Annual Mineral Resources Statement
Released
Released
Announcement PDF
ASX RELEASE
29 SEPTEMBER 2023
ASX: JRL
OTC: JNDAF
ANNUAL MINERAL RESOURCES STATEMENT
Jindalee Resources Limited (Jindalee, the Company) is pleased to provide this annual review and summary of the
Company’s Mineral Resources as at 29 September 2023.
The Company’s Mineral Resources are reported in accordance with the 2012 JORC code and estimated or based on
documentation prepared by a Competent Person as defined by the 2012 JORC Code unless otherwise specified. All
information compiled in this statement has been previously announced and this statement fairly represents a summary
of the supporting information and documentation.
Jindalee ensures that the Mineral Resources quoted are subject to governance arrangements and internal controls.
Internal and external reviews of Mineral Resource estimation procedures and results are carried out by a team of
experienced technical personnel that is comprised of highly competent and qualified professionals. These reviews have
not identified any material issues.
The Company’s procedures for drilling, sampling techniques and analysis are regularly reviewed and audited by
independent experts. Assays are undertaken by independent, internationally accredited laboratories with a QA/QC
program delivering acceptable levels of accuracy and precision.
Material changes in the Company’s Mineral Resource from 1 September 2022 to 29 September 2023 were:
•
•
Increase and upgrade of the McDermitt Mineral Resource (Indicated and Inferred) in February 20231
Divestment of Joyners JV Project and Prospect Ridge Project via the spin-out of the Company’s Australian assets
to Dynamic Metals Ltd (ASX:DYM) (Dynamic)2
McDermitt Lithium Project: McDermitt Deposit – Mineral Resource Estimate
On 27 February 2023 Jindalee announced an updated Mineral Resource Estimate (MRE) at the McDermitt Lithium
Project (US). This updated MRE incorporates results from a 21 hole drilling program completed at McDermitt in October
2022 (Figure 1)1. The program was designed to increase confidence in the mineral resource to allow for conversion of
Inferred Mineral Resource to Indicated, as well as extending the deposit to the west. Significant widths of lithium
mineralisation were intersected, with highlights from the program3 including:
•
MDD025:
182.2m @ 1197ppm Li from 21.4m
•
MDD028:
131.6m @ 1219ppm Li from 21.9m
•
MDRC024:
68.6m @ 1669ppm Li from surface
•
MDRC025:
50.3m @ 1512ppm Li from surface
Cut-off
Grade
(ppm Li)
Indicated Resource
Tonnage
(Mt)
Li Grade
(ppm)
LCE (Mt)
Indicated and Inferred
Resource
Inferred Resource
Tonnage
(Mt)
Li Grade
(ppm)
LCE
(Mt)
Tonnage
(Mt)
Li Grade
(ppm)
LCE
(Mt)
1,000
1,470
1,420
11.1
1,540
1,270
10.4
3,000
1340
21.5
Table 1 – Summary of 2023 McDermitt Mineral Resource Estimate at 29 September 2023. Note: totals may vary due
to rounding.
Figure 1 – Plan view of the McDermitt Lithium Project with drill hole collars and 2023 Mineral Resource (at 1523mRL).
Comparison of 2022 and 2023 Mineral Resource
The 2023 combined Indicated and Inferred Mineral Resource update represents an overall increase (from 2022 4) in
tonnage of 65%, with a 2% decrease in grade for a 62% increase in contained lithium carbonate equivalent (LCE).
Importantly, the Indicated Mineral Resource increased (by tonnage) by 138% with an overall 131% increase in contained
LCE at this higher confidence classification (Table 2).
2022 Mineral Resource
Tonnage Li Grade
LCE
(Mt)
(ppm)
(Mt)
2023 Mineral Resource
Tonnage Li Grade
LCE
(Mt)
(ppm)
(Mt)
Tonnage
(Mt)
% Difference
Li Grade
(ppm)
LCE
(Mt)
Indicated
620
1,460
4.8
1,470
1,420
11.1
138%
-3%
131%
Resource
Inferred
1,200
1,310
8.4
1,540
1,270
10.4
27%
-4%
23%
Resource
Total
1,820
1,370
13.3
3,000
1,340
21.5
65%
-2%
62%
Table 2 – Comparison of 20224 and 20231 McDermitt Mineral Resource Estimates at the reporting cut-off of 1000ppm.
Note: totals may vary due to rounding
Changes in the Mineral Resource were due to extensional drilling along strike as well as the extension of Mineral
Resource classification from 120m below surface in the previous resource update to 200m below surface,
acknowledging the increase in the lithium price since completion of the previous resource update and that deeper
mineralisation could potentially be economic.
Authorised for release by the Board of Jindalee Resources Limited.
For further information please contact:
LINDSAY DUDFIELD
Executive Director and CEO
T: + 61 8 9321 7550
E: enquiry@jindalee.net
References:
Additional details including JORC 2012 reporting tables, where applicable, can be found in the following releases lodged
with ASX and available on the Company’s website (www.jindalee.net), and referred to in this announcement:
1.
2.
3.
4.
JRL ASX announcement dated 27/02/2023: “Resource at McDermitt increases to 21.5 Mt LCE”
JRL ASX announcement dated 13/01/2023: “Dynamic Metals Raises $7m in IPO - To List on ASX”
JRL ASX announcement dated 14/12/2022: “Outstanding final assays at McDermitt lithium project”
JRL ASX announcement dated 06/07/2022: “170% increase to Indicated Resource at McDermitt”
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the market announcements referred to above and that all material assumptions and technical parameters
underpinning the estimates of mineral resources referenced in the market announcement continue to apply and have
not materially changed.
About Jindalee
Jindalee Resources Limited (ASX: JRL) is a pure-play US lithium company focussed on the development of the giant
McDermitt Lithium Project (21.5 Mt LCE1), currently the largest lithium deposit in North America. The Company also
provides shareholders with indirect exposure to lithium, gold, base and strategic metals, iron ore, uranium and
magnesite in Australia through projects generated by the Company’s technical team.
Competent Persons Statement
The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on
information compiled by Mr Lindsay Dudfield and Mr Brett Marsh. Mr Dudfield is a director and shareholder of, and
consultant to, the Company and a Member of the Australasian Institute of Mining and Metallurgy and the Australian
Institute of Geoscientists. Mr Marsh is a consultant to the Company and an American Institute of Professional Geologists
(AIPG) Certified Professional Geologist and a Registered Member of the Society for Mining, Metallurgy & Exploration
(SME). Both Mr Dudfield and Mr Marsh have sufficient experience relevant to the styles of mineralisation and types of
deposits under consideration, and to the activity being undertaken, to qualify as Competent Persons as defined in the
2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Minerals Resources and Ore Reserves.’ Mr
Dudfield and Mr Marsh consent to the inclusion in this report of the matters based on this information in the form and
context in which it appears.
The information in this report that relates to the Mineral Resource Estimates for the McDermitt deposit is based on
information compiled by Mr Arnold van der Heyden, who is a Member and Chartered Professional (Geology) of the
Australasian Institute of Mining and Metallurgy and a Director of H&S Consultants Pty Ltd. Mr van der Heyden has
sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity
being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code). Mr van der Heyden consents to the inclusion
in this report of the matters based on this information in the form and context in which it appears.
The Company confirms that it is not aware of any further new information or data that materially affects the information
included in the original market announcements by Jindalee Resources Ltd (JRL) referenced in this report and in the case
of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates
in the relevant market announcements continue to apply and have not materially changed. To the extent disclosed
above, the Company confirms that the form and context in which the Competent Person’s findings are presented have
not been materially modified from the original market announcements
Forward-Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include but are not
limited to statements concerning Jindalee Resources Limited’s (Jindalee’s) current expectations, estimates and
projections about the industry in which Jindalee operates, and beliefs and assumptions regarding Jindalee’s future
performance. When used in this document, the words such as “anticipate”, “could”, “plan”, “estimate”, “expects”,
“seeks”, “intends”, “may”, “potential”, “should”, and similar expressions are forward-looking statements. Although
Jindalee believes that its expectations reflected in these forward-looking statements are reasonable, such statements
are subject to known and unknown risks, uncertainties and other factors, some of which are beyond the control of
Jindalee and no assurance can be given that actual results will be consistent with these forward-looking statements.
Share your feedback
Discover