Corporate Presentation
Released
Released
Announcement PDF
JULY 2024
REALISING AMERICA’S
LARGEST LITHIUM
RESOURCE
Ian Rodger
Chief Executive Officer
INVESTOR
PRESENTATION
ASX:JLL
OTCQX:JNDAF
Jindaleelithium.com
Disclaimer
This Presentation has been prepared by Jindalee Lithium Limited (“Jindalee”, “Company” or “JLL”) and is authorised for release by its Chief Executive Officer, Mr Ian Rodger. Certain
information in this presentation has been derived from third parties and though Jindalee has no reason to believe that it is not accurate, reliable or complete, it has not been
independently audited or verified by Jindalee. Except to the extent required by law, Jindalee makes no representations or warranty as to the accuracy, reliability or completeness of
information in this document and does not take responsibility for updating any information or correcting any errors or omissions which may become apparent after this presentation is
released.
This presentation is for information purposes only. It is not a prospectus, product disclosure statement or other disclosure document under Australian law or any other law (and will not
be lodged with the Australian Securities and Investments Commission or any foreign regulator) and is not, and does not constitute, an invitation or offer of securities for subscription,
purchase or sale in any jurisdiction. In particular, this presentation does not constitute an invitation or offer of securities for subscription, purchase or sale in the United States or any
other jurisdiction in which such an offer would be illegal. The securities referred to in this presentation have not been and will not be registered under the U.S. Securities Act of 1993 as
amended or the securities laws of any state or other jurisdiction of the United States and may not be offered or sole, directly or indirectly in the United States.
This presentation may contain certain forward-looking statements. Forward-looking statements include but are not limited to statements concerning Jindalee’s current expectations,
estimates and projections about the industry in which Jindalee operates, and beliefs and assumptions regarding Jindalee’s future performance. When used in this document, the words
such as “anticipate”, “could”, “plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”, “should”, and similar expressions are forward-looking statements. Although Jindalee
believes that its expectations reflected in these forward-looking statements are reasonable, such statements are subject to known and unknown risks, uncertainties and other factors,
some of which are beyond the control of Jindalee and no assurance can be given that actual results will be consistent with these forward-looking statements.
Such factors may include, among others, risks related to results of current or planned exploration activities, changes in market conditions, obtaining appropriate approvals to undertake
exploration activities in the portfolio of projects, changes in exploration programs and budgets based upon the results of exploration, future prices of minerals resources; grade or
recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining government approvals or financing or in the completion of development or
construction activities; movements in the share price of investments and the timing and proceeds realised on future disposals of investments, force majeure events, as well as those
factors detailed from time to time in the Company’s interim and annual financial statements and reports, all over which are available for review on ASX at asx.com.au and OTC Markets
at otcmarkets.com.
Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking
statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue
reliance on forward-looking statements. To the extent permitted by law, Jindalee and its officers, employees, related bodies corporate and agents disclaim all liability, direct, indirect or
consequential (and whether or not arising out of the negligence, default, or lack of care of Jindalee and/or any of its agents) for any loss or damage suffered by a recipient or other
persons out of, or in connection with, any use or reliance on this presentation or information. This presentation does not constitute investment advice and has been prepared without
taking into account any investor's particular investment objectives, financial circumstances or particular needs and the opinions and recommendations in this presentations are not
intended to represent recommendations of particular investments to particular persons. You should seek professional advice when deciding if an investment is appropriate. All
securities transactions involve risks, which include (among others) the risk of adverse or unanticipated market, financial or political developments.
All amounts are in A$ unless stated otherwise.
Jindalee Lithium Overview
Key Investment Highlights
Pure play US lithium company focused on progressing the globally significant McDermitt Lithium Project
Largest Lithium Resource in the USA (21.5Mt LCE1)
Li
Emerging top tier, generational asset, mirroring the scale and style of Thacker Pass project,
currently under construction by Lithium Americas (TSX: LAC – Market Cap ~US$550M2, General
Motors offtaker and largest shareholder, with DoE construction loan of US$2.3B3).
Highly attractive potential source of lithium carbonate for US EV supply chain
Strategically located, shallow ore body, established flow sheet, with MoU4 with POSCO Holdings, a
major supplier and partner to General Motors in North America.
McDermitt poised to meet medium-term Lithium supply deficit
Lithium investment thesis remains robust. McDermitt likely well timed to come to market as EV
transition drives expected supply deficit later in the decade.
Strong Government Support
Eligible for a range of US government incentives such as the Biden Administration's US$369B
Inflation Reduction Act (IRA). 2 x grant funding applications in progress.
Pivotal year ahead
Several major value catalysts expected in 2H 2024 including; PFS completion, Lithium Carbonate
production from test-work, and ongoing engagement with US agencies and strategic partners.
4
1.
2.
3.
4.
Refer to J LL ASX release 27/02/2023 “Resour ce at McDermitt incr eases to 21.5 Mt LCE”
Based on market close 2nd July 2024, share pr ice US$2.53 and 217.4 million shares outstanding (source: S&P CapIQPr o)
Refer to Lithium Americas announcement 14th March 2024 link
Refer to J LL ASX release 13/02/2023 “MOU Executed with POSCO Holdings”
Company Overview
Share Price (ASX:JLL, OTCQX:JNDAF)
Proforma Corporate Snapshot1
Share Capital (ASX:JLL, OTCQX:JNDAF)
73.5m
A$/share
Share Price 2
A$0.30
4.50
Options (from 37c to $5.00)
25.9m
Market Capitalisation
5.00
4.00
3.50
A$0.31
3.00
A$22.1m
2.50
28/06/2024
2.00
Cash 1,3
Investments 4
A$7.0m
1.50
A$2.0m
0.50
Convertible Note
A$3.0m
Enterprise Value
A$16.1m
1. Based on completion of Placement, Tranche 1 & 2 convertible
notes and full uptake under the Entitlements Issue (JLL ASX
release 04/07/2024: “JLL Secures Funding to Advance McDermitt
Lithium Project”)
1.00
-
Major Shareholders 5
L G Dudfield
24.6%
Kale Capital Corporation Pty Ltd
8.6%
Citicorp Nominees Pty Ltd
3.8%
4. Share investments as at 02/07/2024
Kevrex Pty Ltd
3.5%
5 5. As at 02/07/2024
Elmix Pty Ltd
3.5%
2. Issue price of Placement and Entitlement Issue shares
3. Proforma cash balance, includes cash at 30/06/2024
Analyst: Michael Bentley
Valuation: $2.04/sh
CLICK HERE TO ACCESS RESEARCH
Board and Management team with proven success in
creating value for shareholders
d
d
Wayne Zekulich
Lindsay Dudfield
Ian Rodger
Brett Marsh
Darren Wates
Paul Brown
Non-Executive Chair
Executive Director
Chief Executive Officer
VP Exploration & Development
Non-Executive Director
Non-Executive Director
Mr Wayne Zekulich was
appointed to the Jindalee
Board as Chair on 1
February 2024. Wayne is
a Consultant and NonExecutive Director who
has substantial
experience in advising,
structuring and financing
transactions in the
infrastructure and
resources sectors. Wayne
is currently Chair of ASX
listed gold miner Pantoro
Ltd (ASX:PNR).
Mr Lindsay Dudfield is a
geologist with over 40
years’ experience in multicommodity exploration.
Lindsay has been
responsible for managing
Jindalee since inception,
guiding the Company
through the advancement
of several projects across
various commodities and
jurisdictions. He is also a
Non-Executive Director of
several ASX listed mineral
exploration companies.
Mr Ian Rodger is the
newly appointed CEO of
Jindalee. Ian is an
internationally
experienced mining
executive, with
experience as a mining
engineer working across
two large greenfield mine
developments with Rio
Tinto. He also has a broad
range of corporate
finance and commercial
experience, holding
senior roles at RFC
Ambrian, BHP and Oz
Minerals Ltd (ASX:OZL).
Mr Brett Marsh is a
Geologist with over 25
years of experience. He
has managed all phases
of the mining lifecycle
including greenfield and
brownfield exploration,
project development
(including preliminary
economic assessments,
pre-feasibility and
feasibility), project
construction, mine
operations, and
environmental.
Mr Darren Wates is a
corporate lawyer with
extensive experience in
equity capital markets,
M&A, resources, project
acquisitions / divestments
and corporate. Darren
was significantly involved
in the development, joint
venture partnering and
eventual sale of the Mt
Marion Lithium Project in
roles with ASX listed
company Neometals Ltd
(ASX:NMT).
Mr Paul Brown has over
23 years’ experience in
the mining industry, most
recently with Mineral
Resources (ASX:MIN)
where he was Chief
Executive – Lithium. He
has a strong track record
in project/studies
management and mine
planning and
management. Paul is
currently Chief Executive
Officer of Core Lithium
Ltd (ASX:CXO).
6
McDermitt strategically situated amidst the expansion of
the US battery supply chain
Ownership
100% owned by Jindalee
Location
• Located in Malheur County - on the
Oregon-Nevada border, ~35km west of the
town of McDermitt
• Strategically located in same geological
formation (McDermitt Caldera) as Lithium
Americas’ Thacker Pass Project (19.1Mt
LCE¹) which is under construction
History/Status
• 2018: Initial discovery drill program
• 2023: McDermitt becomes largest Lithium
deposit in USA. MoU with POSCO Holdings
announced4
• PFS due Q4 2024
Tenure and
Resource
• 54.6km2 claims area
Features
• Flat lying sediments with low strip ratio
• 3.0Bt @ 1,340ppm for 21.5Mt LCE3
• Ore is soft, amenable to low cost mining
and crushing
• Excellent metallurgical recoveries2
1.
7
2.
3.
4.
Refer to Lithium Americas TSX announcement 02/03/2023 “Lithium Americas to Develop US Sourced Lithium Pr oduction through $650 Million
Equity Investment and Supply Agreement”
Refer to J LL ASX release 18/01/2024 “Mor e Exceptional Metallurgical Results From McDermitt”
Refer to J LL ASX release 27/02/2023 “Resour ce at McDermitt increases to 21.5 Mt LCE”
https://newsroom.posco.com/en/posco-holdings-cooper ates-with-austr alias-jindalee-resources-limited-for-u-s-mcder mitt-clay-lithium-project/
Source: Federal Reserve B ank of Dallas; Company
announcements, media reports, NAATABATT, North
American Lithium-Ion Supply Chain Database
McDermitt Resource contains enough Lithium for >900 million EVs1
Potential to significantly contribute to the growth of the domestic US EV supply chain
✓ Large shallow flat lying sedimentary deposit, with potential to target higher grade zones
early in mine life to improve returns
✓ Exploration Target confirms excellent potential for further resource growth (300-700Mt @
1,100 - 1,400ppm Li)2
McDermitt Mineral Resource (2023)3
Cut-off
Grade
(ppm Li)
Indicated Resource
Inferred Resource
Tonnage
(Mt)
Li Grade
(ppm)
LCE
(Mt)
Tonnage
(Mt)
Li Grade
(ppm)
LCE
(Mt)
1,470
1,420
11.1
1,540
1,270
10.4
1,000
Indicated and Inferred
Resource
Li
Tonnage
LCE
Grade
(Mt)
(Mt)
(ppm)
3,000
1,340
21.5
Summary of 2023 McDermitt Mineral Resource Estimate at the reporting cut-off of 1,000ppm (totals may vary due to rounding)
Plan view of the 2023 Mineral Resource (at 1523mRL), completed
drilling, Section C-C’ and schematic conceptual Pit Shells 5 and 6
1.
2.
3.
EV = Electr ic Vehicles. Based on 21.7kg LCE per E V based on average passenger EV sold globally in Q3 2023,. Source Adamas Int elligence – link
Refer to J LL ASX release 21/11/2023 “Explor ation Tar get Highlights Further Upside at McDermitt”
Refer to J LL ASX release 27/02/2023 “Resour ce at McDermitt incr eases to 21.5 Mt LCE”
Flowsheet design has leveraged experience of more advanced peers
Similar flowsheet to Thacker Pass validated by LAC 1 via extensive pilot plant work and detailed due
diligence by General Motors (largest shareholder) and US DoE (US$2.3B construction loan 3)
As received ore
✓ Flowsheet consists of technology and equipment used in different industrial sectors
✓ Beneficiation results and leach recoveries highly encouraging 2
✓ Final phase of PFS test work underway to produce Lithium Carbonate, expected July 2024
Validated by PFS test work
PFS test work in process
Mineral Beneficiation
Process used in phosphate industry
Standard mine processing operations
Clay dewatering
Ore
from
mine
Sizer
Process Plant
Ion Exchange
Li2CO3
crystallisation
9
1.
2.
3.
Attrition
Scrubbing
Process used in hard rock conversion to
produce lithium chemicals
Mg & Ca
precipitation
Drying
Lithium Amer icas Cor poration (TSX: LAC)
Refer to J LL release 30/01/2024, “Quarter ly Cashflow & Activity Reports – December 2023”
Refer to Lithium Americas announcement 14th March 2024 link
Screen
Standard chemical process
MgSO4
crystallisation
Thickener
Traditional hydrometallurgy
Neutralisation/CCD
washing/filtration
Battery
grade
Li2CO3
Centrifuge
Acid
Leaching
Test work expected to produce
Battery Grade Lithium
Carbonate in July 2024
Neutralisation sighter
test-work
Highly encouraging results from McDermitt PFS workstreams
PFS completion expected in Q4 CY2024
✓
US engineering and construction firm Fluor Corp
appointed lead engineer for the PFS
✓
Exceptional results from metallurgical test work have
demonstrated high Lithium recoveries
✓
Engineering and cost estimation underway
✓
Mine design and planning work underway
✓
Several material value optimisation trade-off
opportunities (VO’s) now to be incorporated into PFS
✓
VO's expected to improve capital intensity and
operating costs (versus initial PFS scope)
✓
10
PFS completion now expected Q4 CY2024
(previously Q3 CY2024)
Potential Value Optimisations (VO’s)
Resource Utilisation
Potential to increase Run-of-Mine (ROM) grade in the initial years
to maximise returns
Process Plant
Potential to improve process conditions and/or sizing, to enhance
throughput and increase value
Beneficiation
Potential to optimise beneficiation stage to further elevate the
leach feed grade, alongside initiatives to decrease material costs
and optimise overall recovery
Project Development
Potential to investigate phased project development and to
increase value
US Government grant funding applications progressing with
estimated notification due by 2H CY 20241
Applications lodged with two US Government agencies (Defense and Energy) with strong support from state politicians,
agencies and potential industry partners
US Agency
Program
DPA Title III
Status
Use of Proceeds
Application submitted, passed initial reviews and under assessment
Accelerate McDermitt Feasibility Study and
associated drill program and test work
Engineering, procurement, construction and development
of a lithium processing facility at McDermitt
Co-fund
Co-fund
Expected Structure
Relative Quantum
11 1.
Battery Manufacturing and Recycling Grant
Refer to J LL ASX release 30/04/2024 “Jindalee Advances US Government Funding for McDermitt”
Capital Raising Overview
Capital Raise¹
Overview
▪ Jindalee is raising up to approximately $6.7m via an equity raise (placement + entitlement offer) and convertible note (toget her the “Capital Raise”)
▪ Confirmed commitments of $4.1m
▪ Jindalee is conducting the Offer to raise up to approximately $6.7m (before costs), comprising:
Equity Offer
Structure and Size
•
A placement to raise approximately $0.6m (“Placement”) via the issue of approximately 2.0m fully paid ordinary shares (“Shar es”); and
•
An entitlement offer to raise up to approximately $3.1m (“Entitlement Offer”) (together the Placement and Entitlement Offer are the “Offer”)
•
Both the Placement Shares and the Entitlement Offer Shares will include attaching options (details below)
•
Placement Shares to unrelated parties will be issued prior to the Entitlement Offer record date, therefore eligible for Entitlement Offer participation
▪ Offer price of $0.30 per Share, represents a discount of:
Offer Price
•
3.2% to Jindalee’s last closing of $0.31 per Share on 28 June 2024
•
3.9% to the 5-day VWAP of $0.312 per Share up to and including 28 June 2024
▪ Pro-rata non-renounceable Entitlement Offer to eligible shareholders
▪ 1 Entitlement Offer Share for every 6 Shares held on the record date (15 July 2024)
Entitlement Offer
▪ Entitlement Offer Shares to be offered at same price and basis as the Placement Shares
▪ Eligible shareholders will be able to apply for shares in excess of their entitlements (Top Up Securities)
▪ Entitlement Offer expected to close 29 July 2024
Attaching Options
▪ Every 2 Placement Shares and every 2 Entitlement Offer Shares will include 2 free attaching options (1 short term option and 1 long term option, together
“Attaching Options”)
•
Short term otion: exercise price of $0.40 and expiry date of 30 June 2025
•
Long term option: exercise price of $0.60 and expiry date of 30 June 2027
▪ The Company intends to apply for the Attaching Options to be quoted (subject to ASX approval)
▪ Completion of McDermitt PFS including identified value optimisation trade-off opportunities
Use of Proceeds
▪ US Operations (including metallurgical test work, exploration, permitting and community engagement)
▪ General working capital
Ranking
13
▪ New Shares issued under the Offer will rank equally with existing shares on issue
1. Refer to JLL ASX release 4 July 2024: “JLL Secures Funding to Advance McDermitt Lithium Project”
Convertible Note Details¹
Tranche 1
Funded Amount
Term
Face Value
Conversion
Subsequent
▪ $1.5m
▪ $1.5m
▪ Up to $9.0m
▪ 24 months from the date of issue
▪ 24 months from the date of issue
▪ 24 months from the date of issue
▪ 110% of Funded amount
▪ 110% of Funded amount
▪ 110% of Funded amount
▪ $0.345 if converted within 3 months
▪ After 3 months lesser of $0.345 and
90% of two lowest 20 day VWAPs
preceding conversion (“Variable
Conversion Price”)
▪ $0.20 Floor
▪ $0.345 if converted within 3 months
▪ After 3 months lesser of $0.345 and
Variable Conversion Price
▪ $0.20 Floor
▪ Higher of Variable Conversion Price and
65% of average VWAPs for 10 days
preceding conversion
▪ Subject to shareholder approval
▪ Subject to mutual agreement between
Jindalee and Mercer Street
▪ 2,027,026 Options (exercise price $0.37
within 24 months of issue)
▪ 576,738 Commencement Shares
▪ Options equal to 50% of subsequent
funded amount divided by $0.37
Conditions
Shares/Options
Tranche 2
▪ 576,738 Commencement Shares
▪ 2,027,027 Options (exercise price
$0.37 within 24 months of issue)
1. Refer to JLL ASX release 4 July 2024: “Jindalee Secures Funding to Advance McDermitt Lithium Project”
14
Funding to drive near term catalysts
Capital Raise proceeds to incorporate value
Sources of Funds2
optimisation trade off opportunities into McDermitt
Sources
PFS and support significant 2H 2024 milestones
Funding accelerates completion of key milestones in 2H 2024:
▪ Investigate value optimisation options for McDermitt PFS – possible
focus on high-grade/low strip mining in early years of Project
▪ Tribal Agreements (Q3)
▪ US Government technical cooperation & research agreement (Q3)
▪ Production of battery grade lithium carbonate from test work (Q3)
▪ Update on POSCO test work underway in Korea (Q3)
▪ Completion of optimised McDermitt PFS (Q4)
▪ Potential award decision for non-dilutive US Government grant funding1
(Q3/Q4)
▪ PFS completion (Q4)
▪ Commence strategic partnership/investment process (Q4)
▪ Progressing permitting activities and stakeholder engagement
▪ Potential additional metallurgical testwork post-PFS to establish
additional value improvements
15
Min (m)
Max (m)
Placement proceeds
$0.6
$0.6
Entitlement proceeds
$0.5
$3.1
Convertible proceeds
$3.03
$12.04
Total Sources
$4.1
$15.7
1.
2.
3.
4.
Refer to J LL ASX release 30/04/2024 “Jindalee Advances US Government Funding for McDermitt”
Refer to J LL ASX release 4 J uly 2024 “Jindalee Secur es up to $6.7M in Funding to Advance McDermitt Lithium Pr oject”
$3M includes proceeds from Tranche 1 & 2, noting that Tranche 2 ($1.5M) is subject to shar eholder appr oval
Up to $9M in additional funding available in subsequent tranche, subject to mutual agreement
Pivotal year ahead for Jindalee
De-risking is ongoing, with several major value catalysts expected in 2H 2024
COMMUNITY
ENGAGEMENT
STRENGTHEN
TEAM
✓ New Chair1 and CEO2
PARTNERSHIPS
Q3 2024
Update on POSCO test
work under MoU
Q3 2024
Accelerate engagement
with local Tribes and
community
Key appointments to
support transition to
developer
GOVERNMENT
SUPPORT
✓ Mineral Beneficiation
test-work
✓ DoE & DoD Grant
funding applications
submitted
Q3 2024
Production of Lithium
Carbonate
Q3 2024
US Agency technical
cooperation and
research agreement
2H 2024
Potential Award of
DoE/DoD Grants
1.
16 2.
Refer to J LL ASX release 27/12/2023 “Chair Transition”
Refer to J LL ASX release 4/12/2023 “Appointment of Ian Rodger as CE O”
Baseline studies
Q4 2024
Engage with potential
partners post PFS
TECHNICAL
DE-RISKING
✓ Leach test-work
PREPARATION
FOR NEXT
PHASE
Finalisation of
Exploration Plan of
Operations
DEFINE VALUE
POTENTIAL OF
MCDERMITT
Q4 2024
PFS Completion
Largest Lithium Resource in the USA
McDermitt compares favourably to
Sediment Hosted Peers3
Jindalee trades at an attractive valuation relative to peers
Enterprise Value (US$)1 / Contained LCE2 in Resources (t)
59
Resource (Mt)
3,500
Bubble size is contained LCE2 Mt
3,000
McDermitt
21.5
23
2,500
Series 1
Thacker Pass
6.7
1,500
Clayton Valley
1,000
3.5
500
Rhyolite Ridge
0
0
17
Sonora
TLC
7
9
Jindalee
Lithium
Century
Lithium
Arizona
Lithium
American
Lithium
Lithium
Americas
ioneer
Project/s
McDermitt
Clayton
Valley
Big Sandy +
Prairie4
TLC +
Falchani5
Thacker
Pass
Rhyolite
Ridge
Stage3
PFS
Underway
FS
Scoping
PFS
PEA
PEA
Construction
DFS
11
26
47
110
437
192
2,000
19.1
1
4
Enterprise
Value (US$M)1
8.8
3.3
Big Sandy
500 1,000 1,500 2,000 2,500 3,000 3,500
Resource Li Grade (ppm)
1.
2.
3.
4.
5.
Jindalee EV based on assumptions outlined on slide 5, converted to USD. All others sourced from S&P CapIQPr o 03/07/2024
LCE = Lithium Carbonate Equivalent. Data source: various company r eports
Source: various company reports. Refer Appendix 1 for detailed information
Arizona Lithium holds two development pr oject: a) Big Sandy Sediment Hosted project and b) Pr airie Brine Direct Lithium Extraction project
American Lithium holds two lithium development projects: a) Tonopah (TLC) Sediment hosted project and b) Falchini hard rock deposit. Metrics do not include Macusani Ur anium deposit
Thank you
Further information:
IAN RODGER
Chief Executive Officer
email: enquiry@jindalee.net
phone: +61 8 9321 7550
18
Supporting Slides
US bi-partisan support to de-risk critical minerals supply chain
Establishing a secure supply of Lithium is a priority for US given current reliance on China, which
produces c.55%1 of global lithium chemical supply and c.75%2 of lithium-ion batteries
World’s largest clay and hard rock lithium
projects. 1. McDermitt Lithium Project.
China Dominates the Global Lithium
Industry. Can the U.S. Ever Catch Up?
America's Military Needs to Detach Critical
Mineral Supply Chains From China
August 10, 2023
October 2, 2023
March 16, 2023
US to Ban Pentagon Battery Purchases From
China’s CATL, BYD
Senator Angus King: “Downright Dangerous,”
King says of U.S. Reliance on China for
Lithium
US is ‘10 to 20 years behind’ China in battery
production
January 20, 2024
Exxon to begin producing lithium to
feed surging battery demand
November 13, 2023
20
December 12, 2023
The US wants to end its reliance on
Chinese lithium. Its policies are doing the
opposite.
January 23, 2024
November 7, 2023
US lithium production: A vital pillar of national
security and energy independence
December 7, 2023
1.
2.
International Energy Agency – Wor ld Energy Outlook 2023
International Energy Agency - Global Supply Chains of EV Batteries
Lithium investment thesis
remains robust
Implied Lithium inventory in China’s supply chain2
(tonnes LCE)
▪ Short term softness driven by Chinese de-stocking and mismatch in short-term
demand/supply in rapidly growing market
▪ Recent lower prices have meant c.200kt LCE of higher cost supply has been “shut-in”1
▪ Lithium demand expected to grow from 1Mtpa in 2023 to 3.3Mtpa in 2030 (avg. CAGR
~19%)1, driven by EV transition
▪ Therefore, market deficit forecast to emerge over the medium-term, with investment
in new supply required to be incentivised in order meet demand 2
McDermitt poised to meet medium-term supply deficit
Inventory Change
Grid
Industrial
EV
3.3
Lithium Demand3
by Application (Mt LCE)
Lithium Supply and Demand4
(Mt LCE)
6
Consumer Electronics
Mobility
Probable
Highly Probable
Operating & Brownfield
Demand
5
2.3
4
Supply gap forecasted
despite dozens of new
projects announced
+28%
3
1.3
1.0
2
1
2040
2039
2038
2037
2036
2035
2034
2033
2032
2031
2030
2029
2028
2027
2026
2025
0
2024
2030E
2023
2027E
2022
2024E
2021
2023
Albemarle Q4 2023 r esults presentation and video conference
Fast markets 19 January 2024 link
Albemarle analysis from Q4 2023 results presentation
Benchmar k Minerals Q2 2023, weighted. Lithium Amer ica Feb 2024 Corporate presentation
2020
21
1.
2.
3.
4.
Wide range of incentives potentially
available to McDermitt
INFLATION REDUCTION ACT
Provides substantial incentives to boost domestic critical minerals and battery
production
▪
On 16 August 2022 the Inflation Reduction Act (confirming $369B in funding to reduce
carbon emissions by 40% by 2030) became law¹
▪
From 2023 40% of EV’s battery materials must be sourced from the US (or FTA partners)
to qualify for the EV tax credit (rising to 80% by 2027)
▪
Under the Advanced Production Credit (section 45X):
▪
Domestic battery manufacturers eligible for US$35 per Kwh
▪
Domestic miners/processors producing specified critical minerals will be eligible
for tax credits equivalent to 10% of production costs
▪
$40B is available to the DOE’s Innovative Technology Loan Guarantee to support
projects that bolster a domestic supply of critical minerals
▪
Also provided additional funding to other Department of Energy (DoE) and Department
of Defense (DoD) grant and loan programs
22
1.
https://www.congress.gov/bill/117th-congress/house-bill/5376/text
Recent examples of grant and loan funding
GRANTS (PRE-DEVELOPMENT PHASE)
✓ February 2024 – Perpetua Resources awarded an additional US$34.6M1 grant (total
US$59.4M) from DoD (under Defense Production Act Title III authorisations) for
construction readiness and permitting for Stibnite Gold and Antimony Project in Idaho
✓ November 2023 – Talon Metals Corp signs definitive agreement with DoE to provide
US$114.8M2 in grant funding (under Bipartisan Infrastructure Law) to co-fund Battery
Minerals Processing Facility in North Dakota
✓ September 2023 – Talon Metals Corp awarded US$20.6M3 in grant funding from DoD
(under Defense Production Act Title III authorisations) to co-fund Nickel exploration in
Minnesota & Michigan
LOANS (DEVELOPMENT PHASE)
✓ January 2023 – the DOE announced a US$700M conditional loan to the Rhyolite Ridge
Project (3.4Mt LCE4) to finance on-site processing of lithium carbonate5
•
March 2024 – Lithium Americas received conditional commitment for US$2.3B
construction loan6 from the DOE to fund c.75% of Thacker Pass Project capex
•
•
23
Interest: Treasury rates with 0% Spread
Tenor: 24 years
1.
2.
3.
4.
5.
6.
Source: Perpetua news release 12 Febr uary 2024 link
Source: Talon Metals news release 2 November 2023 link
Source: Talon Metals news release 12 September 2023 link
Source: ioneer website link
Source: Loan Programs Office news release 13 January 2023 link
Source: Lithium Amer icas news release 14 March 2024 link
Appendix 1: Peer Comparison Data
Comparable North American Sediment Hosted Lithium Deposits
Deposit
Thacker
Pass
Owner
TSX:LAC
Stage
Resource Category
FS Complete
Measured, Indicated &
Inferred
Measured, Indicated &
Inferred
Resource
(Mt)
1,754
Grade
(ppm Li)
Cut-off
(ppm Li)
Contained
LCE (Mt)
Source
19.1
Company website –
Feasibility Study November
2022
2036
1047
351
1739
1090/
5000 B*
3.3
559
2962
1000
8.8
Bacanora Lithium website –
announcement January
2018
Company website –
announcement April 2024
Rhyolite
Ridge
ASX:INR
DFS Complete
Sonora
Ganfeng
PFS Complete
McDermitt
ASX:JLL
PFS
underway
Indicated & Inferred
3,000
1340
1000
21.5
Company website –
announcement February
2023
Clayton
Valley
TSXV:LCE
PFS Complete
Measured, Indicated &
Inferred
1,325
945
200
6.7
Company website – June
2024
Share your feedback
Discover