Jindalee Lithium Limited (Jindalee, or the Company; ASX: JLL, OTCQX: JNDAF) is pleased to advise that high-
grade magnesium oxide (MgO or Magnesia) has been successfully produced from ore from the McDermitt
Lithium Project (McDermitt or the Project), one of the largest lithium deposits in the United States (US) and
of global significance1.
The result is an important proof of concept in Jindalee’s magnesium value-optimisation program. McDermitt
contains a substantial magnesium endowment1,2, and previous pre-feasibility study (PFS)-stage testwork
confirmed that magnesium can be efficiently extracted alongside lithium using sulphuric-acid leaching, with
extraction of up to 97.2% reported from representative mineralised units. The PFS nonetheless treated
magnesium as waste, removing it from the process as magnesium sulphate (MgSO₄) with no revenue credit
applied. This work demonstrates a potential route to convert that stream into MgO, an important feedstock
for primary magnesium metal production as well as a range of established industrial applications, including
refractories. Further testwork, engineering and commercial assessment are required to establish product
specifications, scalability and commercial viability at McDermitt.
Latest Testwork Results
Testwork undertaken by Kemetco Research Inc. (Kemetco) investigated producing MgO from MgSO4 brine
samples produced from McDermitt ore using the following two approaches:
• Adding carbonates to the brine to precipitate magnesium carbonate (MgCO3) followed by a
calcination stage to produce MgO
• Crystalising hydrated MgSO4 from the brine, followed by thermal conversion to anhydrous MgSO4
ahead of a reductive calcination stage to produce MgO
JNDAF
17 August 2026
Highly Encouraging Magnesium
Testwork Results from McDermitt
• Testwork converts MgSO₄ from McDermitt ore into high-purity MgO (93.4% equivalent MgO
content)
• Results establish an initial proof of concept for a potential higher-value magnesium by-
product at McDermitt
• MgO is an important feedstock for producing primary Magnesium (Mg) metal, designated a
high-risk critical mineral by the US Government
• Further testwork and studies will assess commercial viability, reagent recycling and
potential by-product economics
Highly Encouraging Magnesium Testwork Results from McDermitt
Both approaches produced MgO grades greater than 93%, with the highest grade being 93.4% MgO, while
conversion in the calciner for both approaches was very high with values reaching 99.95%.
The latest results provide a technical basis for Jindalee to assess whether a magnesium stream previously
treated as waste can instead be converted into potentially higher-value magnesium products. If viable,
McDermitt could contribute to strengthening US magnesium supply chains while creating an opportunity to
assess reagent recycling and a potential magnesium by-product credit while at the same time significantly
reducing long-term waste storage requirements and associated costs. No commercial viability or economic
benefit has yet been established.
Path to the Current Testwork
Jindalee completed the McDermitt PFS in November 2024. The PFS identified scope for process optimisation
and potential magnesium by-product recovery.
In October 2025, Jindalee commenced a value-optimisation program to assess options to recover and
monetise magnesium streams previously assumed to be discarded in the PFS.2 Approximately 100 kg of
leachate was sent to Kemetco in January 2026 for magnesium-focused testwork.3 In April 2026, Jindalee
reported successful production of fertiliser-grade MgSO₄ from this material and outlined its intention to
assess higher-value magnesium products.4
Magnesium – a Strategic US Supply-Chain Issue
Magnesium metal is important to US industrial, defence and advanced-manufacturing supply chains. Key
uses include aluminium alloys, automotive lightweighting, aerospace components, titanium production, steel
desulphurisation, military flares and other specialist applications.5
The US supply chain is exposed to substantial concentration and import risk, with China controlling
approximately 90% of global magnesium supply.6 US Magnesium LLC, previously the only domestic producer
of primary magnesium, ceased operations in 2022 and filed for Chapter 11 bankruptcy protection in
September 2025, leaving the US supply chain vulnerable to disruption.7 Magnesium metal is ranked in the
highest risk category of the 84 mineral commodities assessed in the US Geological Survey’s 2025 draft list of
Critical Minerals8 and is included on the Critical Materials List published by the US Department of Energy.9
Given McDermitt’s substantial magnesium endowment, the ability to produce MgO from McDermitt-derived
magnesium sulphate is strategically encouraging, offering a potential pathway to significantly de-risk the US
magnesium metal supply chain.
Independent Market Analysis Supports Product Strategy
Jindalee has commissioned preliminary independent market analysis to help inform its magnesium product
strategy and identify potential higher-value pathways for magnesium recovered at McDermitt.
The analysis supports MgO as a logical product for further evaluation: magnesia is the largest of the
magnesium compound markets by volume, spans refractory, industrial and environmental applications, and
the US is a net importer. This work has helped guide Jindalee’s current technical and commercial assessment
of magnesium-product pathways.
Next Steps
• Complete further market and engineering studies to assess the financial viability of producing
magnesium by-products, including operating cost impacts, capital efficiency, market demand and
overall project economics.
• Undertake additional testwork designed to further improve on these initial results.
• Update Mineral Resource estimate to include magnesium.
Highly Encouraging Magnesium Testwork Results from McDermitt
Further updates from these work programs are expected in Q4 2026.
Jindalee Managing Director and CEO Ian Rodger commented:
“These results are a significant technical step in assessing the magnesium opportunity at McDermitt. We have
demonstrated a potential pathway to convert magnesium from a stream treated as waste in the PFS into a
high-purity MgO product.
Magnesium is strategically important to US industrial and defence supply chains, yet the country remains
exposed to a concentrated and import-dependent supply base.
Given McDermitt’s substantial magnesium endowment, we believe this opportunity warrants further work.
It is too early to draw concrete conclusions on commercial viability or Project economics, but our next phase
will focus on completing the work necessary to decide whether a magnesium by-product will be incorporated
into the upcoming McDermitt Feasibility Study.
Subject to those studies, we are encouraged by the potential to evaluate reagent recycling and the
introduction of a material magnesium by-product credit at McDermitt.”
Authorised for release by the Jindalee Board of Directors. For further information please contact:
IAN RODGER LINDSAY DUDFIELD
Managing Director & Chief Executive Officer Executive Director
T: + 61 8 9321 7550 T: + 61 8 9321 7550
E: enquiry@jindaleelithium.com E: enquiry@jindaleelithium.com
References
1. Jindalee Lithium ASX announcement 19/11/2024: “McDermitt Lithium Project Pre-feasibility Study”
2. Jindalee Lithium ASX announcement 22/10/2025: “JLL to Explore High Value Magnesium By-Product at McDermitt”
3. Jindalee Lithium ASX announcement 23/01/2026: “Quarterly Activities Report – December 2025”
4. Jindalee Lithium ASX announcement 21/04/2026: “Quarterly Activities Report – March 2026”
5. Source: https://www.youtube.com/watch?v=WNdTMQt33qk (IMA Webinar: Magnesium in Aerospace & Defense
Applications)
6. https://www.semafor.com/article/11/17/2024/china-expands-export-controls-on-critical-minerals
7. https://www.fox13now.com/news/local-news/northern-utah/us-magnesium-files-for-chapter-11-bankruptcy-as-
utah-seeks-to-shutter-operations
8. https://pubs.usgs.gov/of/2025/1047/ofr20251047.pdf
9. https://www.energy.gov/cmm/what-are-critical-materials-and-critical-minerals
About Jindalee
Jindalee Lithium Limited (Jindalee) is an Australian company focused on developing the McDermitt Lithium Project, one of
the largest lithium resources in the US1. With 100% ownership and unencumbered offtake rights, Jindalee is strategically
positioned to support America’s energy security and domestic supply of critical minerals. In 2024 the Company completed a
Pre-Feasibility Study (PFS) confirming McDermitt’s scale, long-life, and low-cost production potential, with strong
engagement from US government agencies, including the Department of Energy and Department of Defense. As a deeply
undervalued lithium (and potentially magnesium) developer, Jindalee presents a compelling investment opportunity heading
into the next lithium market upcycle.
Competent Person’s Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr Lindsay Dudfield.
Mr Dudfield is a director and shareholder of, and consultant to, the Company and a Member of the Australasian Institute of
Mining and Metallurgy and the Australian Institute of Geoscientists. Mr Dudfield has sufficient experience relevant to the
styles of mineralisation and types of deposits under consideration, and to the activity being undertaken, to qualify as a
Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Minerals
Resources and Ore Reserves.’ Mr Dudfield consents to the inclusion in this report of the matters based on this information in
the form and context in which it appears.
Highly Encouraging Magnesium Testwork Results from McDermitt
The Company confirms that it is not aware of any further new information or data that materially affects the information
included in the original market announcements by Jindalee Lithium Limited referenced in this report and in the case of
estimates of Mineral Resources, production targets and Ore Reserves, that all material assumptions and technical parameters
underpinning the estimates in the relevant market announcements continue to apply and have not materially changed. To the
extent disclosed above, the Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the original market announcements.
Forward-Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include but are not limited to
statements concerning Jindalee’s current expectations, estimates and projections about the industry in which Jindalee
operates, and beliefs and assumptions regarding Jindalee’s future performance. When used in this document, the words such
as “anticipate”, “could”, “plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”, “should”, and similar expressions
are forward-looking statements. Although Jindalee believes that its expectations reflected in these forward-looking
statements are reasonable, such statements are subject to known and unknown risks, uncertainties and other factors, some
of which are beyond the control of Jindalee and no assurance can be given that actual results will be consistent with these
forward-looking statements.
Annexure A:
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.
• Diamond drilling was used to collect HQ triple tube (HQ3 63.5mm)
diameter core.
• Core was cut and quarter core sampled on 1.5m intervals or
lithological and/or alteration boundaries.
• Colluvium/overburden was not sampled.
• All samples were placed into individually labelled, consecutively
numbered sample bags.
• Metallurgical test work samples were a composite sample of quarter
core or coarse rejects from the previously conducted geochemical
assaying and are believed to be representative of the interval under
investigation.
• The samples (approximately 700kg total) came from holes MDD004,
MDD006, MDD012, MDD018, MDD023 and MDD026 with samples
taken from Units 4, 6, 8 and 10 within the Indicated portion of
conceptual Pit Shell 5 (nominal 0-20 years).
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
• Diamond drilling was used to collect HQ3 (63.5mm) diameter core.
• Core holes were drilled vertically, and core was not oriented.
Drill sample
recovery
• Method of recording and assessing core and chip sample recoveries
and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
• Core blocks inserted by the drilling company indicated the length of a
run and the amount of recovered core in feet. The site geologist
converted this to metres and core recovery was recorded on the
sampling sheet. Core recovery was the primary focus for the drill
contractor and was typically >90% in the zones of interest.
• Core recovery was recorded by the site geologist, and 1m downhole
depths marked prior to geological logging and sampling.
• No relationship between recovery and grade was observed, no core
loss was observed over the interval under investigation.
Criteria JORC Code explanation Commentary
Logging • Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
• Qualitative lithological descriptions were recorded by the field
geologist once core had been presented and depths marked.
Correlation of this information to the field mapping and stratigraphic
sections described in the immediate area is ongoing to build a
comprehensive picture of the geology over the project area.
• Photos (wet and dry) were taken of all core trays for later review.
Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half or all core
taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of the
in-situ material collected, including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material
being sampled.
• Core was cut, and quarter core sampled over 2m intervals.
• The samples were individually crushed to 70% passing less than
2mm, and 500g sub samples were riffle split off by ALS Laboratories
in Reno, Nevada with the remaining samples (coarse residues)
averaging approximately 1.7kg each.
• Quarter core and the coarse residue samples from ALS Laboratories
were forwarded to Hazen Research Inc. in Golden, Colorado (Hazen)
where they were crushed to 100% passing 1.7mm before compositing
to be used for metallurgical testwork including acid leaching, prior to
production of lithium carbonate from the leachate.
• In January 2026 approximately 100kg of the leachate was shipped
from Hazen to Kemetco Research Inc. in Richmond, British Columbia,
Canada (Kemetco) for the testwork documented in this
announcement.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
• Samples were originally assayed by ALS Laboratories in Reno,
Nevada via a 4-acid digest of a 0.25g sample split with a 48 element
ICP-MS finish as previously reported.
• Hazen analysed the head sample for Li and a range of other
elements (including Mg) using 4-acid digest and peroxide fusion
digest with the digested solution analysed by ICP-OES.
• Laboratory QAQC involves the use of internal lab standards, splits
and replicates as part of in-house procedures. Both Hazen and
Kemetco participate in numerous external umpire assessments to
maintain high levels of QAQC in relation to their peers.
Verification of
sampling and
assaying
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
• Assay results were verified by more than one Jindalee geologist.
• Data from Hazen and Kemetco is received and stored electronically.
To date no .pdf certificates have been received for the assays
completed by either Hazen or Kemetco.
Criteria JORC Code explanation Commentary
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
Location of
data points
• Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Drill hole locations were surveyed using a handheld Garmin GPS with
an accuracy of +/- 3m horizontally, and +/- 5m vertically; hole
positions were also checked against a Digital Elevation Model (DEM),
and subsequently resurveyed using a DGPS.
• Locations are reported in metres NAD83 Zone11.
• Downhole surveys were undertaken at approximately 30m intervals
downhole and at the end of hole. The maximum variation from vertical
observed was 1.7°, typically <0.5°, with a survey accuracy of +/- 0.1°.
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and
classifications applied.
• Whether sample compositing has been applied.
• Spacing of drilling and associated sampling is adequate for
assessment of the areas and geological horizon(s) of interest.
• An Indicated and Inferred Mineral Resource has been estimated for
the McDermitt Project (refer Jindalee’s ASX announcement dated 27
February 2023 for further details).
• Sample compositing was undertaken for metallurgical test work as
described above.
Orientation of
data in
relation to
geological
structure
• Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
• If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
• Vertical drill holes were appropriate for assessing the flat lying units of
interest. Downhole lengths reported are therefore the same as true
widths.
Sample
security
• The measures taken to ensure sample security. • Samples were collected by qualified geological consultants engaged
by Jindalee and stored on site in locked sample storage bins provided
by ALS Laboratories, who then collected the bins and transported
them to their facilities in either Reno or Elko, USA.
• Metallurgical samples were sent from ALS Laboratories in Reno,
Nevada to Hazen in Golden, Colorado, USA, and 100kg of leachate
then shipped from Hazen to Kemetco in Richmond, British Columbia,
Canada.
• All samples were received as expected by the laboratories with no
missing or mis-labelled samples.
Criteria JORC Code explanation Commentary
Audits or
reviews
• The results of any audits or reviews of sampling techniques and data. • The testwork undertaken by Hazen and Kemetco was supervised by
metallurgists employed by Hazen and Kemetco. Hazen’s results were
reviewed by senior metallurgists and chemical engineers from Fluor
Corporation and Kemetco’s results were reviewed by a highly
experienced consultant metallurgist engaged by Jindalee.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
• The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
• Samples reported are all from land managed by the US Bureau of
Land Management, with the mineral rights held under placer and lode
claims owned 100% by HiTech Minerals Inc., a wholly owned US
based subsidiary of Jindalee Lithium Limited.
• No joint ventures or royalty interests are applicable.
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by other parties. • At McDermitt, historic uranium exploration by Chevron first identified
the presence of lithium. No data from historic work undertaken within
the McDermitt Project area has been obtained.
Geology • Deposit type, geological setting and style of mineralisation. • Lithium is hosted in flat-lying, lacustrine sediments deposited within
the Tertiary aged McDermitt caldera.
Drill hole
Information
• A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
• Please see tables and figures in previous releases referenced above.
Criteria JORC Code explanation Commentary
the understanding of the report, the Competent Person should clearly
explain why this is the case.
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used
for such aggregation should be stated and some typical examples of
such aggregations should be shown in detail.
• The assumptions used for any reporting of metal equivalent values
should be clearly stated.
• Significant intercepts are presented as a weighted average above a
1000ppm Li cut-off, with a maximum of 10 feet (3.05m) internal
‘waste’ (where ‘waste’ is defined as intervals with less than 1000ppm
Li) and a minimum downhole width of 20 feet (6.1m).
• Conversion from Li ppm to Li2O is achieved by multiplying by 2.153
and converting to %.
• Lithium carbonate equivalent (LCE) is calculated by taking the Li
value and multiplying by 5.323 to determine the molar equivalent in
standard industry fashion.
• Conversion from Mg ppm to MgO is achieved by multiplying by 1.658
and converting to %.
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly important in the reporting of
Exploration Results.
• If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (eg ‘down hole length, true
width not known’).
• Vertical drill holes were appropriate for assessing the flat lying units of
interest. Downhole lengths reported are therefore the same as true
widths.
Diagrams • Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view of
drill hole collar locations and appropriate sectional views.
• See previous releases referenced above
Balanced
reporting
• Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting of
Exploration Results.
• Only selected metallurgical test results relevant to this release have
been reported.
Other
substantive
exploration
data
• Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical
survey results; geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential
deleterious or contaminating substances.
• Field mapping across the project area, aerial photography and
description of stratigraphic sections exposed in several escarpments
allows for correlation of the geology between drill holes.
• Metallurgical test work is reported herein. Other data published is
from previous releases and references to these have been provided.
Criteria JORC Code explanation Commentary
Further work • The nature and scale of planned further work (eg tests for lateral
extensions or depth extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling areas,
provided this information is not commercially sensitive.
• Metallurgical testwork (previously announced) has indicated high
lithium and magnesium recoveries from leaching with sulphuric acid
at moderate temperature and atmospheric pressure and that the
mineralised material can be beneficiated using attrition scrubbing.
• Extensive metallurgical test work was completed in 2024 with results
included in the Pre-feasibility Study (PFS) announced 19 November
2024 (see previous releases referenced above).
• Market and engineering studies to assess the financial viability of
producing magnesium by-products will be undertaken, together with
further testwork to build on the results announced in this report.
• Additional drilling is planned to upgrade the mineral resource estimate
and obtain samples for large scale metallurgical testwork (lithium and
magnesium).