Exceptional Metallurgical Results From McDermitt
Released
Released
Announcement PDF
JRL
JNDAF
15 November 2023
EXCEPTIONAL METALLURGICAL
RESULTS FROM McDERMITT
• Exceptional results from beneficiating McDermitt ore using simple screening
• Attrition scrubbing at a coarse cut size of 250 microns returns 92.0% Li recovery with
25.3% mass rejection
• Lithium grade to leach increases to 2,107 ppm Li, 57% higher than the average Mineral
Resource grade (1,340 ppm Li)1
• Potential for further improvements by optimising cut size for specific mineralised units
• Leach testwork on beneficiated samples currently underway with results to feed into PFS
On 23 October 2023, Jindalee Resources Limited (to be renamed “Jindalee Lithium Limited”) (Jindalee, the
Company) announced initial head assay results for metallurgical samples from the Company’s 100% owned
McDermitt Lithium Project located in Oregon, USA and noted that beneficiation was underway, ahead of acid
leach testwork2. The testwork is being undertaken at consultant metallurgists Hazen (Colorado, USA) and being
managed by leading global engineering, procurement, construction and maintenance company Fluor Corporation.
Jindalee is pleased to advise that beneficiation of these samples via attrition scrubbing has been completed,
returning excellent results. Pit shell composites consisting of Units 4, 6, 8 and 10 from conceptual Pit Shell 6
(nominal 43 years) (Figures 2 and 3), recovered 92.0% of the lithium to leach feed and rejected 25.3% of the mass
at a cut size of 250 microns (Table 1). The average grade to leach was 2,107 ppm Li, 18% higher than the average
head grade of the metallurgical samples (1,790 ppm Li)2 and 57% higher than the average Mineral Resource grade
(1,340 ppm Li; refer Table 2).
Cut Size (µm)
Pit Shell
Li Recovery
Mass Rejection
Li to Leach
250
6
92.0%
25.3%
2,107 ppm
Table 1 – Summary of Lithium Recoveries via Attrition Scrubbing at 250 micron cut size (Pit Shell 6)
Beneficiation testwork on individual units has confirmed higher lithium concentrations in the finer fractions of
Units 4 and 6, where the minus 38-micron fraction contains 90.5% and 81.1% of the contained lithium respectively
(Figure 1). This has positive implications for processing of these deeper units with the potential to optimise lithium
recoveries by adopting a finer cut size as development progresses.
The 250-micron cut size will be adopted for initial acid leaching testwork for the McDermitt Pre-feasibility Study
(PFS), with variable attrition times and cut sizes, and scrubbing of coarse material (to increase recovery of lithium
to fines), to be further investigated. Initial results are expected early December 2023.
Jindalee Resources Limited
ABN 52 064 121 133
Level 2, 9 Havelock Street, West Perth, WA, 6005
PO Box 1033, West Perth, WA 6872
www.jindalee.net
E: enquiry@jindalee.net
P: +61 9321 7550
F: +61 9321 7950
Figure 1 – Lithium Recovery to Leach Feed by particle size (Units 4, 6, 8 and 10)
Discussion
In March 2023 Jindalee announced that previous metallurgical testwork undertaken at McDermitt had been
reviewed and that acid leaching with ore beneficiation (to upgrade the leach head grade) had been determined
to deliver the best financial outcome among the alternatives considered3. It was also noted that the very large
Mineral Resource Estimate (MRE) at McDermitt (21.5 Mt LCE, Table 2)1 allowed flexibility in development,
providing the opportunity to optimise mining and feed higher grade ore early in the mine life. Subsequently, a
comprehensive metallurgical testwork program has commenced to provide testwork data upon which the
preferred flowsheet for the processing of McDermitt ore can be designed.
Recent relogging of McDermitt drilling has recognised up to 12 distinctive stratigraphic units which can be tracked
across the Project (Figure 2). Four of these units (Units 4, 6, 8 and 10) carry elevated lithium grades and selective
mining of these units has the potential to deliver significantly higher grade material (when compared to the MRE
average grade) for processing2.
Figure 2 – Schematic Section C-C’ with completed drilling, simplified geology and conceptual Pit Shell 6 (nominal 43 years).
(Note: lateral projection onto section plane and 3x vertical exaggeration may cause distortion)
In June 2023 leading mine engineering group Cube Consulting generated conceptual pit shells using the McDermitt
MRE geological model (Figures 2 and 3) to assist with selection of samples for the metallurgical testwork program.
Samples from Units 4, 6, 8 and 10 within the Indicated portion of Pit Shell 6 (nominal 43 years) were selected and
approximately 700kg of drill core was despatched to Hazen for testing. Initial head assays for these samples were
announced on 23 October 20232 with results from beneficiation of these samples now being reported.
ASX Announcement – Exceptional Metallurgical Results from McDermitt
Figure 3 – Plan view of the McDermitt Lithium Project with 2023 Mineral Resource1 (at 1523mRL), completed drilling, Section C-C’ and
schematic conceptual pit shells (Pit Shell 5: nominal 20 years; Pit Shell 6: nominal 43 years).
Next Steps
Acid leaching of the beneficiated samples (250 micron cut) is currently underway with initial results expected early
December 2023. The results from the acid leaching testwork will feed into the PFS, which is expected to be
completed by mid-2024.
Samples from Units 4, 6, 8 and 10 are also being beneficiated for shipping to POSCO Holdings (NYSE: PKX) (POSCO)
for further testwork, pursuant to the Memorandum of Understanding signed with POSCO in February 20234.
Authorised for release by the Board of Jindalee Resources Limited.
For further information please contact:
LINDSAY DUDFIELD
Executive Director
T:
+ 61 8 9321 7550
E:
enquiry@jindalee.net
ASX Announcement – Exceptional Metallurgical Results from McDermitt
Cut-off
Grade
Indicated Resource
Inferred Resource
Indicated and Inferred Resource
(ppm Li)
Tonnage
(Mt)
Li Grade
(ppm)
LCE (Mt)
Tonnage
(Mt)
Li Grade
(ppm)
LCE
(Mt)
Tonnage
(Mt)
Li Grade
(ppm)
LCE
(Mt)
1,000
1,470
1,420
11.1
1,540
1,270
10.4
3,000
1340
21.5
Table 2 – Summary of 2023 McDermitt Mineral Resource Estimate at the reporting cut-off of 1,000ppm. Note: totals may
vary due to rounding.
Lithium carbonate equivalent (LCE) is calculated by taking the lithium value and multiplying by 5.323 to determine the molar
equivalent in standard industry fashion.
References
1.
2.
3.
4.
Jindalee Resources ASX announcement 27/02/2023: “Resource at McDermitt increases to 21.5 Mt LCE”
Jindalee Resources ASX announcement 23/10/2023: “First Results from Metallurgical Testwork at McDermitt”
Jindalee Resources ASX announcement 24/03/2023: “Preferred Lithium Extraction Process for McDermitt Project”
Jindalee Resources ASX announcement 13/02/2023: “MOU Executed with POSCO Holdings”
About Jindalee
Jindalee Resources Limited (ASX: JRL) is a pure-play US lithium company focussed on the development of the giant McDermitt
Lithium Project (21.5 Mt LCE3), currently the largest lithium deposit in North America. Jindalee also provides shareholders
with indirect exposure to lithium, gold, base and strategic metals, iron ore, uranium and magnesite in Australia through
holdings in spin-out companies Dynamic Metals (ASX: DYM) and Energy Metals (ASX: EME).
Competent Persons Statement
The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information
compiled by Mr Lindsay Dudfield. Mr Dudfield is a director and shareholder of, and consultant to, the Company and a Member
of the Australasian Institute of Mining and Metallurgy and the Australian Institute of Geoscientists. Mr Dudfield has sufficient
experience relevant to the styles of mineralisation and types of deposits under consideration, and to the activity being
undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Minerals Resources and Ore Reserves.’ Mr Dudfield consents to the inclusion in this report of the matters
based on this information in the form and context in which it appears.
The Company confirms that it is not aware of any further new information or data that materially affects the information
included in the original market announcements by Jindalee Resources Ltd referenced in this report and in the case of
estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the
relevant market announcements continue to apply and have not materially changed. To the extent disclosed above, the
Company confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original market announcements.
Forward-Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include but are not limited to
statements concerning Jindalee Resources Limited’s (Jindalee’s) current expectations, estimates and projections about the
industry in which Jindalee operates, and beliefs and assumptions regarding Jindalee’s future performance. When used in this
document, the words such as “anticipate”, “could”, “plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”,
“should”, and similar expressions are forward-looking statements. Although Jindalee believes that its expectations reflected
in these forward-looking statements are reasonable, such statements are subject to known and unknown risks, uncertainties
and other factors, some of which are beyond the control of Jindalee and no assurance can be given that actual results will be
consistent with these forward-looking statements.
ASX Announcement – Exceptional Metallurgical Results from McDermitt
Annexure A:
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.
• Diamond drilling was used to collect HQ triple tube (HQ3 63.5mm)
diameter core.
• Core was cut and quarter core sampled on 1.5m intervals or lithological
and/or alteration boundaries.
• Colluvium/overburden was not sampled.
• All samples were placed into individually labelled, consecutively numbered
sample bags.
• Metallurgical test work samples were a composite sample of quarter core
or coarse rejects from the previously conducted geochemical assaying and
are believed to be representative of the interval under investigation.
• The samples (approximately 700kg total) came from holes MDD004,
MDD006, MDD012, MDD018, MDD023 and MDD026 with samples taken
from Units 4, 6, 8 and 10 within the Indicated portion of conceptual Pit
Shell 6 (nominal 0-43 years).
• Composite samples for Pit Shell 6 (Table 1) comprised 10% from Unit 10
and 30% each from Units 4, 6 and 8, reflecting anticipated average ore
composition for 0-20 years.
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
• Method of recording and assessing core and chip sample recoveries
and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
• Diamond drilling was used to collect HQ3 (63.5mm) diameter core.
• Core holes were drilled vertically, and core was not oriented.
Drill sample
recovery
• Core blocks inserted by the drilling company indicated the length of a run
and the amount of recovered core in feet. The site geologist converted this
to metres and core recovery was recorded on the sampling sheet. Core
recovery was the primary focus for the drill contractor and was typically
>90% in the zones of interest.
• Core recovery was recorded by the site geologist, and 1m downhole
depths marked prior to geological logging and sampling.
• No relationship between recovery and grade was observed, no core loss
was observed over the interval under investigation.
Criteria
JORC Code explanation
Commentary
Logging
• Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
• If core, whether cut or sawn and whether quarter, half or all core
taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of the
in-situ material collected, including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material
being sampled.
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
• Qualitative lithological descriptions were recorded by the field geologist
once core had been presented and depths marked. Correlation of this
information to the field mapping and stratigraphic sections described in the
immediate area is ongoing to build a comprehensive picture of the geology
over the project area.
• Photos (wet and dry) were taken of all core trays for later review.
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Assay results were verified by more than one Jindalee geologist.
• Data from Hazen is received and stored electronically. To date no .pdf
certificates have been received for the assays completed by Hazen.
Sub-sampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
Verification of
sampling and
assaying
• Core was cut, and quarter core sampled over 2m intervals.
• The samples were individually crushed to 70% passing less than 2mm,
and 500g sub samples were riffle split off by ALS Laboratories in Reno,
Nevada with the remaining samples (coarse residues) averaging
approximately 1.7kg each.
• Quarter core and the coarse residue samples from ALS Laboratories were
forwarded to Hazen Research Inc. in Golden, Colorado (Hazen) where
they were crushed to 100% passing 1.7mm before compositing to be used
for the metallurgical testwork documented in this announcement.
• Samples were originally assayed by ALS Laboratories in Reno, Nevada
via a 4-acid digest of a 0.25g sample split with a 48 element ICP-MS finish
as previously reported.
• Hazen analysed the head sample for Li and a range of other elements
using 4-acid digest and peroxide fusion digest with the digested solution
analysed by ICP-OES.
• Laboratory QAQC involves the use of internal lab standards, splits and
replicates as part of in-house procedures. Hazen participates in numerous
external umpire assessments to maintain high levels of QAQC in relation
to their peers.
Criteria
Location of
data points
JORC Code explanation
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
Commentary
• Drill hole locations were surveyed using a handheld Garmin GPS with an
accuracy of +/- 3m horizontally, and +/- 5m vertically; hole positions were
also checked against a Digital Elevation Model (DEM).
• Locations are reported in metres NAD83 Zone11.
• Downhole surveys were undertaken at approximately 30m intervals
downhole and at the end of hole. The maximum variation from vertical
observed was 1.7°, typically <0.5°, with a survey accuracy of +/- 0.1°.
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and
classifications applied.
• Whether sample compositing has been applied.
• Spacing of drilling and associated sampling is adequate for assessment of
the areas and geological horizon(s) of interest.
• An Indicated and Inferred Mineral Resource has been estimated for the
McDermitt Project (refer Jindalee’s ASX announcement dated 27/02/2023
for further details).
• Sample compositing was undertaken for metallurgical test work as
described above.
Orientation of
data in
relation to
geological
structure
• Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
• If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
• The measures taken to ensure sample security.
• Vertical drill holes were appropriate for assessing the flat lying units of
interest. Downhole lengths reported are therefore the same as true widths.
• The results of any audits or reviews of sampling techniques and data.
• The testwork undertaken by Hazen was supervised by metallurgists
employed by Hazen and reviewed by senior metallurgists from Fluor
Corporation.
Sample
security
Audits or
reviews
• Samples were collected by qualified geological consultants engaged by
Jindalee and stored on site in locked sample storage bins provided by ALS
Laboratories, who then collected the bins and transported them to their
facilities in either Reno or Elko, USA.
• Metallurgical samples were sent from ALS Laboratories in Reno, Nevada
to Hazen Research Inc. in Golden, Colorado, USA.
• All samples were received as expected by the laboratories with no missing
or mis-labelled samples.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
• The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
• Acknowledgment and appraisal of exploration by other parties.
• Samples reported are all from land managed by the US Bureau of
Land Management, with the mineral rights held under placer and lode
claims owned 100% by HiTech Minerals Inc., a wholly owned US
based subsidiary of Jindalee Resources Limited.
• No joint ventures or royalty interests are applicable.
Geology
• Deposit type, geological setting and style of mineralisation.
• Lithium is hosted in flat-lying, lacustrine sediments deposited within
the Tertiary aged McDermitt caldera.
Drill hole
Information
• A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should clearly
explain why this is the case.
• In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used
for such aggregation should be stated and some typical examples of
such aggregations should be shown in detail.
• Please see table and figures in main body of text, including in
previous releases referenced above.
Exploration
done by other
parties
Data
aggregation
methods
• At McDermitt, historic uranium exploration by Chevron first identified
the presence of lithium. No data from historic work undertaken within
the McDermitt Project area has been obtained.
• Significant intercepts are presented as a weighted average above a
1000ppm Li cut-off, with a maximum of 10 feet (3.05m) internal
‘waste’ (where ‘waste’ is defined as intervals with less than 1000ppm
Li) and a minimum downhole width of 20 feet (6.1m).
• Conversion from Li ppm to Li2O is achieved by multiplying by 2.153
and converting to %.
Criteria
Relationship
between
mineralisation
widths and
intercept
lengths
Diagrams
Balanced
reporting
Other
substantive
exploration
data
Further work
JORC Code explanation
Commentary
• The assumptions used for any reporting of metal equivalent values
should be clearly stated.
• Lithium carbonate equivalent (LCE) is calculated by taking the Li
value and multiplying by 5.323 to determine the molar equivalent in
standard industry fashion.
• These relationships are particularly important in the reporting of
Exploration Results.
• If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (eg ‘down hole length, true
width not known’).
• Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view of
drill hole collar locations and appropriate sectional views.
• Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting of
Exploration Results.
• Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical
survey results; geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential
deleterious or contaminating substances.
• The nature and scale of planned further work (eg tests for lateral
extensions or depth extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling areas,
provided this information is not commercially sensitive.
• Vertical drill holes were appropriate for assessing the flat lying units of
interest. Downhole lengths reported are therefore the same as true
widths.
• See main body of announcement.
• Only selected metallurgical test results relevant to this release have
been reported.
• Field mapping across the project area, aerial photography and
description of stratigraphic sections exposed in several escarpments
allows for correlation of the geology between drill holes.
• Metallurgical test work is reported herein. Other data published is
from previous releases and references to these have been provided.
• Metallurgical testwork (previously announced) has indicated high
lithium recoveries from leaching with sulphuric acid at moderate
temperature and atmospheric pressure and that the mineralised
material can be beneficiated using attrition scrubbing.
• Further metallurgical test work is currently underway to identify
improved options for lithium extraction ahead of a Pre-Feasibility
Study (PFS) expected to be completed by mid-2024.
• Additional drilling is planned to define extensions to known
mineralisation, upgrade the mineral resource estimate and obtain
samples for further metallurgical testwork.
Share your feedback
Discover