (USA)
(“McDermitt” or “Project”). Mid-November 2024 Jindalee announced the results of the McDermitt PreFeasibility Study (“PFS”), confirming a 63 year life with strong financial metrics and a 5 year pay-back1. The
PFS supported publication of a Maiden Probable Ore Reserve for McDermitt and also indicated excellent
potential to further reduce capital and operating costs, as well as increase production at the Project.
Permitting activities and community engagement to help enable more detailed work to be undertaken at
McDermitt continued during the period. Jindalee also announced the signing of a cooperative research and
development agreement with the US Department of Energy (“DoE”) to identify opportunities to improve
outcomes at McDermitt9 and noted that an application for a grant to co-fund an accelerated Feasibility Study
was being considered by the Department of Defense (“DoD”)11.
During the period the Company raised approximately $6.1M to fund completion of the PFS and other
activities via the combination of a placement, an entitlement offer to shareholders and a convertible note.
McDermitt Lithium Project (USA)
Jindalee’s 100% owned McDermitt Lithium Project is located approximately 35km west of the town of
McDermitt, straddling the Oregon and Nevada border.
The Project occurs in the McDermitt Caldera, an extinct volcanic structure, with lithium mineralisation
hosted in a sequence of flat lying lakebed sediments overlying a basaltic basement. Recent geological
work has defined a consistent stratigraphic sequence comprising 12 distinct geological units. Four of these
units (Units 4, 6, 8 and 10) contain elevated lithium grades above 1,000ppm.
The current (2023) MRE for McDermitt contains a combined Indicated and Inferred Mineral Resource
Estimate of 3.0 Billion tonnes at 1,340ppm lithium for a total of 21.5 Million tonnes Lithium Carbonate
Equivalent (“LCE”) at 1,000ppm cut-off grade2 (see Table 1). At 21.5Mt LCE, McDermitt is one of the largest
lithium deposits in the US by contained lithium in Mineral Resource, and a globally significant resource, with
the deposit remaining open, particularly to the west.
3
Jindalee Lithium Limited
Directors' report
31 December 2024
Indicated Resource
Cut-off Grade
(ppm Li)
1,000
Indicated and Inferred
Resource
Inferred Resource
Tonna
ge (Mt)
Li
Grade
(ppm)
LCE
(Mt)
Tonna
ge (Mt)
Li
Grade
(ppm)
LCE
(Mt)
Tonna
ge (Mt)
Li
Grade
(ppm)
LCE
(Mt)
1,470
1,420
11.1
1,540
1,270
10.4
3,000
1340
21.5
Table 1 – Summary of 2023 McDermitt MRE2 at the reporting cut-off of 1,000 ppm. Note: totals may vary due to
rounding.
Metallurgical Testwork
In March 2023 Jindalee announced that global engineering, procurement, construction and maintenance
company Fluor Corporation (“Fluor”) had reviewed metallurgical testwork undertaken at McDermitt and had
determined that acid leaching with ore beneficiation (to upgrade the leach head grade) delivered the lowest
operating costs and best financial outcome among the alternatives considered3. Fluor has extensive
experience with sediment hosted lithium deposits in the US and recommended that a comprehensive
metallurgical testwork program be undertaken to enable the preferred flowsheet for the processing of
McDermitt ore to be defined and form the basis for the PFS.
Testwork on drill core from Units 4, 6, 8 and 10 commenced at consultant metallurgists Hazen Research
Inc. in July 2023 under the supervision of Fluor. Mid-November 2023 Jindalee announced excellent results
from beneficiation of the individual unit samples via attrition scrubbing4. The calculated recovery for a
composite sample (representing a nominal life-of-mine average feed) recovered 92.0% of the lithium to
leach feed and rejected 25.3% of the mass at a cut size of 250 microns (µm) (Table 2). The average grade
to leach was 2,107 ppm Li, 18% higher than the average head grade of the metallurgical samples (1,790
ppm Li) and 57% higher than the average Mineral Resource grade (1,340 ppm Li; refer Table 1).
Cut Size (µm)
Pit Shell
Li Recovery
Mass Rejection
Li to Leach
250
6
92.0%
25.3%
2,107 ppm
Table 2 – Summary of Lithium Recoveries via Attrition Scrubbing at 250 micron cut size4.
Initial acid
leaching results
from the
Cut Size (µm)
4
6
8
10
Composite
250
Leach Feed
(100% passing
µm)
Li Extraction
(500 kg/t)
Li Extraction
(850 kg/t)
250
96.8%
98.7%
75
99.1%
N/A
250
91.9%
99.1%
75
92.1%
N/A
250
91.5%
99.0%
75
90.7%
N/A
250
89.2%
100.0%
75
88.0%
N/A
250
92.9%*
N/A
75
94.0%
N/A
Table 3 – Maximum Lithium Extraction at variable feed sizes and acid strengths - Units 4, 6, 8 and 10
(* calculated)
4
Jindalee Lithium Limited
Directors' report
31 December 2024
The calculated Li extraction for a composite sample using 250 µm leach feed was 92.9% which compares
favourably with the extraction rate (94.0%) achieved through testwork from the finer (75 µm) leach feed
(Table 3) using 500 kg/t acid.
Testwork on beneficiated samples (250 µm) undertaken by POSCO Holdings (NYSE: PKX), pursuant to the
Memorandum of Understanding signed with POSCO in February 20236, returned similar extraction rates
(96.5% from Unit 4 and 96.3% from Unit 6) within two hours at similar acid dosages7.
Leaching of a bulk composite commenced in January 2024 to provide lithium in solution for downstream
testwork and in July 2024 the Company announced first production of a 99.8% pure lithium carbonate,
comfortably meeting battery grade industry standards (>99.5%) and confirming that all steps of the
McDermitt flowsheet adopted for the PFS had been validated8 (Figure 1).
Figure 1 – McDermitt Lithium Project – Simplified Flowsheet.
Pre-Feasibility Study (PFS)
On 19 November 2024 Jindalee announced the results of the PFS on the McDermitt Lithium Project1. The
PFS represents the culmination of over 18 months of detailed metallurgical testwork (refer above) and
engineering and related studies managed by the Jindalee team, with key support from Fluor, Cube
Consulting and specialist US and Australian consultants. Highlights of the PFS are summarised in Tables 4
and 5 and include:
•
Lithium Carbonate Production: Forecast production of 1.8 million tonnes battery grade Lithium
Carbonate over first 40 years, supporting the growing US battery supply chain
•
Average Annual Lithium Carbonate Production:
•
o
47.5ktpa in the first 10 years of commercial operation (C1 unit cost US$8,080/t of lithium
carbonate)
o
44.3ktpa in the first 40 years of commercial operation (C1 unit cost US$8,670/t of lithium
carbonate)
Strong Financial Metrics (first 40 years): Ungeared, using flat US$24,000/t lithium carbonate price
o
Post-tax NPV8 of US$3,229M
o
Post-tax IRR of 17.9%
o
Payback period under 5 years
5
Jindalee Lithium Limited
Directors' report
31 December 2024
•
Generational Project with Life in Excess of 40 years: The PFS Processing Schedule supports a 63
year production life (including commissioning and ramp-up), however it is important to note that the
production target and forecast financial information excludes any production post 40 years of
commercial operation)
•
Processing Studies and Capital Estimate prepared by Fluor: US$3.02B capital estimate, including
21% contingency
•
EBITDA Margin: 66% over the first 10 years of operations, with C1 costs in the bottom half of industry
and 17% pre-tax net operating cashflow margins (including sustaining capital) at November 2024 spot
prices
•
Maiden Probable Ore Reserve (JORC 2012) of 251Mt @ 1,751ppm lithium, containing 2.34Mt1 of
LCE, accounts for 79% of forecast production in the PFS Processing Schedule but represents only
~10% of current MRE3 on a contained LCE basis, highlighting future optionality
The PFS envisions a conventional open-pit mining method, with a low strip ratio and no blasting required
due to the soft and friable nature of the ore and waste material. The pit designs and mining schedule were
developed by Cube Consulting, treating only Units 4 and 6 as ore, although Units 8 and 10 are economically
viable and may be incorporated into the production schedule in future study phases.
The PFS supported publication of a Maiden Probable Ore Reserve, also developed by Cube Consulting, of
251Mt of Ore grading an average of 1,751ppm lithium for 2.34Mt of contained LCE (Table 4) representing
only ~10% of the lithium contained in the MRE. 79% of the PFS mining schedule comprises Probable Ore
Reserves, 3% Indicated Resources with the balance (18%) being Inferred Resources, weighted towards the
back end of the schedule.
Probable Reserve
Cut-off Grade
(ppm Li)
Tonnage (Mt)
Li Grade (ROM-ppm)
LCE (Mt)
1,000
251
1,751
2.34
Table 4 – Summary of 2024 McDermitt Reserve. Note: totals may vary due to rounding.
Physicals and Production
Summary
First 10 Full Years
Economic Evaluation Period
(Project life incl. construction, commissioning/
ramp-up and first 40 full yrs of production)
Ore processing rate
4.8 to 5.3 Mt per annum
Ore tonnes processed
48.5Mt
203.0Mt
Average lithium feed grade
2,146ppm
1,967ppm
Average lithium recovery
85.8%
84.4%
Average lithium carbonate
production
47,500t per annum
43,800t per annum
475,000t
1,796,169t
Total lithium carbonate productioni
Pre-Production Capital Cost
Pre-production capital
US$2,377M
Contingency
US$495M
Owner’s costs
US$149M
Totalii
US$3,021M
Payback periodiii
5 years
6
Jindalee Lithium Limited
Directors' report
31 December 2024
Financial Resultsiv
First 10 full years
Economic Evaluation Period
(Project life incl. construction, commissioning/
ramp-up and first 40 full yrs of production)
Revenue
US$11,400M
US$43,108M
Sustaining capital
US$102M
US$508M
Net free cashflow: Pre-tax
US$7,108M
US$23,080M
Net free cashflow: Post-tax
US$6,629M
US$18,061M
US$8,080/t LCE
US$8,673/t LCE
66%
64%
C1 Costsv
EBITDA Marginvi
Discounted Cashflowiv, vii: Pre-tax
US$3,895M
Discounted Cashflowiv, vii: Post-tax
US$3,229M
IRRiv: Pre-tax
18.1%
IRRiv: Post-tax
17.9%
Table 5 – Key PFS Physical and Financial Metrics.
Notes:
(i) Annual figures rounded to nearest 100t, total rounded to nearest 500t.
(ii) Totals may not sum due to rounding.
(iii) From commencement of production.
(iv) At US$24,000/t lithium carbonate price.
(v) C1 cost includes operating costs for mining, processing, administration and product sales, after accounting for
movements in inventory related to ore stockpiles.
(vi) Calculated as EBITDA / Revenue.
(vii) 8% real discount rate.
Refer to Jindalee’s ASX announcement dated 19 November 20241 for further details.
As noted above, the processing flowsheet consists of ore beneficiation (attrition scrubbing), sulphuric acid
leaching, purification and lithium carbonate precipitation (Figure 1). This flowsheet positions the Project as
a fully integrated domestic US battery grade lithium carbonate producer.
The process plant is designed to have lithium carbonate production capacity of 47.5ktpa. The Project is
forecast to produce at this rate for its first 10 full years of production, before declining slowly as the feed
grade declines (assuming no further high-grade ore is defined), producing circa 1.8Mt of Lithium Carbonate
over an initial 40 year production life post ramp up and commissioning, which forms the basis of the PFS
Economic Evaluation. The full 63 year PFS Processing Schedule has forecast total production of 2.5Mt of
Lithium Carbonate.
Onsite non-process infrastructure was defined by Fluor, with grid power supply, tailings and waste storage,
and water supply scope definition completed by experienced specialist engineering firms. Fluor consolidated
the non-process infrastructure capital cost estimate on a common basis. The Project benefits from access
to the power grid and US highway systems via the town of McDermitt, while the nearest railhead at
Winnemucca, 120km south of the town of McDermitt, provides access to the extensive North American rail
system.
The pre-production capital cost for the Project is estimated at US$3.02B, classified as a Class 4 estimate
under the Association for the Advancement of Cost Engineering (“AACE”) estimate classification system,
with an accuracy of +35%/-25%. The estimate base date is Q1 CY2024. The capital cost estimate considers
all execution-phase costs (post final investment decision), such as engineering procurement, construction
7
Jindalee Lithium Limited
Directors' report
31 December 2024
and commissioning, to bring the Project into operation. Construction and commissioning are assumed to be
undertaken over a three-year period, with pre-strip mining commencing in the third year.
The operating cost estimate for the Project has been classified as Class IV (AACE) and is based on Q1
CY2024 pricing. The cash operating cost for the first 10 years of full production is estimated at US$8,760
per tonne of lithium carbonate, with a C1 cost of US$8,080 per tonne over the same period. The largest
portion of operating costs is attributed to the process plant, derived from a Fluor-developed cost model.
The PFS results demonstrate a robust financial case for the Project under base case assumptions. Key
financial and operational metrics are summarised in Table 5 and reinforce the long life, high margin nature
of the Project. The Project maintains average EBITDA margins above 64% over the 40-year Economic
Evaluation Period, with C1 costs in the bottom half of industry cost curve, 17% pre-tax net operating
cashflow margins (including sustaining capital) at November 2024 lithium carbonate spot prices and
payback within the first five years of production (Figure 2).
$1,500
15,000
$1,000
5,000
$0
-5,000
-$500
Sales Revenue
Capital Costs
Tax Credits
Cum Cash Flow (RH Axis)
-$1,000
-$1,500
-$2,000
1
6
11
16
21
Operating Costs
Income Tax
Net Post Tax Cash Flow
26
31
36
US$M
US$M
$500
-15,000
41
-25,000
Project Year
Figure 2 – Annual and Cumulative Cashflow during Economic Evaluation Period.
Key sensitivities for Project post-tax NPV and cash flow were tested. As is typical for most resource projects,
value was most sensitive to revenue (as a proxy for lithium price, lithium recovery and/or lithium head grade).
The Project showed the lowest sensitivity to construction capital costs, given the long life and large revenues
generated.
Additionally, a number of future opportunities have been identified during the PFS, which have the potential
to materially improve Project economics through process optimisation and potential production of coproducts. These include opportunities for cost reduction and enhanced sustainability outcomes through the
strategic agreement with the US Department of Energy announced in September 20249.
Permitting and Community Engagement
In May 2023 Jindalee announced that the Exploration Plan of Operations (“EPO”) for McDermitt, originally
submitted to the US Bureau of Land Management (“BLM”) in August 2022 (with additional information
provided early 2023), had been deemed complete10.
The public comment period on the EPO closed mid-September 2023 and the environmental review process
required by the National Environmental Policy Act (“NEPA”) commenced in January 2024. The final decision
of the NEPA assessment will be incorporated into the EPO, with this process expected to take up to 12
months. A draft of the Environmental Assessment (“EA”) was updated during the period to include further
mitigation measures following discussions with the BLM and additional State and Federal agencies, with the
EA expected to be submitted for public comment early 2025.
Once approved, the EPO will allow Jindalee to significantly increase on-site activity, including infill drilling
and providing additional geological and environmental data, together with fresh samples for geotechnical,
studies and further metallurgical testwork.
8
Jindalee Lithium Limited
Directors' report
31 December 2024
In October 2024 the Company advised that it had entered into agreements with the nearby Fort McDermitt
Paiute Shoshone Tribe (“FMPST”), located approximately 30km east of the Project7. These agreements
form a crucial part of the community engagement and permitting process.
The first agreement, a Communications Protocol, is designed to facilitate cooperation between the FMPST
and the Company and foster sharing of information and collaborative efforts between the parties. The
Communications Protocol also establishes a communication cadence between the parties to ensure open
dialogue on issues of common concern and interest.
The second agreement is a Cultural Study, Ethnobotanical Survey and Funding Agreement, which will allow
FMPST, in partnership with its consultants, to conduct studies in the Project area. These studies aim to
identify culturally significant areas, plants and resources, ensuring that potential impacts on the FMPST’s
cultural heritage are considered as part of Jindalee’s proposed activities under its EPO. Under this
agreement Jindalee will provide limited funds to FMPST to cover costs incurred as part of the studies.
Jindalee looks forward to working closely with the FMPST, and other Tribal groups, going forward.
The Company continues to build its US capability ahead of an expected increase in activity in 2025, including
appointment of experienced Environmental, Social, and Governance (“ESG”) Manager Sandra Carson who
commenced in November 2024. Ms Carson will focus on advancing the federal and state permitting
programs at McDermitt, developing robust community engagement programs for McDermitt and
surrounding communities (including interested Tribal groups), and developing industry-leading ESG policies
and procedures specific to exploration activities, which would be among the first in the industry to focus on
early stage exploration.
US Government Support
Jindalee continues to engage with US Government agencies (both State and Federal) regarding
opportunities to advance the Project, including technical cooperation between agencies and the potential
for US Government funding for the Project.
In September 2024 Jindalee announced that it had been approved by the DoE’s Office of Energy Efficiency
and Renewable Energy for a Cooperative Research and Development Agreement (“CRADA”)9. The CRADA
aims to develop cutting edge extraction methods for McDermitt designed to lower costs and minimise
environmental impact, including lowering water usage and acid consumption and reducing the footprint of
the Project, as well as exploring the potential for co-products. Research is being led by Ames National
Laboratory with other key members including the Oregon Department of Geology and Mineral Industries
(“DOGAMI”), Oregon State University, University of Nevada Reno, Lawrence Berkeley National Laboratory
and the National Energy Technology Laboratory.
Work undertaken under the CRADA is being funded by the DoE with Jindalee providing in-kind support,
including access to data, samples, and technical expertise. In October 2024, Jindalee hosted a contingent
of researchers from the consortium at the McDermitt Project location to further project understanding and
develop mineralogical characterisation and genesis models. This foundational work will be leveraged in
developing and refining future novel lithium extraction methodologies from the McDermitt ore, which could
potentially further optimise the McDermitt flowsheet.
Also in September 2024, Jindalee confirmed that an application for non-dilutive grant funding lodged with
the DoD remained on foot11. If successful, the DoD grant application is expected to provide co-funding for
an accelerated Feasibility Study and associated drilling and test work at McDermitt, with any potential award
decision expected early 2025, once policy settings under the new US administration have been confirmed.
President Trump was inaugurated as President of the United States on 21 January 2025. The Trump
administration has expressed strong support for increasing US production of critical minerals and reducing
reliance on China, which currently dominates global supply chains for these essential materials, including
lithium. Several policy initiatives are anticipated to advance this objective, such as:
•
•
•
Increased tariffs on Chinese imports: Tariffs as high as 60% have been proposed to incentivise
domestic production12.
Streamlined regulation in the critical mineral sector: Efforts include fast-tracking permitting for new
projects, supported by two executive orders issued on President Trump’s first day in office13,14,15.
Enhanced financing and tax incentives: Ongoing support for domestic critical minerals projects,
bolstered by an additional executive order issued on President Trump’s first day in office15.
9
Jindalee Lithium Limited
Directors' report
31 December 2024
As a future large-scale, long-life producer of “American-made” lithium chemicals for the US battery supply
chain, the McDermitt Lithium Project is well placed to capitalise on the Trump administration’s strong support
for domestic critical minerals projects and US energy security.
CORPORATE
Capital Raising
During the period Jindalee raised approximately $6.1M via a combination of a Placement, Entitlement Issue
and Convertible Note (together, the “Capital Raise”)16, with potential to raise up to a further $9.0M in
Convertible Notes. The Capital Raise was cornerstoned by Mercer Street Global Opportunity Fund II and
other funds managed by US-based C/M Capital Partners (“Mercer Street”). The three components of the
Capital Raise are summarised below:
•
A Placement of ~$0.6M to Mercer Street, directors and management at $0.30 per fully paid ordinary
share (“Share”) with each 2 Shares accompanied by 1 listed Short-Term Option and 1 listed LongTerm Option (“Attaching Options”):
• Short-Term Option (JLLO): exercise price of $0.40 and expiry date of 30 June 2025
• Long-Term Option (JLLOA): exercise price of $0.60 and expiry date of 30 June 2027
Placement Shares were issued to Mercer Street and management on 10 July 2024 following receipt
of funds, with participation in the Placement by Jindalee Directors approved at the Extraordinary
General Meeting (“EGM”) held 21 August 202417 and Shares issued shortly thereafter.
•
An Entitlement Issue to raise up to $3.1M from eligible shareholders on a 1 for 6 basis at $0.30 per
Share with Attaching Options being offered on the same ratio and the same terms issued to
Placement participants. Shareholders were also able to apply for any shortfall of new Shares offered
in the Entitlement Issue. The Entitlement Issue closed on 2 August 2024 with ~82.5% of the Shares
available under the Entitlement Issue taken up by Jindalee shareholders, raising ~$2.5M18.
•
An issue of Convertible Notes, each with a face value of $1.00, to Mercer Street for a total
investment of up to $12M in three or more tranches. Funds for the first tranche comprising an
investment of $1.5M were received early July 2024, with the second tranche (also $1.5M) approved
at the EGM and received in August 2024, with potential for additional funding of up to $9.0M by
mutual agreement.
General
Jindalee currently has 73.6M shares on issue, with cash at 31 December 2024 of approximately $1.83M19.
Significant changes in the state of affairs
There were no significant changes in the state of affairs of the Group during the financial half-year.
Matters subsequent to the end of the financial half-year
On 25 February 2025 Jindalee announced that it had realised $2.75M (before costs) from the sale of its
shareholding in Dynamic Metals (ASX: DYM, “Dynamic”). Dynamic was formerly a Jindalee subsidiary which
held Jindalee’s Australian exploration assets and which listed on ASX in January 2023 following a $7M initial
public offer (“IPO”), which included a priority entitlement to Jindalee shareholders.
Other than the matters outlined above, no other matter or circumstance has arisen since 31 December 2024
that has significantly affected, or may significantly affect the Consolidated Entity's operations, the results of
those operations, or the Consolidated Entity's state of affairs in future financial periods.
No other matter or circumstance has arisen since 31 December 2024 that has significantly affected, or may
significantly affect the Group's operations, the results of those operations, or the Group's state of affairs in
future financial years.
Auditor's independence declaration
A copy of the auditor's independence declaration as required under section 307C of the Corporations Act
2001 is set out immediately after this directors' report.
10
Jindalee Lithium Limited
Auditor's independence declaration
This report is made in accordance with a resolution of directors, pursuant to section 306(3)(a) of the
Corporations Act 2001.
On behalf of the directors
___________________________
Lindsay Dudfield
Executive Director
14 March 2025
Perth
11
Jindalee Lithium Limited
Auditor's independence declaration
References:
Additional details including JORC 2012 reporting tables, where applicable, can be found in the following releases lodged
with ASX and referred to in this report:
1.
Jindalee Lithium ASX announcement 19/11/2024: “McDermitt Lithium Project Pre-Feasibility Study”
2.
Jindalee Lithium ASX announcement 27/02/2023: “Resource at McDermitt increases to 21.5 Mt LCE”
3.
Jindalee Lithium ASX announcement 24/03/2023: “Preferred Lithium Extraction Process for McDermitt Project”
4.
Jindalee Lithium ASX Announcement 15/11/2023: “Exceptional Metallurgical Results from McDermitt”
5.
Jindalee Lithium ASX Announcement 18/01/2024: “More Exceptional Metallurgical Results from McDermitt”
6.
Jindalee Lithium ASX Announcement 13/02/2023: “MOU Executed with POSCO Holdings”
7.
Jindalee Lithium ASX announcement 31/10/2024: “Quarterly Activities Report – September 2024”
8.
Jindalee Lithium ASX Announcement 31/07/2024: “Battery-Grade Lithium Carbonate produced from McDermitt”
9.
Jindalee Lithium ASX Announcement 16/09/2024: “JLL Secures Strategic Agreement with US Department of
Energy”
10. Jindalee Lithium ASX Announcement 16/05/2023: “McDermitt Progress Update”
11. Jindalee Lithium ASX Announcement 23/09/2023: “US Government Funding Update”
12. https://www.pbs.org/newshour/economy/trump-favors-huge-new-tariffs-how-do-they-work
13. https://www.bloomberg.com/news/articles/2024-12-18/trump-team-eyes-ev-subsidy-cuts-in-plan-to-reshapeauto-industry
14. Declaring a National Energy Emergency – The White House
15. Unleashing American Energy - The White House
16. Jindalee Lithium ASX announcement 04/07/2024: “JLL Secures Funding to Advance McDermitt Lithium Project”
17. Jindalee Lithium ASX announcement 21/08/2024: “Results of Meeting”
18. Jindalee Lithium ASX announcement 09/08/2024: “Results of Entitlement Issue”
19. Jindalee Lithium ASX announcement 30/01/2025: “Quarterly Cashflow Report – December 2024”
20. Jindalee Lithium ASX announcement 25/02/2025: “Jindalee Realises $2.75M From Sale of Non-Core Asset”
Competent Persons Statement
The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on
information compiled by Mr Lindsay Dudfield. Mr Dudfield is a directo
Share your feedback