Quarterly Activities Report - June 2026
Released
Released
Announcement PDF
Jindalee Lithium Limited www.jindaleelithum.com
ABN 52 064 121 133 E: enquiry@jindaleelithium.com
Level 2, 9 Havelock Street, West Perth, WA, 6005 P: +61 9321 7550
PO Box 1033, West Perth, WA 6872 F: +61 9321 7950
JLL
Engage with this announcement at the Jindalee Investor Hub
US LITHIUM
McDermitt Lithium Project (Jindalee 100%)
Jindalee Lithium Limited’s (Jindalee, or the Company; ASX: JLL, OTCQX: JNDAF) 100% owned McDermitt
Lithium Project (McDermitt or the Project) is located approximately 35km west of the town of McDermitt,
straddling the Oregon and Nevada border in the United States of America (US).
In mid-November 2024 Jindalee announced the results of a Pre-Feasibility Study (PFS) on the McDermitt
Project, one of the largest lithium deposits in the US and of global significance1. The PFS confirmed a 63 year
life with the Project producing 1.8Mt Lithium Carbonate at C1 costs of US$8,670/t for the first 40 years, with
a 5 year payback. The PFS also noted excellent potential to reduce capital and operating costs through
process optimisation and potential production of by-products (including magnesium) at McDermitt.
Magnesium – a Strategic Value Creation Opportunity at McDermitt
China currently controls ~90% of global magnesium supply2 and magnesium has been officially designated
a high-risk critical mineral by the US Government3,4, alongside lithium. Magnesium’s high strength-to-weight
ratio and durability make it critical for defence, aerospace and automotive industries, where it is widely used
in aerospace alloys, military vehicles and countermeasure flares. Furthermore, US Magnesium LLC,
previously the only US domestic producer of primary magnesium filed for Chapter 11 bankruptcy protection
in September 20255 leaving the US supply chain increasingly exposed to disruption.
JNDAF
31 July 2026
QUARTERLY ACTIVITIES REPORT
• S-4 Registration to list McDermitt on NASDAQ via US Elemental lodged June 2026;
proposed transaction implies a pro-forma enterprise value of US$571M
• Jindalee shareholders approve US Elemental transaction with listing targeting Q4 2026
• MoU signed with RESOLVE to explore a voluntary conservation area near McDermitt, with
funding linked to Project development milestones
• Placement and entitlement offer raises $10.9M to fund McDermitt drilling and ongoing
metallurgical testwork (magnesium and lithium) and support the US Elemental listing
• Drilling program expected to commence in September 2026, with preparatory work well
advanced
• Evaluation of new growth opportunities to complement Jindalee’s existing asset base and
support ongoing shareholder value creation continued during the period
Quarterly Activities Report – June 2026
In October 2025 Jindalee commenced a value-optimisation program ahead of the McDermitt Feasibility Study
to assess options for recovering and monetising magnesium streams previously assumed to be discarded in
the PFS, with the aim of positioning McDermitt as a potential dual-product project aligned with US
critical-minerals priorities6. As part of this program, approximately 100 kg of leachate was shipped in January
2026 to Kemetco Research Inc. for magnesium-focused testwork7, and in April 2026 Jindalee announced that
fertiliser-grade magnesium sulphate (MgSO₄, Epsom salt) had been successfully produced from this
leachate8. The Company is now evaluating downstream processing routes and flowsheet configurations to
produce higher-value magnesium compounds, including potential precursors for primary magnesium metal.
This testwork progressed significantly during the quarter and is now well advanced. Results are currently
being finalised and interpreted, and the Company expects to provide an update to the market regarding initial
results and the scope of any further expected workstreams in Q3 2026.
If commercially viable, these pathways would allow McDermitt to deliver battery-grade lithium carbonate
and contribute to US domestic magnesium supply from the same project, with magnesium options to be
advanced and assessed in parallel with lithium based on capital efficiency, market demand and overall
project economics.
Permitting and EPO Drilling Program
The Exploration Plan of Operations (EPO) for McDermitt was approved by the US Bureau of Land
Management (BLM) on 8 December 20259 after completing the environmental review process required
under the National Environmental Policy Act and extensive public review and comment. Approval of the EPO
is a major milestone for the Project and allows Jindalee to significantly increase on‑site activity.
In late April 2026 a lawsuit was filed in the United States District Court in Oregon by US environmental non-
profit organisations challenging the BLM’s 8 December 2025 Decision Record approving the EPO10. The
proceedings, in substance, allege that the BLM did not undertake sufficient environmental review of certain
impacts in approving the EPO. The Company, through its subsidiary HiTech Minerals Inc. (HiTech), has been
granted leave to intervene in the proceedings in support of the BLM in defence of the Decision Record. The
EPO authorises a temporary exploration program only and does not approve mining operations. No request
for a preliminary injunction has been filed and no court order has been made staying or suspending activities
under the EPO; accordingly, the proceedings do not prevent activities from continuing in accordance with
the EPO. The Company is confident in the robustness of the BLM’s multi-year environmental review process
and will continue to update the market as required. Similar challenges by non-profit organisations are not
uncommon in US federal permitting processes.
Notwithstanding the proceedings, activities under the EPO continue to advance. State-level permits for the
EPO drilling program are well advanced and are expected ahead of drilling currently scheduled to commence
in September 2026, with preparatory activities underway. The program will be staged, with Phase 1 to
comprise infill drilling (up to 100 reverse circulation and core holes) designed to upgrade resources
(currently JORC Indicated and Inferred status1), provide fresh samples for geotechnical studies and
metallurgical testwork, and collect environmental information (including hydrological data) to support the
McDermitt feasibility study, with further updates to be provided ahead of drill rig mobilisation.
RESOLVE MoU and Community Consultation
On 22 June 2026 Jindalee advised that its wholly owned US subsidiary, HiTech had signed a Memorandum of
Understanding (MoU) with RESOLVE, Inc. (RESOLVE), an independent, nonpartisan, nonprofit
organisation11.
RESOLVE has extensive experience convening stakeholders and rightsholders on complex environmental,
natural-resource and social challenges, including responsible mineral supply chains, critical minerals,
biodiversity outcomes and land conservation.
Quarterly Activities Report – June 2026
The MoU establishes a framework for HiTech and RESOLVE to explore the creation of a voluntary
Stewardship Area in the broader Oregon-Nevada caldera region, where HiTech is advancing the McDermitt
Lithium Project.
The Stewardship Area is intended to support improved environmental outcomes for high-value habitat areas,
alongside HiTech’s advancement of responsible domestic lithium development in the McDermitt Caldera.
Under the MoU, HiTech and RESOLVE expect to engage with stakeholders and rightsholders in the region to
identify potential land areas that may warrant investment, protection, restoration or other stewardship
measures. HiTech will consider funding part of these stewardship measures agreed through the process
subject to meeting McDermitt Lithium Project development milestones.
Any voluntary stewardship measures identified through this process would be in addition to, and not a
substitute for, HiTech’s obligations under applicable environmental laws, permitting processes, other benefit
agreements and regulatory requirements. The MoU does not create any binding commitment to a specific
funding amount, land area, stewardship outcome or regulatory result.
US Government Support
2026 has been an active year for US critical minerals policy, with momentum continuing to build behind
efforts to accelerate and fund the development of domestic supply chains. Building on the groundwork laid
in late 2025 – including the bipartisan US House Select Committee on China report (November 2025)12 – the
US Government has moved during 2026 from policy framing to concrete support. This has included the
President’s January 2026 executive order on critical minerals supply chains13, the February 2026
establishment of Project Vault – a US Strategic Critical Minerals Reserve backed by a US$10 billion loan from
the Export-Import Bank of the United States14 (EXIM) and successive Department of Energy (DOE) funding
rounds, among them a Notice of Funding Opportunity of up to US$500 million earlier in the year to expand
domestic critical minerals processing and battery materials manufacturing and recycling15. During the June
2026 quarter this momentum continued, with the US Government advancing several further initiatives that
reinforce its framing of critical minerals, including lithium, as a national security priority.
In June and July 2026, the US DOE Office of Critical Minerals and Energy Innovation announced further
funding to build domestic critical minerals capacity. On 2 June 2026, the DOE announced US$134 million for
two projects to demonstrate the commercial viability of recovering rare earth elements (REEs) from
unconventional feedstocks16, including mine tailings and other industrial waste. On 1 July 2026, the DOE
announced US$75 million for five pilot-scale projects using coal and coal-based feedstocks to produce rare
earths and other critical minerals17.
On 2 July 2026, the Defense Logistics Agency (DLA), the division of the US Department of Defense responsible
for the National Defense Stockpile, published a solicitation seeking offers for approximately 36 million
pounds (around 16,000 tonnes) of battery-grade lithium carbonate over five years, in a contract worth up to
US$300 million18. While the volumes are modest relative to global lithium demand, the solicitation
represents a substantial new effort to add battery‑grade lithium carbonate to the US National Defense
Stockpile and forms part of an escalating US strategy to build strategic lithium reserves, reduce reliance on
China and secure non‑Chinese, battery‑grade supply19.
On 20 July 2026, the President signed a further executive order, “Securing America’s Defense Supply Chains
and Ensuring Domestic Acquisition of Critical Materials”20, establishing that critical materials and
components required for US military equipment should be sourced domestically or from allied nations,
tightening defence supply chains, restricting waivers and requiring supply-chain mapping. Taken with the
initiatives above, these developments continue to strengthen the policy backdrop for US-based critical
minerals developers advancing strategic domestic projects such as McDermitt.
As one of the largest lithium resources in the US and located on federal lands, McDermitt is well positioned
within this policy backdrop. A Cooperative Research and Development Agreement (CRADA) with the DOE’s
Quarterly Activities Report – June 2026
Office of Energy Efficiency and Renewable Energy, signed in September 202421, and McDermitt’s designation
in April 2025 as one of the first ten resource projects under the US Federal Government’s FAST-41 initiative22,
provide an enhanced platform for engagement with US agencies on permitting and potential funding
pathways. During the June 2026 quarter, the Company continued to engage with relevant US Government
departments and programs in relation to opportunities aimed at co-funding the McDermitt feasibility study
and associated workstreams.
Clayton North Project (Jindalee 100%)
Jindalee’s 100% owned Clayton North Project is located in southwest Nevada, approximately 23km north of
Albermarle’s (NYSE: ALB) Silver Peak brine operation, which is currently the only domestic source of lithium
in the US.
“Proof of concept” drilling undertaken by Jindalee in 2021 returned anomalous lithium results from fine
grained sediments intersected in hole CNDD01223 including:
• 6.1m @ 1093 ppm Li from 24.4m (including 3.05m @ 1205 ppm Li from 27.4m), and
• 11.2m @ 1006 ppm Li from 33.6m.
Follow-up drilling at Clayton North to investigate these encouraging initial results is under consideration.
INDUSTRY DEVELOPMENTS
Battery‑grade lithium carbonate prices staged a strong recovery over the year to 30 June 2026. After
bottoming near US$8,300/t in June 2025, prices rallied to a two‑year high of approximately US$29,000/t in
May 2026 before easing to around US$23,000/t by quarter‑end24 – still approximately 180% above the 2025
low. The rally was driven by tightening inventories, production curtailments and accelerating demand from
electric vehicles (EV) and battery energy storage systems (BESS), while the mid‑year pullback reflected
expectations around supply restarts25. Despite the softer near‑term tone, leading banks remain constructive
on the sector’s structural outlook26.
Critically, the composition of lithium demand is shifting rather than softening. Although EV growth has
moderated in some markets – notably the US following the expiry of the federal consumer tax credit – global
EV sales still grew around 7% year‑on‑year in the first half of 202627, with strong BESS demand acting to
offset the slower EV pace (details below). J.P. Morgan expects BESS to rise to around 30% of global lithium
demand in 2026, up from a negligible share three years ago28, establishing a durable new demand driver that
did not exist in the prior cycle.
The BESS backdrop continues to strengthen. Global BESS installations reached a record 125.8 GWh in H1
2026, up around 27% year‑on‑year29, building on 2025's more‑than‑50% expansion to over 320 GWh30. In
the US, McDermitt's target market, installations hit a record 9.7 GWh in the March 2026 quarter
(SEIA/Benchmark), up 32% year‑on‑year31, and Wood Mackenzie and the American Clean Power Association
expect cumulative US storage capacity to nearly quadruple to around 200 GW / 655 GWh by 203132,
underpinned by grid modernisation and accelerating AI data‑centre load.
This demand backdrop has tightened the supply outlook. After two years of surplus, the global lithium market
is widely expected to move into deficit in 2026, with Morgan Stanley forecasting a shortfall of around 80,000
tonnes lithium carbonate equivalent (LCE) and UBS a more conservative deficit of approximately 22,000
tonnes28. J.P. Morgan continues to expect the market to remain in deficit through 2030.
At the same time, the US remains strategically exposed to highly concentrated supply chains. Recent lithium
flow analysis by iLi Markets33 outlines that in 2025 almost 90% of lithium extracted globally was ultimately
consumed in, or passed through, China when production and imports are combined, even though China
mined only around 20% of global lithium output, underscoring the concentration of processing and chemical
capacity in a single jurisdiction. This reinforces ongoing efforts by the US and allied governments to diversify
Quarterly Activities Report – June 2026
lithium chemical production and develop secure domestic supply, providing a supportive backdrop for large,
US based sediment hosted projects such as McDermitt and the proposed NASDAQ listed US Elemental Inc.
(US Elemental) platform.
AUSTRALIA
Sherlock (Jindalee 20%)
The Sherlock Project comprises one Exploration Licence (E47/4345) centred approximately 75km east of
Karratha in Western Australia. The Project is a joint venture with Sabre Resources (ASX: SBR) (Sabre), with
Jindalee’s 20% interest free carried to completion of a Bankable Feasibility Study.
E47/4345 surrounds M47/567 which is owned by Sabre and contains the Sherlock Bay nickel-copper-cobalt
mineral resource (24.6Mt @ 0.40% Ni, 0.09% Cu & 0.02% Co)34. The Sherlock Bay deposit is located on the
Scholl Shear Zone (SSZ) which extends onto E47/4345 with the joint venture exploring for repetitions of the
Sherlock Bay mineralisation along the SSZ. No work was reported by Sabre during the period.
New Projects
Since listing on ASX in 2002 Jindalee has successfully acquired and advanced undervalued assets and realised
them at an appropriate time for the benefit of shareholders. Examples include the spin-out of Jindalee’s
uranium projects via Energy Metals (ASX: EME) in 2005, the spin-out of Jindalee’s Australian assets via
Dynamic Metals (ASX: DYM) in 2024 and the proposed NASDAQ listing of its US lithium projects via US
Elemental in 2H 2026.
The Company intends to build on its experience and track record as a project generator and has commenced
reviewing opportunities with the potential to deliver outsized returns for shareholders in the medium term.
CORPORATE
SPAC Transaction
In April 2026 Jindalee announced that its wholly owned US subsidiary, HiTech had entered into a binding
Business Combination Agreement (BCA) with Constellation Acquisition Corp. I (Constellation) (OTCPK:
CSTAF), a US special purpose acquisition company (SPAC) sponsored by an affiliate of Antarctica Capital, LLC
(Antarctica) (the Transaction)35. The Transaction will establish newly formed US Elemental Inc. as a
NASDAQ listed company traded under the ticker “ULIT” holding Jindalee’s US assets, with HiTech becoming
a wholly owned subsidiary of US Elemental and US Elemental owning the McDermitt Lithium Project. The
current and proforma corporate structures for Jindalee, US Elemental, HiTech and the McDermitt Project are
shown in Figure 1. The Transaction is intended to position Jindalee’s US assets within a US‑domiciled,
US‑listed platform to improve access to US capital markets and critical minerals policy support, while
Jindalee retains majority exposure to the McDermitt Project.
The BCA implies a proforma enterprise value for US Elemental of approximately US$571 million, including
an implied equity valuation of US$500 million for Jindalee’s US assets35, with Jindalee expected to retain a
majority interest of 80% or more in US Elemental at completion, subject to customary adjustments including
financing outcomes and Constellation shareholder redemptions. The Transaction also contemplates a capital
raise of approximately US$20–30 million in a Private Investment in Public Equity (PIPE), including a binding
cornerstone US$4 million commitment from an affiliate of Antarctica, of which approximately US$1.5 million
was funded on signing of the BCA and a further US$2.5 million is committed to be funded at completion
pursuant to a separate funding agreement. Proceeds are expected to fund transaction costs, US Elemental
working capital and McDermitt activities, including a large infill drilling program and feasibility study work
streams.
Quarterly Activities Report – June 2026
Pathway to Completion
Completion of the Transaction is subject to the satisfaction (or, where applicable, waiver) of a defined set of
customary regulatory and closing conditions. These comprise approval by Constellation shareholders,
approval by Jindalee shareholders (completed), NASDAQ listing approval, receipt of applicable regulatory
approvals, effectiveness of the relevant US registration statement, satisfactionof the minimum cash condition
of US$14 million, net of certain transaction expenses (which may be waived by Jindalee), and the absence of
material adverse change events. Within this framework, effectiveness of the US registration statement (Form
S-4) is expected to represent the critical path to completion36, as it must be declared effective before the
Constellation shareholder vote can be convened and the Transaction can proceed to closing. The S-4 serves
as the combined registration statement and proxy statement/prospectus and contains comprehensive
disclosure about US Elemental, the Transaction terms, financial statements, risk factors and McDermitt.
Progress During and Subsequent to the Quarter
The Company made strong progress advancing the Transaction over the period. On 2 June 2026 the Company
announced that the S‑4 had been lodged with the US Securities and Exchange Commission (SEC)36 – a
significant milestone on the critical path. Its preparation required completion of PCAOB standard audits of
HiTech (the US public company audit standard required for a NASDAQ listing), as well as a US standard S‑K
1300 technical report for the McDermitt Project, and its filing commenced the SEC review process. That
review typically involves the SEC issuing written comments, followed by company responses and, where
appropriate, amended filings, before the S‑4 is declared effective; once effective, the proxy/prospectus can
be dispatched to Constellation shareholders and the shareholder vote convened. On 30 June 2026, Jindalee
shareholders overwhelmingly approved the Transaction at a General Meeting for the purposes of ASX Listing
Rule 11.437, satisfying a key condition precedent. Throughout the quarter the Company continued to market
the Transaction and associated PIPE to selected US investors, including investor marketing in New York in
late June 2026, with feedback remaining positive and PIPE conversations progressing in support of the
minimum cash condition.
Subsequent to the end of the quarter, in late July 2026, the Company received initial comments from the SEC
on the S‑4 and is working through those comments, with an amended S‑4 expected to be filed in mid‑August
2026, further advancing the critical path toward effectiveness. Also in late July 2026, US Elemental submitted
its NASDAQ listing application, advancing a further condition precedent to completion. The Transaction
remains on track to close in the second half of 2026.
Further details of the Transaction, including key terms of the BCA and the associated funding arrangements,
are set out in Jindalee’s ASX release dated 9 April 2026 titled “Jindalee Signs BCA to List McDermitt on
NASDAQ”35.
Quarterly Activities Report – June 2026
Figure 1 – Proposed Change in Corporate Structure35
Capital Structure and Funding
On 8 May 202638 the Company advised that it had received firm commitments to raise approximately A$8.4M
(before expenses) via the issue of approximately 18.3 million new fully paid ordinary shares (Shares), at an
issue price of A$0.46 per Share, under a strongly supported private placement to sophisticated, professional
and institutional investors (Initial Placement). The Company also advised that it would seek shareholder
approval under ASX Listing Rule 10.11 to issue 130,437 Shares (on the same terms as the Initial Placement)
to the Company’s directors (Conditional Placement), with the Initial Placement and Conditional Placement
(together, the Placement) to raise a total of approximately A$8.5M before expenses through the issue of
approximately 18.5 million Shares.
Participants in the Placement also received one (1) option to acquire one (1) Share for every one (1) Share
issued under the Placement for nil additional consideration (Attaching Options) with an exercise price of
A$0.60 and an expiry date of 30 June 2029.
In parallel with the Placement, Jindalee’s Board resolved to undertake a non-renounceable entitlement offer
to raise up to a further A$2.5M before expenses (Entitlement Offer). Under the Entitlement Offer, Eligible
Shareholders were offered the opportunity to acquire one (1) Share for every nineteen (19) Shares, with the
Entitlement Offer conducted at the same issue price as the Placement, being A$0.46 per Share, with one
Attaching Option for every one Share issued, on the same terms as the Attaching Options proposed to be
issued under the Placement.
The Company also received commitments from investors to subscribe for A$1.2M of any shortfall under the
Entitlement Offer, and each member of the Board and executive management committed to take up their full
entitlement under the Entitlement Offer, representing approximately 1.0 million Shares and total Board and
executive participation of approximately A$0.47M. The Entitlement Offer closed on 12 June 2026, raising
approximately $2.4M in total39.
Quarterly Activities Report – June 2026
A General Meeting of Jindalee shareholders held 30 June 2026 overwhelmingly approved the US Elemental
Transaction, the participation of Jindalee directors in the Conditional Placement and the issue of broker
options, as well as ratifying the issue of the Placement shares37.
During the quarter 23,633,204 new Shares (and 23,633,204 attaching options) were issued pursuant to the
Placement and Entitlement Offer. In early July 2026 a further 130,437 Shares (and 130,437 attaching options)
were issued to the Company’s Directors and 1,847,824 broker options (with identical terms as the Attaching
Options) were issued to brokers and advisors who advised on the Placement, following shareholder approval
at the General Meeting.
Jindalee currently has approximately 126.2M shares on issue, with cash and listed securities at 30 June 2026
of approximately $14.0M.
FINANCIAL COMMENTARY
The Quarterly Cashflow Report for the period ending 30 June 2026 provides an overview of the Company’s
financial activities40.
Exploration and evaluation expenditure for the reporting period was $526k, primarily relating to cash costs
associated with preparation for upcoming drilling activities, together with ongoing metallurgical testwork.
Net corporate expenditure was $2,621k, including material costs related to the SPAC Transaction. The total
amount paid to directors of the entity and their associates in the period was $223k and includes directors’
fees, consulting fees and superannuation.
Authorised for release by the Jindalee Board of Directors.
For further information please contact:
IAN RODGER LINDSAY DUDFIELD
Managing Director & Chief Executive Officer Executive Director
T: + 61 8 9321 7550 T: + 61 8 9321 7550
E: enquiry@jindaleelithium.com E: enquiry@jindaleelithium.com
Quarterly Activities Report – June 2026
ADDITIONAL INFORMATION
Additional details including JORC 2012 reporting tables, where applicable, can be found in the ASX announcements
referenced in this report and announcements lodged with the ASX during the quarter:
References
1. Jindalee Lithium ASX announcement 19/11/2024: “McDermitt Lithium Project Pre-Feasibility Study”
2. https://www.semafor.com/article/11/17/2024/china-expands-export-controls-on-critical-minerals
3. https://pubs.usgs.gov/of/2025/1047/ofr20251047.pdf
4. https://www.energy.gov/cmm/what-are-critical-materials-and-critical-minerals
5. https://www.fox13now.com/news/local-news/northern-utah/us-magnesium-files-for-chapter-11-bankruptcy-as-utah-seeks-
to-shutter-operations
6. Jindalee Lithium ASX announcement 22/10/2025: “JLL to Explore High Value Magnesium By-Product at McDermitt”
7. Jindalee Lithium ASX announcement 23/01/2026: “Quarterly Activities Report – December 2025”
8. Jindalee Lithium ASX announcement 21/04/2026: “Quarterly Activities Report – March 2026”
9. Jindalee Lithium ASX announcement 11/12/2025: “US Government Approves Major Drilling Program at McDermitt”
10. Jindalee Lithium ASX announcement 29/04/2026: “Exploration Plan of Operations Update”
11. Jindalee Lithium ASX announcement 22/06/2026: “HiTech Minerals MoU with RESOLVE”
12. china-interim-report-on-price-manipulation-w.toc-compressed.pdf
13. New Executive Order Ties US Critical Minerals Security to Global Partnerships
14. https://exim.gov/news/project-vault
15. Energy Department Announces $500 Million to Strengthen Domestic Critical Materials Processing and Manufacturing |
Department of Energy
16. DOE’s Office of Critical Minerals and Energy Innovation Announces $134 Million To Bolster Rare Earth Element Supply Chains
17. DOE’s Office of Critical Minerals and Energy Innovation Awards $75 Million to Accelerate Critical Minerals and Materials
Recovery from Coal and Coal-Based Feedstocks
18. https://sam.gov/opp/849b61e4fa5a4185b62af60f88c6d54a/viewDLA lithium carbonate solicitation SP8000‑26‑R‑0021
19. https://www.eenews.net/articles/pentagon-seeks-300m-worth-of-lithium-to-stockpile/
20. The White House – Presidential Actions, Executive Order 14415 Title: “Securing America’s Defense Supply Chains and Ensuring
Domestic Acquisition of Critical Materials”
21. Jindalee Lithium ASX announcement 16/09/2024: “Jindalee Secures Strategic Agreement with US Department of Energy”
22. Jindalee Lithium ASX announcement 22/04/2025: “McDermitt Project Fast-Tracked Under US FAST-41 Initiative”
23. Jindalee Lithium ASX announcement 18/11/2021: “Drilling confirms Lithium at Clayton North”
24. Battery Grade Lithium Carbonate (incl VAT) – Shanghai Metal Market (SMM)
25. https://www.spglobal.com/energy/en/news-research/latest-news/metals/071326-trade-review-asian-lithium-may-ease-in-
q3-amid-expectations-of-higher-supply
26. https://fnarena.com/index.php/2026/07/21/material-matters-deep-dive-into-lithium-pullback/
27. https://electrek.co/2026/07/09/global-ev-sales-hit-2-million-in-june-and-the-us-falls-further-behind/
28. https://www.morningstar.com.au/markets/lithiums-rally-is-real-this-time-no-one-trusts-it
29. https://www.energy-storage.news/global-bess-deployments-soar-27-in-h1-2026-saudi-arabia-drives-figures-in-june/
30. https://www.ess-news.com/2026/01/20/global-bess-demand-jumps-51-in-2025-as-installations-top-300-gwh/
31. https://seia.org/news/largest-q1-on-record-for-energy-storage/
32. https://cleanpower.org/news/u-s-energy-storage-market-q1-2026-sets-records-across-sectors/
33. iLi Markets Lithium Quarterly Market Review April 2026
34. Sabre Resources ASX announcement 12/06/2018: “Resource Estimate Update for the Sherlock Bay Nickel-Copper-Cobalt
Deposit
35. Jindalee Lithium ASX announcement 09/04/2026: “Jindalee Signs BCA to List McDermitt on NASDAQ”
36. Jindalee Lithium ASX announcement 02/0