Annual General Meeting 2023
Realising America’s largest
Lithium resource
Lindsay Dudfield
Executive Director and CEO
ASX:JRL
OTCQX:JNDAF
NOVEMBER 2023
Disclaimer
This Presentation has been prepared by Jindalee Resources Limited (“Jindalee”, “Company” or “JRL”) and is authorised for release by its Executive Director, Mr Lindsay Dudfield. Certain
information in this presentation has been derived from third parties and though Jindalee has no reason to believe that it is not accurate, reliable or complete, it has not been independently
audited or verified by Jindalee. Except to the extent required by law, Jindalee makes no representations or warranty as to the accuracy, reliability or completeness of information in this
document and does not take responsibility for updating any information or correcting any errors or omissions which may become apparent after this presentation is released.
This presentation is for information purposes only. It is not a prospectus, product disclosure statement or other disclosure document under Australian law or any other law (and will not be
lodged with the Australian Securities and Investments Commission or any foreign regulator) and is not, and does not constitute, an invitation or offer of securities for subscription, purchase or
sale in any jurisdiction. In particular, this presentation does not constitute an invitation or offer of securities for subscription, purchase or sale in the United States or any other jurisdiction in
which such an offer would be illegal. The securities referred to in this presentation have not been and will not be registered under the U.S. Securities Act of 1993 as amended or the securities laws
of any state or other jurisdiction of the United States and may not be offered or sole, directly or indirectly in the United States.
This presentation may contain certain forward-looking statements. Forward-looking statements include but are not limited to statements concerning Jindalee’s current expectations, estimates
and projections about the industry in which Jindalee operates, and beliefs and assumptions regarding Jindalee’s future performance. When used in this document, the words such as
“anticipate”, “could”, “plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”, “should”, and similar expressions are forward-looking statements. Although Jindalee believes that its
expectations reflected in these forward-looking statements are reasonable, such statements are subject to known and unknown risks, uncertainties and other factors, some of which are beyond
the control of Jindalee and no assurance can be given that actual results will be consistent with these forward-looking statements.
Such factors may include, among others, risks related to results of current or planned exploration activities, changes in market conditions, obtaining appropriate approvals to undertake
exploration activities in the portfolio of projects, changes in exploration programs and budgets based upon the results of exploration, future prices of minerals resources; grade or recovery rates;
accidents, labour disputes and other risks of the mining industry; delays in obtaining government approvals or financing or in the completion of development or construction activities;
movements in the share price of investments and the timing and proceeds realised on future disposals of investments, force majeure events, as well as those factors detailed from time to time in
the Company’s interim and annual financial statements and reports, all over which are available for review on ASX at asx.com.au and OTC Markets at otcmarkets.com.
Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements will
prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forwardlooking statements.To the extent permitted by law, Jindalee and its officers, employees, related bodies corporate and agents disclaim all liability, direct, indirect or consequential (and whether
or not arising out of the negligence, default, or lack of care of Jindalee and/or any of its agents) for any loss or damage suffered by a recipient or other persons out of, or in connection with, any
use or reliance on this presentation or information. This presentation does not constitute investment advice and has been prepared without taking into account any investor's particular
investment objectives, financial circumstances or particular needs and the opinions and recommendations in this presentations are not intended to represent recommendations of particular
investments to particular persons. You should seek professional advice when deciding if an investment is appropriate. All securities transactions involve risks, which include (among others) the
risk of adverse or unanticipated market, financial or political developments.
All amounts are in A$ unless stated otherwise.
Company Overview
Corporate Snapshot
Share Price (ASX:JRL, OTCQX:JNDAF)
Share Capital (ASX:JRL, OTCQX:JNDAF)
60.3m
Share Price 1
$1.08
Unlisted Options (from 40c to $5.00)
5.9m
Market Capitalisation 1
$65.1m
Cash 2
$4.3m
Investments 3
$4.3m
Debt
Enterprise Value
1. Share price as at 20/11/2023
Nil
$56.5m
Major Shareholders
2. Cash on hand as at 01/11/2023
L G Dudfield
24.5%
3. Share investments as at 20/11/2023 - DYM:ASX, EME:ASX
Kale Capital Corporation Pty Ltd
6.9%
Perennial Value Management
5.1%
Elmix Pty Ltd
3.5%
Lithium Supply | Demand and the US
USA Battery Production
Operating and announced
Inflation Reduction Act
Critical Mineral Projects
On 16 August 2022 the Inflation Reduction Act (confirming $369B in
funding to reduce carbon emissions by 40% by 2030) became law:¹
- From 2023 40% of EV’s battery materials must be sourced from the US
(or FTA partners) to qualify for the EV tax credit (rising to 80% by 2027)
- Under the Advanced Production Credit miners producing critical minerals will
be eligible for tax credits equivalent to 10% of production costs
- $40B is available to the DOE’s Innovative Technology Loan Guarantee to support
projects that bolster a domestic supply of critical minerals
On 13 January 2023 the DOE announced a $700M conditional loan to the Rhyolite Ridge
Project (3.4Mt LCE²) to finance on-site processing of lithium carbonate³
On 22 February 2023 Lithium Americas announced receipt of a Letter of Substantial Completion
for a loan from the DOE with funding expected to provide up to 75% of Thacker Pass Project capex⁴
1.
2.
3.
4.
https://www.congress.gov/bill/117th-congress/house-bill/5376/text
https://www.ioneer.com/projects/about-rhyolite-ridge/reserves-resources
https://www.energy.gov/lpo/articles/lpo-announces-conditional-commitment-ioneer-rhyolite-ridge-advance-domestic-production
https://www.lithiumamericas.com/_resources/news/nr_20230222.pdf
McDermitt Lithium Project
McDermitt Overview
Ownership
100% owned by Jindalee
Location
Located in Malheur County - on the Oregon-Nevada border
~35km west of the town of McDermitt at the northern end of the
McDermitt Volcanic Caldera
~35km north of Lithium Americas’ Thacker Pass Project (19.1Mt
LCE¹) which is under construction
History
Sept 2018 Jindalee completed an initial 4 hole drilling program,
intersecting broad widths of sediment host lithium mineralization.
A total of 62 holes (33 RC and 29 Diamond) have now been drilled
at McDermitt, with the Mineral Resource increasing after each
drilling program
Feb 2023 Jindalee announced an updated Indicated and Inferred
Mineral Resource for McDermitt
1.
2.
Tenure and
Resource
54.6km2 claims area
Features
McDermitt will be a low cost mining operation:
• Flat lying sediments with low strip ratio
• Ore is soft, amenable to low cost mining and crushing
• Excellent metallurgical recoveries
McDermitt is the largest lithium deposit in the US (by contained Li)
Indicated + Inferred Mineral Resource: 3.0 Bt @ 1,340ppm Li
(1,000ppm Li cut-off) for 21.5 MT LCE²
Refer to Lithium Americas TSX announcement 02/03/2023 “Lithium Americas to Develop US Sourced Lithium Production through $650 Million Equity Investment and Supply Agreement”
Refer to JRL ASX release 27/02/2023 “Resource at McDermitt increases to 21.5 Mt LCE”
McDermitt Mineral Resource Plan and Section
McDermitt Mineral Resource (2023)
Indicated Resource
Inferred Resource
Indicated and Inferred Resource
Cut-off
Grade
(ppm Li)
Tonnage
(Mt)
Li Grade
(ppm)
LCE
(Mt)
Tonnage Li Grade
(Mt)
(ppm)
LCE
(Mt)
Tonnage
(Mt)
Li Grade
(ppm)
LCE (Mt)
1,000
1,470
1,420
11.1
1,540
10.4
3,000
1,340
21.5
1,270
Summary of 2023 McDermitt Mineral Resource Estimate at the reporting cut-off of 1,000ppm (totals may vary due to rounding)
Schematic section with completed drilling and schematic conceptual Pit Shell 6 (0-43 years)
Refer to JRL ASX release 27/02/2023 “Resource at McDermitt increases to 21.5 Mt LCE”
Plan view of the 2023 Mineral Resource (at 1523mRL), completed
drilling, Section C-C’ and schematic conceptual Pit Shells 5 and 6
McDermitt Exploration Target and Upside
McDermitt Exploration Target Range (2023)
Cut-off Grade
(ppm Li)
Lower Limit
(Mt)
Upper Limit
(Mt)
Grade Range
(ppm Li)
Midpoint LCE
(Mt)
1,000
300
700
1,100 – 1,400
3.3
Summary of 2023 McDermitt Exploration Target Range at cut-off of 1,000ppm.
LCE calculated using the midpoint of the range
Cautionary Statement
The Exploration Target has been prepared and reported in accordance with the 2012
edition of the JORC Code. The potential quantity and grade of the Exploration Target is
conceptual in nature. There has been insufficient exploration to estimate a Mineral
Resource for all target areas reported. It is uncertain if further exploration will result in the
estimation of a Mineral Resource.
Refer to ASX release 21/11/2023, “Exploration Target Highlights Further Upside at McDermitt”
Metallurgy
Metallurgical Testwork
• March 2023 review determined Beneficiation + Acid Leaching delivers best financial outcome
• Very large MRE allows flexibility with potential to develop higher grades early in life of Project
• Jindalee geologists have identified 4 Units (4, 6, 8 and 10) carrying elevated Li values
• Samples from Units 4, 6, 8 and 10 within Indicated portion of conceptual Pit Shell 6 (nominal 43
Years) submitted for testwork late July 2023
• Head assays from a composite sample of these Units averaged 1,790 ppm Li (34% higher than
average MRE grade of 1,340 ppm Li)
• Beneficiation of the composite sample via attrition scrubbing (at 250 µm cut) further increased the
average grade to 2,107 ppm Li (57% higher than MRE grade)
• Beneficiation at 250 µm recovered 92.0% of Li to leach feed and rejected 23.5% of the mass
• Initial acid leaching of beneficiated samples to feed into PFS is now underway; samples also being
beneficiated for POSCO to test under MOU
• Excellent scope to improve on results with variable attrition times, cut sizes and scrubbing
Environment
Environmental and Social Responsibility
• Jindalee takes responsibility to the environment and the local community very seriously
• We employ a dedicated team of highly experienced environmental consultants to help manage all aspects of our
licence to operate
• Extensive environmental and cultural baseline studies commenced in 2022, with no red flags noted
Measures to minimise our impact on the environment and community include:
• Restricting drilling programs to summer and autumn to reduce impact on fauna and ranching activities
• Cultural resource surveys undertaken before drilling
• Drilling on existing cleared areas (tracks, fencelines) wherever possible
• Drillholes plugged on completion and disturbed areas rehabilitated and re-seeded
• Preference given to local contractors and services, where available
• Building internal capacity for community engagement in the US
Comparable Sediment Hosted Lithium Deposits
Jindalee is undervalued with our peers
Deposit
Owner
COG
(ppm Li)
Market Cap.
(A$m)
McDermitt
Jindalee
1000
65
Thacker Pass
TSX:LAC
1047
1,757
Sonora
Ganfengº
1000
N/A
Clayton Valley
TSX:LCE
900
110
Rhyolite Ridge
ASX:INR
1090/
5000 B*
1,757
Tonopah
TSX:LI
1000
385
Big Sandy
ASX:AZL
800
154
Market capitalisations as at: 20/11/2023
(ºBCN acquired by Ganfeng 26/01/2022;
*deposit includes B credits)
Source: various company reports. Refer Appendix 1 for detailed information
Milestones 2023
Jan 2023
Australian assets spun-out via Dynamic Metals (ASX:DYM)
Feb 2023
Major Resource update announced, MOU with POSCO announced
Mar 2023
Metallurgical Testwork underway (managed by Fluor)
May 2023
Exploration Plan of Operations (EPO) deemed complete by Bureau of Land Management (BLM)
June 2023
PFS commenced (managed by Fluor); JRL Study Manager appointed
Nov 2023
Initial Testwork results, Exploration Target announced
De-risking is Ongoing
• Building and strengthening management team, both in the US and Australia
• Engagement with US Government agencies, end users and strategics accelerating
• Geological, metallurgical, engineering and environmental baseline studies continues
• Completion of PFS - targeting mid 2024
Thank you
Further information
Lindsay Dudfield
Executive Director
email: enquiry@jindalee.net
phone: +61 8 9321 7550
Additional information
Competent Person Statement
References
The Exploration Results and Mineral Resource estimates referred to in this presentation
were first reported in accordance with ASX Listing Rules 5.7 and 5.8 in the
announcements as cross-referenced. The Company confirms that it is not aware of any
new information or data that materially affects the information included in the relevant
market announcements and, in the case of the Mineral Resource estimates, that all
material assumptions and technical parameters underpinning the estimates in the
relevant market announcement continue to apply and have not materially changed.
•
21/11/2023, “Exploration Target Highlights Further Upside at McDermitt”
•
16/11/2023, “Becoming a substantial shareholder”
•
15/11/2023, “Exceptional Metallurgical Results from McDermitt”
•
31/10/2023, “Quarterly Cashflow Report” and “Quarterly Activities Report”
•
31/10/2023, “Priority Offer Raises $.6 Million”
•
23/10/2023, “First Results from Metallurgical Testwork at McDermitt”
•
19/10/2023, “Public Offer to Close Early - $3.5 Million Raised”
•
16/10/2023, “$5.5M Capital Raising to Advance McDermitt Lithium Project”
•
09/10/2023, “Drilling to Commence at McDermitt Lithium Project”
•
12/07/2023, “Notification regarding unquoted securities – JRL”
•
07/06/2023, “Fluor Appointed Lead Engineer for McDermitt Project”
•
16/05/2023, “McDermitt Progress Update”
•
24/03/2023, “Preferred Lithium Extraction Process for McDermitt Project”
•
27/02/2023, “Resource at McDermitt increases to 21.5 Mt LCE”
•
13/02/2023, “MOU Executed with POSCO Holdings”
Appendix 1: Peer Comparison Data
Comparable North American Sediment Hosted Lithium Deposits
Deposit
Owner
Stage
Resource Category
Resource
(Mt)
Grade
(ppm Li)
Contained
LCE (Mt)
Source
Thacker Pass
TSX:LAC
FS Complete
Measured, Indicated &
Inferred
1,754
2039
19.1
Company website – Feasibility
Study November 2022
DFS Complete
Measured, Indicated &
Inferred
Rhyolite
Ridge
ASX:INR
Company website –
announcement 26 April 2023
360
1750
3.4
559
2962
8.8
Bacanora Lithium website –
announcement January 2018
Sonora
Ganfeng
PFS Complete
Measured, Indicated &
Inferred
McDermitt
ASX:JRL
PFS underway
Indicated & Inferred
3,000
1340
21.5
Company website –
announcement February
2023
Clayton
Valley
TSXV:LCE
PFS Complete
Measured, Indicated &
Inferred
1,030
1055
5.8
Company website –
announcement August 2020
PEA Complete
Measured, Indicated &
Inferred
3.4
Company website – Preliminary
Economic Assessment January
2023
Tonopah
Big Sandy
TSXV:LI
ASX:AZL
Scoping Study
Indicated & Inferred
534
33
1219
1850
0.3
Company website –
presentation November 2022